  1. 1. CHAPTER-4 1. Who shall exercise control of the vessel and pressure relief device inspection program, inspection frequencies,andmaintenance? 2. Who is responsible for the functionofanauthorizedinspectionagencyinaccordancewiththeprovisions of thiscode?? 3. Who shall also control activities relating to the rating, repair, alteration, and engineering assessmentsofits pressurevesselsandreliefdevices? 4. Who is responsible for developing, documenting, implementing, executing, and assessing pressure vessel/pressure-relievingdeviceinspectionsystems? 5. Who is responsible for implementing and executing an effective MOC process that reviews and controls changestotheprocessandtothehardware? 6.AneffectiveMOCreviewprocessisvitaltothesuccessofanypressurevesselintegritymanagementprogram asitallowstheinspectiongroup 1) to be able to address issues concerning the adequacy of the pressure equipment design and current condition fortheproposedchanges, 2) to anticipatechangesincorrosionorothertypesofdamage,and 3) to updatetheinspectionplanandrecordstoaccountforthosechanges. 7. Who should implement and maintain an effective program for creating, establishing, and monitoring integrity operatingwindows? 8.Futureinspectionplansandintervalshavehistoricallybeenbasedonpriormeasuredcorrosionratesresulting frompastoperatingconditions.
  2. 2. 9. Deviations from and changes of trends within established IOW limits should be broughtto theattentionof inspection/engineering personnel so they may modify or create new inspection plans depending upon the seriousnessoftheexceedance. 10. Particular attention to monitoring IOWs should also be provided during start-ups, shutdowns, and significantprocessupsets. 11. Who is responsible to the owner/user for activities involving design, engineering review, analysis, or evaluationofpressurevesselsandpressure-relievingdevicesasspecifiedinthisinspectioncode? 12.Allrepairsandalterationsshallbeperformedbyaqualifiedrepairorganization. 13.Who is responsible to the owner/user and shall provide the materials, equipment, QC, and workmanship that is necessary to maintain and repair the vessel or pressure-relieving device in accordance with the requirementsofthisinspectioncode? 14. Who responsible to the owner/user to assure that the inspection, NDE, repairs, and pressure testing activitiesmeetAPI510 coderequirements? 15. The inspector shall be directly involved in the inspection activities, especially visual inspections,whichin most cases will require field activities to ensure that proceduresandinspectionplansarefollowedbutmaybe assisted in performing inspections by other properly trained and qualified individuals who arenotinspectors (e.g.examinersandoperatingormaintenancepersonnel).
  3. 3. 16. However, all NDE resultsshallbeevaluatedandacceptedbytheinspectorwhowillthenmakeappropriate recommendationsforrepairs,replacements,orfitnessforcontinuedservice. 17.Theinspectorcanbeanemployeeoftheowner/userorbeacontractoracceptabletotheowner/user. 18. Who shall perform the NDE in accordance with job requirements, NDE procedures, and owner/user specification? 19. The examiner does not need API 510 inspector certification and does not need to be an employee of the owner/user. The examiner does need to be trained and competent intheNDE proceduresbeingusedandmay berequiredbytheowner/usertoprovecompetencybyholdingcertificationsinthoseprocedures.Examplesof certificationsthatmayberequired includeASNTSNT-TC-1A,ASNTCP-189,CGSB,andAWSQC1.Inspectors conducting their own examinations with NDE techniques shall also be appropriately qualified in accordance withowner/userrequirements. 20. The examiner’s employer shall maintain certification records of the examiners employed, including dates andresultsofpersonnelqualifications 21. Operating, maintenance, engineering (process and mechanical), or other personnel who have special knowledge or expertise related to particular pressurevesselsshallberesponsiblefortimelynotificationtothe inspectororengineerofpotentialissuesthatmayaffectvesselintegrity. 22. Each owner/user organization should be audited periodically to determine if the authorized inspection agencyismeetingtherequirementsofthisinspectioncode.

×