iCSlide's client

521 views

Published on

iCSlide's client

  • Be the first to comment

  • Be the first to like this

iCSlide's client

  1. 1. Go No Blank SAtCirendang & Kuningan
  2. 2. Step Installation Combat Installation Transmisi Installation BTS Installation
  3. 3. Installation Method Problem identification Planning Transmisi Technical Checking & Monitoring Verification CME Instalation
  4. 4. The Front Side ViewCombat Kuningan Kota Installation
  5. 5. Sambungan TowerCombat Kuningan Kota Installation
  6. 6. Pedestal Tower ViewCombat Kuningan Kota Installation
  7. 7. Top View Vertical TrayCombat Kuningan Kota Installation
  8. 8. Indoor ShelterCombat Kuningan Kota Installation
  9. 9. Highlight CME Problems
  10. 10. Highlight CME Problems
  11. 11. Highlight CME Problems
  12. 12. Highlight CME Problems
  13. 13. Highlight CME Problems
  14. 14. Highlight CME Problems
  15. 15. Highlight CME Problems
  16. 16. Highlight CME Problems
  17. 17. Highlight CME Problems
  18. 18. Highlight CME Problems
  19. 19. Highlight CME Problems
  20. 20. Highlight CME Problems
  21. 21. Result Summary Unstandardized PLN Power Improperly-installed bolt Improperly-installed Tower Supporting W Lightning Rod is not installed Grounding resistance is more than 1 oh
  22. 22. Highlight Combat Cirendang Instal
  23. 23. Result Summary Unstandardized PLN Power Improperly-installed bolt The Tower Foot Holder is Unstandardiz Lightning Rod is not installed Grounding resistance is more than 1 oh
  24. 24. Transmisi installation Combat Kuningan kota Install Newlink mle cmbt kuningan - kadug Combat Combat Cirendang Install Newlink mle cmbt Cirendang – Gn.Installation Support by : Kisel, Module Support by : SS Jabar
  25. 25. Transmisi installation
  26. 26. Capture Transmisi MLE Combat Ku RSL Result
  27. 27. Capture Transmisi MLE Combat Ku Interference Result
  28. 28. PDH Mini Link Erricson (4 E1) 36 m Tower HeightTransmisi ReportCombat Kuningan30 m Antenna mw Height Kota 33 m Antenna Sectoral Height
  29. 29. 7GHz/37/7341.5MHz (Tx Band/Sub Band/ Tx Freq) 12 dBm Tx PowerTransmisi ReportDistance 3.7 KmCombat Kuningan Kota Link Route cmbt kngkota (mle syst.1) kadugede (fiu syst 13) ciporang
  30. 30. Tx/Rx Power Cmbt Kuningan Kota 12 dBm / 52.5 dBmTransmisi ReportPower Kadugede Tx/Rx 12 dBm / 52.9 dBmCombat Kuningan Kota Interference check 95.7 dBm
  31. 31. Combat Cirendang
  32. 32. Capture Transmisi MLE Cmbt C RSL Result
  33. 33. Capture Transmisi MLE Cmbt C Interference Result
  34. 34. PDH Mini Link Erricson (4 E1)Transmisi Report 36 m Tower HeightCombat Cirendang mw Height 30 m Antenna 34 m Antenna Sectoral Height
  35. 35. 7GHz/37/7321.5MHz (Tx Band/Sub Band/ Tx Freq)Transmisi Report 12 dBm Tx PowerCombat Cirendang 3.9 Km Distance Link Route cmbt cirendang (mle syst.1) Gn Keling (Ceragon syst 6) ciporang
  36. 36. Tx/Rx Power Cirendang 12 dBm / 41 dBmTransmisi ReportPower GndBm Tx/Rx 12 dBm / 44.1 KelingCombat Cirendang Interference check 83.6 dBm
  37. 37. BTS Installation Combat Kuningan MD (4/4/3)
  38. 38. BTS Installation Combat Kuningan MD (4/4/3)
  39. 39. BTS Installation Monitoring Alarm Combat Cirendang
  40. 40. BTS Installation Monitoring Alarm Combat Kuningan Kota
  41. 41. Correction Hasil Instalasi CME yang Nok Instalasi link lamban, karena moduel fa dari cibolerang Instalasi link terkesan tidak terplanning karena menggunakan 7GHz di jarak No Path quality report dari mitra instala Alokasi BTS dismantle yang tidak sesu plan combat. Teralokasikan bts outdo combat cirendang
  42. 42. Result Installation No blankspot di cirendang & rest area k No blankspot di sekitar area kuningan k rsud kuningan High traffic. Prefer to upgrade 2g trx an proposed bts 3g
  43. 43. Reparenting SGSN Masukan konten anda di sini
  44. 44. Rehoming Msc classi Masukan konten anda di sini
  45. 45. Thank You For Your Atte

×