ABOUT BRUNEI DARUSSALAM  BRUNEI PROFILE GOVERNMENT : Malay Islamic  Monarchy, Independence on 1st  January 1984 LOCATION...
TYPES OF SANITATION FACILITIES SANITATION  IN BRUNEIPIT LATRINES                                                      CEN...
SANITATION COVERAGE IN BRUNEI                     Estimated                        Estimated                       Estimat...
SEWERAGE VACUUM SYSTEM HOUSEHOLD                                         HDPE VACUUM                                      ...
SEWERAGE PROJECTS                           NDP 2007-2012Total of 20 projects with overall cost B$139,875,000.00 (US$97mil...
SEWERAGE PROJECTSNDP (2007-2012)                                          916-019                                         ...
STRATEGIC GOALS   TARGET DATES                     STRATEGY                      REMARKS                           Greater...
STRATEGIC FORESIGHTING                         8
Thank You            9
Upcoming SlideShare
Loading in …5
×

Sanitation Development in Brunei Darussalam

706 views

Published on

Sanitation Development in Brunei Darussalam

1 Comment
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total views
706
On SlideShare
0
From Embeds
0
Number of Embeds
82
Actions
Shares
0
Downloads
16
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide

Sanitation Development in Brunei Darussalam

  1. 1. ABOUT BRUNEI DARUSSALAM BRUNEI PROFILE GOVERNMENT : Malay Islamic Monarchy, Independence on 1st January 1984 LOCATION : North-West of Borneo Island in South Eastern Asia, Longitudes Between 114 deg 04’E & 115 deg 23’E And Latitudes Between 4 deg 00’N & 5 deg 05’N CAPITAL : Bandar Seri Begawan AREA : 5,765 sq. km. POPULATION : 398,000(mid-year of 2008) CLIMATE : Tropical Equatorial 1
  2. 2. TYPES OF SANITATION FACILITIES SANITATION IN BRUNEIPIT LATRINES CENTRALISED SEWERAGE CENTRALISED SEWERAGEDIRECT TO SYSTEM INCLUDING SEWAGE SYSTEM INCLUDING SEWAGE TREATMENT WORKS TREATMENT WORKS GROUND OR WATERCOURSESSEPTIC TANKS EITHER TO SOAKAWAY OR DRAIN/RIVERSEWERAGE SYSTEM FOR TREATMENT AND/OR DISPOSAL SEPTIC TANK WITH SOAKAWAY SEPTIC TANK WITH SOAKAWAY PIT LATRINE PIT LATRINE DIRECT DISCHARGE OF SEWAGE DIRECT DISCHARGE OF SEWAGE TO RIVER TO RIVER 2
  3. 3. SANITATION COVERAGE IN BRUNEI Estimated Estimated Estimated Estimated Population No. of Houses No. of Urban Houses No. of Rural Houses Septic Septic Urban Rural Total 1 Urban Rural Total 2 Sewer Other Sewer Other Tank TankNational 236,984 95,860 332,844 43,204 12,492 55,696 49% 46% 5% 0% 65% 35% Note: 1. Extracted from Table 1.6 Summary Tables of the population Census 2001 JPKE 2. Extracted from Table 13.1 Summary Tables of the population Census 2001 JPKE POPULATION SEWER SYSTEM CONNECTIONS 90% Public Sewerage and Septic Tank Public Sewerage system only with total length 40% of sewer pipe 740km 3
  4. 4. SEWERAGE VACUUM SYSTEM HOUSEHOLD HDPE VACUUM VACUUM PUMPSANITARY PIPES MAIN STATION VACUUM COLLECTION POT/CHAMBER SEWAGE TREATMENT PLANT SEWAGE TREATMENT PLANT BOLKIAH ‘A’ AND ‘B’ WATER VILLAGES 4
  5. 5. SEWERAGE PROJECTS NDP 2007-2012Total of 20 projects with overall cost B$139,875,000.00 (US$97millions).The projects are categorized into 5 groups which are as follows:1. Upgrading of Sewage Treatment Plant (4 projects) - B$37M2. Extension of Main Sewer line (2 projects) - B$14M3. Sewer pipe connection to Main Sewer line (10 projects) - B$65.375M4. New Sewerage Scheme (3 projects) - B$19M5. Sewerage Asset Management - B$4.5M Total : B$139.875M (US$97millions) 5
  6. 6. SEWERAGE PROJECTSNDP (2007-2012) 916-019 916-020 916-021 916-023 916-022 916-025 916-035 916-029 916-028 916-027 916-026 916-018 916-034 916-033 916-032 916-017 916-024 916-030 916-031 Legends: Upgrading of Sewage Treatment Plant Extension of Main Sewer line Sewer pipe connection to the Main Sewer line New Sewerage Scheme 6
  7. 7. STRATEGIC GOALS TARGET DATES STRATEGY REMARKS Greater access to high quality sewerage system in line with5% increase every NDP the Millennium Development Currently at 40% sewer. Goal 7 (Ensure Environmental Sustainability). 7
  8. 8. STRATEGIC FORESIGHTING 8
  9. 9. Thank You 9

×