SANDRA SASSOW,CEO<br />Energy LTD<br />MUCKBUSTERTM<br />5kW SMALL ANAEROBIC DIGESTER<br /><ul><li>Designers of Renewable ...
Contract Manufacturing Secured with large firms
Pipeline £20M GBP – 20% follow-on after proof
60% customers want both products
Channel partners signed UK, USA, France, & eight other countries
First orders shipping by End of 2010</li></ul>WINDBUSTERTM<br />5KW VERTICAL AXIS WIND TURBINE<br />SEaB Energy Ltd ©     ...
SEaB Energy Organisational Structure<br />SEaB Energy Ltd ©     Confidential<br />2<br />
SEaB Energy Ltd ©     Confidential<br />3<br />
MUCKBUSTERTM<br />2.4m<br />Digestion Tank<br />(20,000L)<br />Gas Storage Tank<br />(1500L)<br />2.9m<br />Pasteurization...
MUCKBUSTERTM<br /> Reseller Contracts Already Signed<br />Our Opportunities:<br />WHO NEEDS ONE?<br />Market size  UK 2M u...
WINDBUSTER™Vertical Axis Wind Turbine<br />SEaB Energy Ltd ©     Confidential<br />6<br />
WINDBUSTERTM<br />Anemometer<br />GRP Blade<br />6m Length -Eliptical design wind capture from all directions<br />Electro...
Upcoming SlideShare
Loading in …5
×

SeaB's pitch

904 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
904
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Any questions
  • SeaB's pitch

    1. 1. SANDRA SASSOW,CEO<br />Energy LTD<br />MUCKBUSTERTM<br />5kW SMALL ANAEROBIC DIGESTER<br /><ul><li>Designers of Renewable Energy Solutions</li></ul> Off-Grid or On-Grid 5kW – 50kW<br /><ul><li>2 Initial Products – Pre-production Units Tested
    2. 2. Contract Manufacturing Secured with large firms
    3. 3. Pipeline £20M GBP – 20% follow-on after proof
    4. 4. 60% customers want both products
    5. 5. Channel partners signed UK, USA, France, & eight other countries
    6. 6. First orders shipping by End of 2010</li></ul>WINDBUSTERTM<br />5KW VERTICAL AXIS WIND TURBINE<br />SEaB Energy Ltd © Confidential<br />1<br />
    7. 7. SEaB Energy Organisational Structure<br />SEaB Energy Ltd © Confidential<br />2<br />
    8. 8. SEaB Energy Ltd © Confidential<br />3<br />
    9. 9. MUCKBUSTERTM<br />2.4m<br />Digestion Tank<br />(20,000L)<br />Gas Storage Tank<br />(1500L)<br />2.9m<br />Pasteurization Tanks<br />(4400L x2)<br />12m<br />Chopper and Mixing Unit<br />Dewatering Unit<br />Loading Ramp and Platform<br />SEaB Energy Ltd © Confidential<br />4<br />
    10. 10. MUCKBUSTERTM<br /> Reseller Contracts Already Signed<br />Our Opportunities:<br />WHO NEEDS ONE?<br />Market size UK 2M units<br />SEaB Energy Ltd © Confidential<br />5<br />
    11. 11. WINDBUSTER™Vertical Axis Wind Turbine<br />SEaB Energy Ltd © Confidential<br />6<br />
    12. 12. WINDBUSTERTM<br />Anemometer<br />GRP Blade<br />6m Length -Eliptical design wind capture from all directions<br />Electronic Braking System <br />shuts down turbine above 17m/s wind speed<br />Aluminium Blade Strut<br />Direct Drive <br />Generator<br />15m Tilt Up Mast<br />Hydraulic Ram<br />SEaB Energy Ltd © Confidential<br />7<br />
    13. 13. WINDBUSTERTM5KW VERTICAL AXIS WIND<br />SEaB Energy Ltd © Confidential<br />8<br />
    14. 14. WINDBUSTERTM<br />Reseller Contracts Signed<br />Our Opportunities:<br />Who wants one?<br />UK Market = 600K turbines ( by 2020)<br />USA Market = 15.1M turbines (by 2020)<br />SEaB Energy Ltd © Confidential<br />9<br />
    15. 15. Funding & Financials<br />Profitability<br /><ul><li>SEaB shows strong revenue and EBITDA growth between 2010 - 2013
    16. 16. Profitability in 2010 and 2011 is hindered by high costs of sales and operating costs
    17. 17. As the business matures, operating costs stabilise, whilst cost of sales decrease*
    18. 18. In turn, margins continue to rise from 2011 to 2013, reflecting this increase in profitability </li></ul>10<br />*unit cost of sales for the WB and MB decrease by 27% and 20% respectively, over the four year period<br />
    19. 19. Funding Requirements<br />New Funding Required <br />Raised to date & Identified<br />SEaB Energy Ltd © Confidential<br />11<br />
    20. 20. SANDRA SASSOW, CEO+44 2380 111 909sandrasassow@seabenergy.com<br />WINDBUSTERTM<br />5KW VERTICAL AXIS WIND TURBINE<br />MUCKBUSTERTM<br />SMALL ANAEROBIC DIGESTER<br />SEaB Energy Ltd © Confidential<br />12<br />

    ×