Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Intelligent motorized wall painting crane

32 views

Published on

  • Be the first to comment

  • Be the first to like this

Intelligent motorized wall painting crane

  1. 1. INTELLIGENT MOTORIZED WALL PAINTING CRANE ABSTRACT:  This project deals with the fabrication of Motorized wall Painting crane. The aim of this project work is to acquire practical knowledge in the field of complicated wall painting with the help of motor. The project work is concerned with the fabrication of the portable motorized crane. This machine is very useful for lifting and carrying heavy loads such as painting equipment, painting person and etc. SCOPE OF THE PROJECT:  The very essence of our economic life and growth is dependant in a great part upon the continued improvement and development of the electronic and mechanical fields. To aid these fields, we have MOTORIZED WALL PAINTING CRANE, Mechanical type, which can be widely used to lift the less weight or heavy weigh workpieces and etc. Extreme care should be taken while lifting the load in the jib crane layout. ECWAY TECHNOLOGIES IEEE PROJECTS & SOFTWARE DEVELOPMENTS OUR OFFICES @ CHENNAI / TRICHY / KARUR / ERODE / MADURAI / SALEM / COIMBATORE BANGALORE / HYDRABAD CELL: 9894917187 | 875487 1111/2222/3333 | 8754872111 / 3111 / 4111 / 5111 / 6111 Visit: www.ecwayprojects.com Mail to: ecwaytechnologies@gmail.com
  2. 2. ADVANTAGES Its advantage over conventional systems are listed below 1. Compact: -Because of high speed and pressure capabilities they have a very small weight to power output ratio. 2. Predictable performance: -Losses are minimum due to less number of moving parts and so gives expected performance. 3. Noise vibration control: -Due to elegant and simple control systems, it does silent operation and no vibration is produced. 4. Longer life 5. Flexibility 6. Efficient and dependable. 7. Simple installation. 8. Easy maintenance.
  3. 3. LIMITATIONS 1. Electric shock is always there, which makes the machines ugly and dust and dirt are adhering to them. 2. The life of the parts, like seals, packing and gaskets etc., are very short. But they are essential to prevent leakage. 3. Motor cost of this system becomes costlier. PROJECT PLANNING Before starting any project, its planning is done; planning is a very important task and should be taken up with great care, as the efficiency of the whole project depends largely upon the planning. While planning the project each and every detail should be worked out in anticipation and all the relative provisions should be carefully considered in advance. Project planning consists of the following steps. PROJECT CAPACITY The capacity of the project work must be decided considering the amount of money to be invested and the availability of materials and machines.
  4. 4. DESIGN AND DRAWING Having been decided about the project to be manufactured, it must be designed. The work of the design should be done very carefully considering all the relevant factors. After designing the project, its detailed drawings are prepared so that no doubts are left for future. Detailed specifications of the raw materials and finished products should be decided carefully along with the specifications of the machine required for their manufacture. This project work is designed by considering all the particle difficulties while fabricating, in advance. MATERIALS REQUIREMENT The list of the material requirement is prepared from the drawings. “This list is known as the “BILL OF MATERIALS”. This can be passed to the storekeeper and the required materials are taken from the store under permission of the storekeeper. OPERATION PLANNING Next work of planning is to select the best method of manufacture, so that wastage of raw material, idle time of the man and machinery and total manufacture time are restricted. Machine tools required to do the jobs are considered, while planning the operation. After considering the above questions, best method is developed and applied.

×