Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Inventory & Manufacturing System Employing E-Business Suite

  • Be the first to comment

  • Be the first to like this

Inventory & Manufacturing System Employing E-Business Suite

  1. 1. Janhangirnagar University JCL Presented by Md. Moktarul Islam ID:ESUA 132068 Jahangirnagar University Supervised by Professor Dr. Mohammad Hanif Ali Department Of CSE Jahangirnagar University
  2. 2. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  3. 3. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  4. 4. Janhangirnagar University JCL SDLC Process Jahangirnagar University Requirement: Collect Business Data Design: Describes desired features and operations Implementation: The real code and configure Testing: Testing environment, then checks for errors, bugs Installation: The final stage of initial development Maintenance: During the maintenance stage of the SDLC, the system is assessed to ensure it does not become obsolete
  5. 5. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  6. 6. Janhangirnagar University JCL Organization (JCL) Sub inventory / Physical Store Locator Jahangirnagar University Inventory Management System
  7. 7. Janhangirnagar University JCL Purchase Requisition/ Purchase Order INVENTORY Supplier’s Invoice / Sundry Creditors / Payments Receive Materials / Assets Inspect Materials / Assets Deliver Materials / Assets Store Materials Issue Materials Transfer Materials Return/Reject Materials Cost Materials Account for Materials Jahangirnagar University Inventory Management System
  8. 8. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  9. 9. Janhangirnagar University JCL In ERP prospective manufacturing operation can be broadly classified into three major category: Flow manufacturing Discrete manufacturing Process manufacturing RM RM RMRM Sub - Assembly Sub - Assembly Finish Goods Jahangirnagar University Manufacturing System
  10. 10. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  11. 11. Janhangirnagar University JCL • Oracle E Business suite R12 • Oracle Form Developer 10g • Oracle report Developer 10g • Oracle BI Publisher • TODE for oracle • Data Loader Jahangirnagar University Development Tools
  12. 12. Janhangirnagar University JCL Three Tier Architecture Oracle E-Business Suite also known as oracle apps/oracle EBS is a agglomeration of software/computer applications like Enterprise resource planning (ERP) ,Customer relationship management (CRM), Supply chain management (SCM), Human resource management system (HRMS) etc. Jahangirnagar University Development Tools (EBS)
  13. 13. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  14. 14. Janhangirnagar University JCL Purchase Recieve Receipts Inspection Accept Return To Supplier Inventory Receive RM Sub Inv. RM Sub Inv. Production Line SFG Line Shipment Customer Order Sales R & D Product Design Product ScheduleSales Analysis Sales Forecast Sub Inv. NO YES Jahangirnagar University Overall Logical Design
  15. 15. Janhangirnagar University JCL Jahangirnagar University Configure E- Business Suite
  16. 16. Janhangirnagar University JCL Jahangirnagar University Configure E- Business Suite
  17. 17. Janhangirnagar University JCL Jahangirnagar University Configure Inventory Organization
  18. 18. Janhangirnagar University JCL Configure Inventory ITEM
  19. 19. Janhangirnagar University JCL Jahangirnagar University Configure Inventory UOM
  20. 20. Janhangirnagar University JCL Jahangirnagar University Configure Sub Inv. & Locator
  21. 21. Janhangirnagar University JCL Jahangirnagar University Configure Bill of Material
  22. 22. Janhangirnagar University JCL Jahangirnagar University Setup Work In Process Parameter
  23. 23. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  24. 24. Janhangirnagar University JCL SQL query by TODE 11.5 Convert SQL to RDF Format Convert RDF to XML for Design Template Design develops by Microsoft and Preview report through PDF Format Registering into Application Server and Request group Send report (RDF) to application server Jahangirnagar University Report Develop
  25. 25. Janhangirnagar University JCL Jahangirnagar University Report Develop (SQL Query) BOM wise Component Item Cost select bsb.assembly_item_id, msi.concatenated_segments assembly_code, msi.description assembly_desc, msi.primary_unit_of_measure, bsb.organization_id, bsb.creation_date, bsb.created_by, bcb.operation_seq_num, bcb.component_item_id, msii.concatenated_segments, msii.description, msii.primary_unit_of_measure, bcb.item_num, bcb.component_quantity,round(xx_inv_pkg.get_item_cost(bsb.organization_id,bcb.co mponent_item_id),4) component_cost, nvl(bcb.component_quantity,0) *
  26. 26. Janhangirnagar University JCL Jahangirnagar University Report Develop (SQL Query) BOM wise Component Item Cost nvl(xx_inv_pkg.get_item_cost(bsb.organization_id,bcb.component_item_id),0) comp_amt from bom_structures_b bsb, bom_components_b bcb, mtl_system_items_kfv msi, mtl_system_items_kfv msii where bsb.bill_sequence_id = bcb.bill_sequence_id --AND BSB.BILL_SEQUENCE_ID = 53727 and bsb.assembly_item_id = msi.inventory_item_id and bsb.organization_id = msi.organization_id and bcb.component_item_id = msii.inventory_item_id and msi.organization_id = msii.organization_id and msi.inventory_item_id <> msii.inventory_item_id and (:p_org_id is null or bsb.organization_id = :p_org_id) and (:p_asmb_item_id is null or bsb.assembly_item_id = :p_asmb_item_id) and (trunc(bsb.creation_date) between :p_date_fr and :p_date_to or :p_date_fr is null or :p_date_to is null)
  27. 27. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  28. 28. Janhangirnagar University JCL Inventory Production Receiving Q.C ForkPckaging Receipt Shipping R&D Inventory Planning Inventory Jahangirnagar University Transaction Flow
  29. 29. Janhangirnagar University JCL Jahangirnagar University Login E-Business Suite
  30. 30. Janhangirnagar University JCL Jahangirnagar University Receipt Materials
  31. 31. Janhangirnagar University JCL Jahangirnagar University Inspection Materials
  32. 32. Janhangirnagar University JCL Jahangirnagar University Receive Materials
  33. 33. Janhangirnagar University JCL Jahangirnagar University Checking On Hand ORGANIZATI ON_ID INVENTORY _ITEM_ID SUBINVENT ORY_CODE TRANSACTIO N_QUANTIT Y 82 77440 JU STG ST 10 82 77440 JU STG ST 10 82 77440 JU STG ST 10 SELECT ORGANIZATION_ID,INVENTORY_ITEM_ID,SUBINVENT ORY_CODE,TRANSACTION_QUANTITY FROM MTL_ONHAND_QUANTITIES WHERE SUBINVENTORY_CODE='JU STG ST';
  34. 34. Janhangirnagar University JCL Jahangirnagar University Transfer and Issue materials
  35. 35. Janhangirnagar University JCL Jahangirnagar University Issue materials (DFF)
  36. 36. Janhangirnagar University JCL Jahangirnagar University Transfer and Issue materials
  37. 37. Janhangirnagar University JCL Jahangirnagar University JOB Create-Finish Goods
  38. 38. Janhangirnagar University JCL Jahangirnagar University BOM Wise Material Stock Report
  39. 39. Janhangirnagar University JCL Jahangirnagar University Move Finish Goods
  40. 40. Janhangirnagar University JCL Jahangirnagar University Finish Goods Receive
  41. 41. Janhangirnagar University JCL Jahangirnagar University BOM Wise Cost Report
  42. 42. Janhangirnagar University JCL Results and Analysis Jahangirnagar University
  43. 43. Janhangirnagar University JCL Item Ledger or Item Movement report Jahangirnagar University
  44. 44. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Project Outcome Outlines Jahangirnagar University
  45. 45. Janhangirnagar University JCL Jahangirnagar University Project Outcome  Overall business goes to automation  Accounting, Journal, Balance sheet auto created  Business Transparency  Integrated application and Database  Its Also Integrate to mobile communication  Reduce Number Of Instance
  46. 46. Janhangirnagar University JCL • SDLC Process • Inventory Management System • Discrete Manufacturing • Development Tools • Design and Setup Oracle E-Business Suite • Report Developed • Transaction Flow With Output • Performance Analysis Outlines Jahangirnagar University
  47. 47. Janhangirnagar University JCL  Think Globally to make the right decisions  Work Globally to be more productive  Manage Systems Globally to lower cost and increase performance Jahangirnagar University Performance Analysis
  48. 48. Janhangirnagar University JCL Jahangirnagar University

×