An Auckland Council Organisation
Sustainability case study:
Wynyard Quarter – developing a new form of
partnership
John Da...
Influence and public ownership
Waterfront Auckland area of public ownership
Waterfront Auckland area of influence
The Waterfront Vision
WATERFRONT PLAN - KEY PROJECTS
1. Waterfront-wide walkway & cycleway
2. Upgraded Harbour Bridge park
3. Westhaven marine v...
KEY STRATEGIES
ADAPTION TO CHANGE
ADAPTION TO CHANGE
North Wharf
Shows king tide level
below wharf structure,
2014
ADAPTION TO CHANGE
Westhaven marina
Shows king tide level
at tidal (rock) wall,
2014
ADAPTION TO CHANGE
Westhaven marina
Shows king tide level
at western edge,
2014
EXEMPLAR PROJECTS
EXEMPLAR PROJECTS
JELLICOE STREET PRECINCT – As it was JELLICOE STREET PRECINCT – Today
EXEMPLAR PROJECTS
North Wharf and Viaduct Events Centre
EXEMPLAR PROJECTS
Karanga Plaza
EXEMPLAR PROJECTS
Silo Park
EXEMPLAR PROJECTS
Jellicoe Street
EXEMPLAR PROJECTS
Daldy Street, stage one during construction Daldy Street, artists impression of completion
EXEMPLAR PROJECTS
Shed 10
EXEMPLAR PROJECTS
Lysaght Building
SUSTAINABLE TRANSPORT
SUSTAINABLE TRANSPORT
70/30 MODAL SPLIT
Residents and Workers
AM Peak trips at Full Build Out
Car
Pool
PT Walk Taxi Cycle Other Work at
Home
SoV...
SUSTAINABLE TRANSPORT
SUSTAINABLE TRANSPORT
SUSTAINABLE TRANSPORT
SUSTAINABLE TRANSPORT
RENEWABLE ENERGY
RENEWABLE ENERGY
Shed 10 solar array
RENEWABLE ENERGY
Wynyard Central PV panels
HIGH PERFORMANCE GREEN BUILDINGS
HIGH PERFORMANCE GREEN BUILDINGS
Partnership parameters
Obligations
• Development objectives
• Reference designs
• Design guidelines
• Enforceable sustaina...
COMMERCIAL
COMMERCIAL
COMMERCIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
NEW PUBLIC SPACE
NEW PUBLIC SPACE
John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership
John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership
John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership
John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership
John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership
John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership
John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership
Upcoming SlideShare
Loading in …5
×

John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership

8,093 views

Published on

John Dalzell delivered the presentation at the 2014 NEW ZEALAND INFRASTRUCTURE SUMMIT.

The New Zealand Infrastructure Summit brings you the most up to date infrastructure news combining case studies and key presentations, addressing developments in the some of the main infrastructure hubs, such as Auckland and Christchurch.

For more information about the event, please visit: http://www.informa.com.au/nzinfra14

Published in: Design, Travel, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
8,093
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
25
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

John Dalzell, Chief Executive, Waterfront Auckland - Case Study –Wynyard Quarter, developing a new form of partnership

  1. 1. An Auckland Council Organisation Sustainability case study: Wynyard Quarter – developing a new form of partnership John Dalzell, Chief Executive, Waterfront Auckland April 2014
  2. 2. Influence and public ownership Waterfront Auckland area of public ownership Waterfront Auckland area of influence
  3. 3. The Waterfront Vision
  4. 4. WATERFRONT PLAN - KEY PROJECTS 1. Waterfront-wide walkway & cycleway 2. Upgraded Harbour Bridge park 3. Westhaven marine village 4. Marina land and water space development 5. St Mary’s Bay open space 6. Improved water quality 7. Road improvementson Westhaven Drive 8. Wynyard Quarter urban regeneration 9. Headland Park 10. Signature public building 11. Wynyard yacht basin 12. Vos and Brijs heritage slipway 13. Wynyard Wharf ferry terminal 14. Team New Zealand base 15. Fishing industry waterspace 16. Superyacht refit facility 17. Daldy Linear Park 18. Innovation precinct 19. Waterfront transit to Britomart 20. Urban boulevard 21. Greening of Waitemata Plaza 22. Harbour Edge Stitch 23. Halsey Street Wharf extension 24. Voyager NZ Maritime Museum entrance 25. Queens Wharf public space and cruise facility 26. Passenger ferry terminal improvements 27. Harbour Edge Stitch (Quay Street and Admiralty Steps) 28. Laneways 29. TEAL Park 30. Quay Park Quarter urban regeneration
  5. 5. KEY STRATEGIES
  6. 6. ADAPTION TO CHANGE
  7. 7. ADAPTION TO CHANGE North Wharf Shows king tide level below wharf structure, 2014
  8. 8. ADAPTION TO CHANGE Westhaven marina Shows king tide level at tidal (rock) wall, 2014
  9. 9. ADAPTION TO CHANGE Westhaven marina Shows king tide level at western edge, 2014
  10. 10. EXEMPLAR PROJECTS
  11. 11. EXEMPLAR PROJECTS JELLICOE STREET PRECINCT – As it was JELLICOE STREET PRECINCT – Today
  12. 12. EXEMPLAR PROJECTS North Wharf and Viaduct Events Centre
  13. 13. EXEMPLAR PROJECTS Karanga Plaza
  14. 14. EXEMPLAR PROJECTS Silo Park
  15. 15. EXEMPLAR PROJECTS Jellicoe Street
  16. 16. EXEMPLAR PROJECTS Daldy Street, stage one during construction Daldy Street, artists impression of completion
  17. 17. EXEMPLAR PROJECTS Shed 10
  18. 18. EXEMPLAR PROJECTS Lysaght Building
  19. 19. SUSTAINABLE TRANSPORT
  20. 20. SUSTAINABLE TRANSPORT
  21. 21. 70/30 MODAL SPLIT Residents and Workers AM Peak trips at Full Build Out Car Pool PT Walk Taxi Cycle Other Work at Home SoV Total 14.2% 31.6% 16.4% 1.0% 2.9% 1.9% 2.1% 30.0% 100% 2257 5035 2569 152 455 304 325 4756 13989
  22. 22. SUSTAINABLE TRANSPORT
  23. 23. SUSTAINABLE TRANSPORT
  24. 24. SUSTAINABLE TRANSPORT
  25. 25. SUSTAINABLE TRANSPORT
  26. 26. RENEWABLE ENERGY
  27. 27. RENEWABLE ENERGY Shed 10 solar array
  28. 28. RENEWABLE ENERGY Wynyard Central PV panels
  29. 29. HIGH PERFORMANCE GREEN BUILDINGS
  30. 30. HIGH PERFORMANCE GREEN BUILDINGS
  31. 31. Partnership parameters Obligations • Development objectives • Reference designs • Design guidelines • Enforceable sustainability standards • Precinct rules • Community infrastructure policy • Housing policy Enhancements • Six star commercial developments • Residential development reaches stretch targets • A ‘living building challenge’ exemplar project • NZ engineered timber construction • Eco-precinct initiatives • Enhancements to community infrastructure • Control of ground floor activation
  32. 32. COMMERCIAL
  33. 33. COMMERCIAL
  34. 34. COMMERCIAL
  35. 35. RESIDENTIAL
  36. 36. RESIDENTIAL
  37. 37. RESIDENTIAL
  38. 38. NEW PUBLIC SPACE
  39. 39. NEW PUBLIC SPACE

×