Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

3D Analyst - Watershed

5,548 views

Published on

Delineate a Watershed Area and Find the Streams of the Rivers Using Spatial and 3D Analyst
by Candra Dewi

Published in: Technology, Business
  • Login to see the comments

  • Be the first to like this

3D Analyst - Watershed

  1. 1. Delineate a Watershed Area and Find the Streams of the Rivers Using Spatial and 3D Analyst Candra Dewi G051060021
  2. 2. Study Area And Data <ul><li>Study Area </li></ul><ul><ul><li>Location : Malang, East Java, Indonesia </li></ul></ul><ul><ul><li>Coordinate : UTM Projection , WGS84 Datum </li></ul></ul><ul><li>Data </li></ul><ul><ul><li>SRTM data : S08E111.hgt </li></ul></ul><ul><ul><li>DEM data : exported from SRTM Data using Global Mapper software, 90m x 90m resolution with interpolate to fill small gaps in data </li></ul></ul>
  3. 3. Study Area And Data S08E111.hgt
  4. 4. General steps to determine watershed : <ul><li>Filling the sinks of the DEM </li></ul><ul><li>increasing the elevation of the points that are fictitious pits </li></ul><ul><li>Determining the flow direction </li></ul><ul><li>identifying the cell towards which water will flow </li></ul><ul><li>Calculating the flow accumulation </li></ul><ul><li>evaluating the drainage area in units of grid cells </li></ul><ul><li>Identifying the stream cells </li></ul><ul><li>flagging those cells with a flow accumulation value greater than a certain user-defined threshold value </li></ul><ul><li>Labeling the sinks </li></ul><ul><li>assigning a label (number) to each reach of the stream network </li></ul><ul><li>Delineating the watershed for each link </li></ul><ul><li>determining the incremental drainage area associated with each link </li></ul>
  5. 5. DEM Data
  6. 6. Sink Filling
  7. 7. Flow Direction <ul><li>( [Filled DEM].FlowDirection(FALSE)) </li></ul>
  8. 8. Flow Accumulation <ul><li>([Flow Dir].FlowAccumulation(NIL)) </li></ul>
  9. 9. Identifying Stream <ul><li>([Flow Acc] < 750.AsGrid).SetNull(1.AsGrid) </li></ul>
  10. 10. Labeling the Link <ul><li>([Stream750].StreamLink([Flow Dir])) </li></ul>
  11. 11. Determining Watersheds <ul><li>([Flow Dir].Watershed([Stream Link])) </li></ul>
  12. 12. 3D Scene

×