  1. 1. PHASE 5 PRESENTATION
  2. 2. General Ground Floor Plan
  3. 3. General First Floor Plan
  4. 4. First Floor Plan R o b e r t S t r e e t Monthermer Road
  5. 5. Ground Floor Plan
  6. 6. WHAT PHASE 5 PROVIDES: <ul><li>A new balcony extending out to the next roof truss </li></ul><ul><li>The hall stays the same size </li></ul><ul><li>Access from the foyer (Phase 3) </li></ul><ul><li>Fire exit(s) compliant with current standards </li></ul>
  7. 7. ON THE FIRST FLOOR: <ul><li>A meeting room about 28 feet square </li></ul><ul><li>A kitchen 13.5 feet x 9 feet for light refreshments </li></ul><ul><li>A small store </li></ul><ul><li>Access is available from the foyer </li></ul><ul><li>The meeting room is separated from the hall by a glazed screen </li></ul>
  8. 8. ON THE GROUND FLOOR: <ul><li>Access to hall from foyer </li></ul><ul><li>An office about 15 feet x 9 feet </li></ul><ul><li>A store about 15 feet x 10.5 feet (chairs etc.) </li></ul><ul><li>Access is available from the foyer </li></ul><ul><li>Stairs to first floor </li></ul>
  9. 9. BENEFITS: <ul><li>Appropriate (ramped) access to hall from foyer </li></ul><ul><li>Appropriate office and storage space </li></ul><ul><li>Acceptable fire related provisions </li></ul><ul><li>Ideal meeting room space offering wide usage... </li></ul>
  10. 10. USES OF FIRST FLOOR ROOM: (Suggestions) <ul><li>After service coffee area </li></ul><ul><li>Room for teaching workshops with refreshments </li></ul><ul><li>Café cum Drop-in Centre for community </li></ul><ul><li>Refreshments area for parents of children </li></ul><ul><li>Small conference facility for hire (capacity  90) </li></ul>
  11. 11. PROPOSED TIMING OF PHASE 5: <ul><li>Follow on from Phase 3 </li></ul><ul><li>Commencement - July 2002 (expected!) </li></ul><ul><li>Duration - around 3 months </li></ul><ul><li>Estimated Cost - £82,000 + VAT </li></ul>
  12. 12. BENEFITS OF TIMING OF PH. 5: (i.e. this summer/autumn) <ul><li>Do most work whilst hall can be taken out of use </li></ul><ul><li>Provide access to Pierce Hall from foyer a.s.a.p. </li></ul><ul><li>Provide office space for new intended staff </li></ul><ul><li>Provide conveniently located after service refreshments </li></ul><ul><li>Achieve potential cost savings using Mitre Constn. </li></ul><ul><li>Maintain momentum of building project to completion </li></ul>

×