FACULTY OF ENGINEERING
  DEPARTMENT OF CIVIL AND STRUCTURAL
          ENGINEERING


                 KKKA 6424
INTELLIGENT URBAN TRAFFIC CONTROL SYSTEM
   Prof. Dr. Riza Atiq Abdullah O.K. Rahmat



       ASSIGNMENT (1)

                PREPARED BY:

   1- HAIDER FARHAN                  P65405
   2- MUSTAFA TALIB                  P60915
   3-- SAHAR ABD ALI                 P65295


                                              1
Introduction

Traffic lights
Traffic lights, also known as traffic signals, traffic lamps, signal
lights, robots and semaphores. Aresignaling devices positioned at or near road
intersections, pedestrian crossings and other locations to control competing flows of
traffic. Traffic lights were first installed in 1868 in London, United, now used in almost
every city of the world. Traffic lights alternate the right of way accorded to road users by
displaying lights of a standard color (red, yellow/amber, and green) following a
universal color code (and a precise sequence to enable comprehension by those who
are color blind).
In the typical sequence of color phases:

   Illumination of the green light allows traffic to proceed in the direction denoted, if it
    is safe to do so
   Illumination of the yellow/amber light denoting prepare to stop short of the
    intersection, if it is safe to do so
   Illumination of the red signal prohibits any traffic from proceeding
Usually, the red light contains some orange in its hue, and the green light contains some
blue, said to be for the benefit of people with red-green color blindness




    Traffic signal is one of the more familiar types of intersection control. Using either a
fixed or adaptive schedule, traffic signals allow certain parts of the intersection to move
while forcing other parts to wait, delivering instructions to drivers through a set of
colorful lights (generally, of the standard red-yellow (amber)-green format). Some
purposes of traffic signals are to (1) improve overall safety, (2) decrease average travel
time through an intersection, and (3) equalize the quality of services for all or most traffic
streams. Traffic signals provide orderly movement of intersection traffic, have the ability
to be flexible for changes in traffic flow, and can assign priority treatment to certain
movements or vehicles, such as emergency services. However, they may increase delay

                                                                                            2
during the off-peak period and increase the probability of certain accidents, such as rear-
end collisions. Additionally, when improperly configured, driver irritation can become
an issue. Traffic signals are generally a well-accepted form of traffic control for busy
intersections and continue to be deployed. Other intersection control strategies include
signs (stop and yield) and roundabouts. Intersections with high volumes may be grade
separated.




Single aspects
The simplest traffic light comprises either a single or a pair of colored aspects that warns
any user of the shared right of way of a possible conflict or danger.
Flashing Red: Treat as a stop sign. Also can signal the road is closed.
Flashing Yellow: Caution, crossing or road hazard ahead
Flashing Green: Varies among jurisdiction; can give permission to go straight as well as
make a left turn in front of opposing traffic (which is held by a steady red light), or can
indicate the end of a green cycle before the light changes to a solid yellow.




                                                                                          3
Case study

Our team which consists of three engineers selected a series of intersection of three,
these three intersections are located on the road which link between Bangi (UKM),
Kajang, Sepakat, and the highway lead to KL as shown in the figure below.




Each one of these intersections are consist of three legs (three phases) and all phases
have two lanes in each intersection.
   As a work team after selecting these intersections we conducted the traffic count
survey for one hour for each intersection, and we found that the cycle time of traffic
light for each intersection is (120seconds),(160 sec ),and (180 sec ) ,respectively,and
the all red for each approach ( 2 seconds ), and amber for each approach ( 3 seconds
).




                                                                                     4
5
Intersection-1-

This is the first intersection linking Kajang, Babgi, and (UKM) as shown in the
figure below.




                                                                                  6
DATA OF INTERSECTION: 1


Passenger Car Unit Data traffic for one hour

 Traffic Flows in       KAJANG                 UKM         BANGI
 15 Min
                        Phase -1-              Phase -2-   Phase -3-

 Cars/Van               755                    846         361

 Lori < 5 ton           42                     118         37

 Lori > 5 ton           13                     4           5

 Motorcycle             322                    215         137

 Bus                    10                     14          5

 Mini Bus               12                     17          10



so we need the table below



 Bil    Vehicle                     Passenger Car Unit

 1      Car / van / jeep / mpv      1

 2      Lorry < 5 ton               1.75

 3      Lorry > 5 ton               2.25

 4      Trailer                     3

 5      Mini Bus                    2.5

 6      Bus                         2.75

 7      Motorcycle                  0.35




                                                                       7
Phase                                   Traffic Flows in 1 hour                                Total

              Car      Lorry<5ton       Lorry>5ton     Trailer   Mini     Bus      M/cycle    (pcu/hr)
                                                                 Bus

  1           755         42               13              0      12        10       322       1027

  2           846         118               4              0      17        14       215       1216

  3           361         37                5              0      10        5        137        524

PCU            1          1.75             2.25            3      2.5     2.75       0.35
UNIT



Phase       Number of        Saturation           Saturation      Actual           Flow /     Green
              Lanes           Flow per               Flow         Flows          Saturation   Time
                                Lane               (pcu/hr)      (pcu/hr)           Flow      Split
                              (pcu/hr)                                             Ration

  1                2             1800               3600           1027             0.33      0.44

  2                2             1800               3600           1216             0.28      0.37

  3                2             1800               3600            524             0.14      0.18

                                                                 Total =          0.75=Y



      L= 3 *(2+3) = 15 sec

      Cycle time (C0 ) = 1.5 L + 5 / 1- Y = 1.5*(15)+5 / 1-0.75=110 sec

      Effective green time = 110 – 15 = 95 sec

      Phase -1- green time =95* 0.44 =41.8 =42 sec

      Phase-2- green time =95*0.37 = 35.15 =36 sec

      Phase-3-green time =95*0.18 = 17.1 = 18 sec

      Total of green time = 42+36+18 = 96 sec

      Total of amber & all red time =3 * (2+3) = 15 sec



        Cycle time = 96 + 15 = 111 sec




                                                                                                8
Intersection-2-

The second intersection links Kajang, UKM, and Sepakat as shown in the figure
below.




                                                                                9
DATA OF INTERSECTION: 2




 Traffic Flows in                  KAJANG              Ukm       SEPAKAT
     15 Min
                                Phase-1-              Phase-2-   Phase-3-

       Cars/Van                   808                   918        338

     Lori < 5 ton                  46                   135        46

     Lori > 5 ton                  17                    5         11

       Motorcycle                 351                   238        117

          Bus                      11                    14         1

       Mini Bus                    14                    20         4




 Bil              Vehicle               Passenger Car Unit

 1        Car / van / jeep / mpv                1

 2              Lorry < 5 ton                  1.75

 3              Lorry > 5 ton                  2.25

 4                Trailer                       3

 5               Mini Bus                      2.5

 6                  Bus                        2.75

 7              Motorcycle                     0.35




                                                                            11
Phase                                 Traffic Flows in 1 hour                                 Total

            Car      Lorry<5ton       Lorry>5ton   Trailer   Mini       Bus      M/cycle     (pcu/hr)
                                                             Bus

  1         808         46               17            0        14      11         351         1115

  2         918         135               5            0        20      14         238         1336

  3         338         46               11            0        4        1         117         498

 PCU         1          1.75             2.25          3        2.5     2.75       0.35
UNIT




Phase     Number of       Saturation          Saturation      Actual            Flow /       Green
            Lanes          Flow per              Flow         Flows           Saturation   Time Split
                             Lane              (pcu/hr)      (pcu/hr)            Flow
                           (pcu/hr)                                             Ration

  1              2             1800             3600            1115             0.31         0.37

  2              2             1800             3600            1336             0.37         0.45

  3              2             1800             3600             498             0.14         0.17

                                                             Total =           0.82=Y



      L = 3 * (2+3) = 15 sec

      Cycle time (C0)=1.5L+5 /1-Y=1.5*15+5/1-0.82=155 sec

      Effective green time = 155- 15 = 140 sec

      Phase-1- green time =140* 0.37 =51.8 =52 sec

      Phase-2- green time=140 *0.45 = 63sec

      Phase-3-green time=140 *0.17=23.8 = 24 sec

      Total of green time = 52+63+24 = 139 sec

      Total of amber & all red = 3*(2+3) =15 sec

      Cycle time = 139 +15 = 154 sec



                                                                                               11
Intersection-3-

 This is the third intersection which links Kajang, UKM, and the highway as
shown in the figure below.




                                                                              12
DATA OF INTERSECTION: 3



 Traffic Flows in               KAJANG               Ukm     HIGHWAY
     15 Min
                                Phase-1-        Phase-2-      Phase-3-

       Cars/Van                   768                 956       585

     Lori < 5 ton                  42                 137        24

     Lori > 5 ton                  11                  5         9

       Motorcycle                 333                 258        34

          Bus                      11                 14         3

       Mini Bus                    14                 22         0




 Bil              Vehicle               Passenger Car Unit

 1        Car / van / jeep / mpv                1

 2              Lorry < 5 ton                  1.75

 3              Lorry > 5 ton                  2.25

 4                Trailer                       3

 5               Mini Bus                      2.5

 6                  Bus                        2.75

 7              Motorcycle                     0.35




                                                                         13
Phase                               Traffic Flows in 1 hour                                Total

         Car       Lorry<5ton       Lorry>5ton   Trailer   Mini      Bus       M/cycle    (pcu/hr)
                                                           Bus

  1      768          42               11            0        16      12         333       1056

  2      940          134               4            0        22      14         205       1348

  3      585          24                9            0        0        3          34        667

PCU        1          1.75             2.25          3     2.5        2.75       0.35
UNIT



Phase   Number of      Saturation           Saturation      Actual             Flow /     Green
          Lanes         Flow per               Flow         Flows            Saturation   Time
                          Lane               (pcu/hr)      (pcu/hr)             Flow      Split
                        (pcu/hr)                                               Ration

  1            2             1800             3600            1056              0.29      0.34

  2            2             1800             3600            1348              0.37      0.44

  3            2             1800             3600             667              0.18      0.21

                                                           Total =            0.84= Y



  L = 3 * (2+3) = 15 sec

  Cycle time (C0) = 1.5L+5/1-Y=1.5*15+5/1-0.84=175

  Effective green time =175 – 15 = 160 sec

  Phase-1- green time = 160 * 0.34=54.4 =55 sec

  Phase-2- green time = 160 * 0.44 =70.4 = 71 sec

  Phase-3- green time = 160 * 0.21 =33.6 = 34 sec

  Total time green = 55 + 71 + 34 = 160 sec

  Total of amber& all red =3 *(2+3) =15 sec

  Cycle time = 160 + 15 = 175 sec




                                                                                           14
Summary of results for cycle time ( C₀ ) and effective green time
( Ge)

 Intersection    Cycle time C₀ (sec)         Effective Green time Ge (sec)
       1                 111                               95
       2                 154                              140
       3                 175                              160


Calculation of cycle time:
After calculation of cycle time with Webster method, the highest cycle
time was for intersection 3 and it was equal to175 seconds. So adjust all
intersection using Cycle Time 175 second


                                                           phase    Green
Intersection 1:                                                     time
Cycle time = 175 sec                                       1        71
Total of amber and all red time = (3+2) x3=15 sec          2        60
Total green time = 175-15=160sec                                    29
                                                           3
Phase 1 green time = 160* 0.44=70.4sec =71 sec
                                                           total    160
Phase 2 green time =160 *0.37=59.2sec=60sec
Phase 3 green time = 160*0.18=28.8sec=29sec
Intersection 2:
Cycle time = 175 sec
Total of amber and all red time = (3+2) x3= 15sec          phase    Green
Total green time = 175-15 =160sec                                   time
Phase 1 green time =160*0.37=59.2sec=60sec                 1        60
Phase 2 green time =160*0.45= 72sec                        2        72
Phase 3 green time = 160*0.17=27.2sec =28sec               3        28
                                                           total    160




                                                                            15
Intersection 3:
Cycle time =175 sec
Total of amber and all red time = (3+2) x3=15 sec
Total green time = 175-15= 160 sec                         phase     Green
                                                                     time
Phase 1 green time = 55sec                                 1         55
Phase 2 green time = 71sec                                 2         71
Phase 3 green time = 34 sec                                3         34
                                                           total     160




Calculation of offset time :
Offset time : L/S - ( Qh+ loss)
Where
Q = Number of vehicles queued per lane, vehicle.
h = Discharge Headway of queued vehicle in seconds/vehicle.
Typical value of h is 2 seconds / vehicle.
S = Average Speed in metre in second
L = Distance between intersectios in metre
Loss1 = Loss Time associated with vehicles starting from rest at the
first downstream signal (2 seconds can be used as a default).




1-offset1
S= 10 m/s
L1= 1600 m
Q1= 12 veh
h=2 sec per veh
loss =2 sec
Offset1 =1600/10-(12x2+2) =134sec          RELATIVE OFFSET= 134 , ABSOLUTE OFFSET=134
                                                                            OFFSET===




                                                                            16
2-offset2

S= 10 m/s
L2= 250m
Q2= 14veh
h=2 sec per veh
loss =2 sec

Offset 2 =250/10-(14x2+2) =-5sec   RELATIVE OFFSET =-5, ABSOLUTE OFFSET =129




3-Offset3= 0




                                                                          17
14cars                    12cars


3            2                         1
                                   ntersection1




                 OFFSET=129




                                             18
phase   Green   phase   Green   phase   Green
        time            time            time
1       55      1       60      1       71
2       71      2       72      2       60
3       34      3       28      3       29
total   160     total   160     total   160
Offset3 0       Offset2 -5      Offset1 134




                                                19

More Related Content

Viewers also liked

Viewers also liked (15)

Moving dna
Moving dnaMoving dna
Moving dna
 
Faktor mempengaruhi spb
Faktor mempengaruhi spbFaktor mempengaruhi spb
Faktor mempengaruhi spb
 
Urban presentation
Urban presentationUrban presentation
Urban presentation
 
Sustainable urban trans. in hannover
Sustainable urban trans. in hannoverSustainable urban trans. in hannover
Sustainable urban trans. in hannover
 
Orquideas 2012
Orquideas 2012Orquideas 2012
Orquideas 2012
 
MARIA LUISA DIAZ
MARIA LUISA DIAZMARIA LUISA DIAZ
MARIA LUISA DIAZ
 
Joliesse franchising eylul 2012 (1)
Joliesse franchising eylul 2012 (1)Joliesse franchising eylul 2012 (1)
Joliesse franchising eylul 2012 (1)
 
No poo (Català)
No poo (Català)No poo (Català)
No poo (Català)
 
Marketing stratergy of samsung galaxy
Marketing stratergy of samsung galaxyMarketing stratergy of samsung galaxy
Marketing stratergy of samsung galaxy
 
6.1 digestion
6.1 digestion6.1 digestion
6.1 digestion
 
Dan seracu-auto-control-pentru-avansati
Dan seracu-auto-control-pentru-avansatiDan seracu-auto-control-pentru-avansati
Dan seracu-auto-control-pentru-avansati
 
Science quotes
Science quotesScience quotes
Science quotes
 
17375239 tipo-de-estrategia
17375239 tipo-de-estrategia17375239 tipo-de-estrategia
17375239 tipo-de-estrategia
 
Science jobs
Science jobsScience jobs
Science jobs
 
Diapositivas mamposteria
Diapositivas mamposteriaDiapositivas mamposteria
Diapositivas mamposteria
 

Similar to Intelligen assignment 1

Presentation 1- intelligent traffic system
Presentation 1-   intelligent  traffic systemPresentation 1-   intelligent  traffic system
Presentation 1- intelligent traffic systemsaharsnd
 
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...IAEME Publication
 
5-Modal Split & Traffic Assignment-( Transportation and Traffic Engineering D...
5-Modal Split & Traffic Assignment-( Transportation and Traffic Engineering D...5-Modal Split & Traffic Assignment-( Transportation and Traffic Engineering D...
5-Modal Split & Traffic Assignment-( Transportation and Traffic Engineering D...Hossam Shafiq I
 
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...Hossam Shafiq I
 
Major Project of Soil Civil Engineering
Major Project of Soil Civil EngineeringMajor Project of Soil Civil Engineering
Major Project of Soil Civil EngineeringKunal Bangar
 
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDORCOORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDORRakesh Venkateswaran
 
Financial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyFinancial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyshubham sharma
 
Continuous Flow Intersection
Continuous Flow IntersectionContinuous Flow Intersection
Continuous Flow Intersectionpankaj kumar
 
New highway project
New highway projectNew highway project
New highway projectjanaka ruwan
 
L11 Signal Timing Design
L11 Signal Timing Design L11 Signal Timing Design
L11 Signal Timing Design Hossam Shafiq I
 
IRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary DesignIRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary DesignIRJET Journal
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...Hossam Shafiq I
 
KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1armada7000
 
Reduction in Travel Time of Ambulances using Simulation and Scheduling
Reduction in Travel Time of Ambulances using Simulation and SchedulingReduction in Travel Time of Ambulances using Simulation and Scheduling
Reduction in Travel Time of Ambulances using Simulation and SchedulingIRJET Journal
 
Study of urban traffic flow
Study of urban traffic flowStudy of urban traffic flow
Study of urban traffic flowSukhdeep Jat
 
Demand robust counterpart open capacitated vehicle routing problem time windo...
Demand robust counterpart open capacitated vehicle routing problem time windo...Demand robust counterpart open capacitated vehicle routing problem time windo...
Demand robust counterpart open capacitated vehicle routing problem time windo...IJECEIAES
 

Similar to Intelligen assignment 1 (20)

Presentation 1- intelligent traffic system
Presentation 1-   intelligent  traffic systemPresentation 1-   intelligent  traffic system
Presentation 1- intelligent traffic system
 
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
 
5-Modal Split & Traffic Assignment-( Transportation and Traffic Engineering D...
5-Modal Split & Traffic Assignment-( Transportation and Traffic Engineering D...5-Modal Split & Traffic Assignment-( Transportation and Traffic Engineering D...
5-Modal Split & Traffic Assignment-( Transportation and Traffic Engineering D...
 
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
 
Major Project of Soil Civil Engineering
Major Project of Soil Civil EngineeringMajor Project of Soil Civil Engineering
Major Project of Soil Civil Engineering
 
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDORCOORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
COORDINATION OF ACTUATED SIGNALS FOR A CORRIDOR
 
HIGHWAY TRAFFIC
HIGHWAY TRAFFICHIGHWAY TRAFFIC
HIGHWAY TRAFFIC
 
Financial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyFinancial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case study
 
Continuous Flow Intersection
Continuous Flow IntersectionContinuous Flow Intersection
Continuous Flow Intersection
 
New highway project
New highway projectNew highway project
New highway project
 
L11 Signal Timing Design
L11 Signal Timing Design L11 Signal Timing Design
L11 Signal Timing Design
 
IRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary DesignIRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary Design
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
L16 Progression
L16 ProgressionL16 Progression
L16 Progression
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
 
KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1
 
Reduction in Travel Time of Ambulances using Simulation and Scheduling
Reduction in Travel Time of Ambulances using Simulation and SchedulingReduction in Travel Time of Ambulances using Simulation and Scheduling
Reduction in Travel Time of Ambulances using Simulation and Scheduling
 
Study of urban traffic flow
Study of urban traffic flowStudy of urban traffic flow
Study of urban traffic flow
 
Demand robust counterpart open capacitated vehicle routing problem time windo...
Demand robust counterpart open capacitated vehicle routing problem time windo...Demand robust counterpart open capacitated vehicle routing problem time windo...
Demand robust counterpart open capacitated vehicle routing problem time windo...
 

Intelligen assignment 1

  • 1. FACULTY OF ENGINEERING DEPARTMENT OF CIVIL AND STRUCTURAL ENGINEERING KKKA 6424 INTELLIGENT URBAN TRAFFIC CONTROL SYSTEM Prof. Dr. Riza Atiq Abdullah O.K. Rahmat ASSIGNMENT (1) PREPARED BY: 1- HAIDER FARHAN P65405 2- MUSTAFA TALIB P60915 3-- SAHAR ABD ALI P65295 1
  • 2. Introduction Traffic lights Traffic lights, also known as traffic signals, traffic lamps, signal lights, robots and semaphores. Aresignaling devices positioned at or near road intersections, pedestrian crossings and other locations to control competing flows of traffic. Traffic lights were first installed in 1868 in London, United, now used in almost every city of the world. Traffic lights alternate the right of way accorded to road users by displaying lights of a standard color (red, yellow/amber, and green) following a universal color code (and a precise sequence to enable comprehension by those who are color blind). In the typical sequence of color phases:  Illumination of the green light allows traffic to proceed in the direction denoted, if it is safe to do so  Illumination of the yellow/amber light denoting prepare to stop short of the intersection, if it is safe to do so  Illumination of the red signal prohibits any traffic from proceeding Usually, the red light contains some orange in its hue, and the green light contains some blue, said to be for the benefit of people with red-green color blindness Traffic signal is one of the more familiar types of intersection control. Using either a fixed or adaptive schedule, traffic signals allow certain parts of the intersection to move while forcing other parts to wait, delivering instructions to drivers through a set of colorful lights (generally, of the standard red-yellow (amber)-green format). Some purposes of traffic signals are to (1) improve overall safety, (2) decrease average travel time through an intersection, and (3) equalize the quality of services for all or most traffic streams. Traffic signals provide orderly movement of intersection traffic, have the ability to be flexible for changes in traffic flow, and can assign priority treatment to certain movements or vehicles, such as emergency services. However, they may increase delay 2
  • 3. during the off-peak period and increase the probability of certain accidents, such as rear- end collisions. Additionally, when improperly configured, driver irritation can become an issue. Traffic signals are generally a well-accepted form of traffic control for busy intersections and continue to be deployed. Other intersection control strategies include signs (stop and yield) and roundabouts. Intersections with high volumes may be grade separated. Single aspects The simplest traffic light comprises either a single or a pair of colored aspects that warns any user of the shared right of way of a possible conflict or danger. Flashing Red: Treat as a stop sign. Also can signal the road is closed. Flashing Yellow: Caution, crossing or road hazard ahead Flashing Green: Varies among jurisdiction; can give permission to go straight as well as make a left turn in front of opposing traffic (which is held by a steady red light), or can indicate the end of a green cycle before the light changes to a solid yellow. 3
  • 4. Case study Our team which consists of three engineers selected a series of intersection of three, these three intersections are located on the road which link between Bangi (UKM), Kajang, Sepakat, and the highway lead to KL as shown in the figure below. Each one of these intersections are consist of three legs (three phases) and all phases have two lanes in each intersection. As a work team after selecting these intersections we conducted the traffic count survey for one hour for each intersection, and we found that the cycle time of traffic light for each intersection is (120seconds),(160 sec ),and (180 sec ) ,respectively,and the all red for each approach ( 2 seconds ), and amber for each approach ( 3 seconds ). 4
  • 5. 5
  • 6. Intersection-1- This is the first intersection linking Kajang, Babgi, and (UKM) as shown in the figure below. 6
  • 7. DATA OF INTERSECTION: 1 Passenger Car Unit Data traffic for one hour Traffic Flows in KAJANG UKM BANGI 15 Min Phase -1- Phase -2- Phase -3- Cars/Van 755 846 361 Lori < 5 ton 42 118 37 Lori > 5 ton 13 4 5 Motorcycle 322 215 137 Bus 10 14 5 Mini Bus 12 17 10 so we need the table below Bil Vehicle Passenger Car Unit 1 Car / van / jeep / mpv 1 2 Lorry < 5 ton 1.75 3 Lorry > 5 ton 2.25 4 Trailer 3 5 Mini Bus 2.5 6 Bus 2.75 7 Motorcycle 0.35 7
  • 8. Phase Traffic Flows in 1 hour Total Car Lorry<5ton Lorry>5ton Trailer Mini Bus M/cycle (pcu/hr) Bus 1 755 42 13 0 12 10 322 1027 2 846 118 4 0 17 14 215 1216 3 361 37 5 0 10 5 137 524 PCU 1 1.75 2.25 3 2.5 2.75 0.35 UNIT Phase Number of Saturation Saturation Actual Flow / Green Lanes Flow per Flow Flows Saturation Time Lane (pcu/hr) (pcu/hr) Flow Split (pcu/hr) Ration 1 2 1800 3600 1027 0.33 0.44 2 2 1800 3600 1216 0.28 0.37 3 2 1800 3600 524 0.14 0.18 Total = 0.75=Y L= 3 *(2+3) = 15 sec Cycle time (C0 ) = 1.5 L + 5 / 1- Y = 1.5*(15)+5 / 1-0.75=110 sec Effective green time = 110 – 15 = 95 sec Phase -1- green time =95* 0.44 =41.8 =42 sec Phase-2- green time =95*0.37 = 35.15 =36 sec Phase-3-green time =95*0.18 = 17.1 = 18 sec Total of green time = 42+36+18 = 96 sec Total of amber & all red time =3 * (2+3) = 15 sec Cycle time = 96 + 15 = 111 sec 8
  • 9. Intersection-2- The second intersection links Kajang, UKM, and Sepakat as shown in the figure below. 9
  • 10. DATA OF INTERSECTION: 2 Traffic Flows in KAJANG Ukm SEPAKAT 15 Min Phase-1- Phase-2- Phase-3- Cars/Van 808 918 338 Lori < 5 ton 46 135 46 Lori > 5 ton 17 5 11 Motorcycle 351 238 117 Bus 11 14 1 Mini Bus 14 20 4 Bil Vehicle Passenger Car Unit 1 Car / van / jeep / mpv 1 2 Lorry < 5 ton 1.75 3 Lorry > 5 ton 2.25 4 Trailer 3 5 Mini Bus 2.5 6 Bus 2.75 7 Motorcycle 0.35 11
  • 11. Phase Traffic Flows in 1 hour Total Car Lorry<5ton Lorry>5ton Trailer Mini Bus M/cycle (pcu/hr) Bus 1 808 46 17 0 14 11 351 1115 2 918 135 5 0 20 14 238 1336 3 338 46 11 0 4 1 117 498 PCU 1 1.75 2.25 3 2.5 2.75 0.35 UNIT Phase Number of Saturation Saturation Actual Flow / Green Lanes Flow per Flow Flows Saturation Time Split Lane (pcu/hr) (pcu/hr) Flow (pcu/hr) Ration 1 2 1800 3600 1115 0.31 0.37 2 2 1800 3600 1336 0.37 0.45 3 2 1800 3600 498 0.14 0.17 Total = 0.82=Y L = 3 * (2+3) = 15 sec Cycle time (C0)=1.5L+5 /1-Y=1.5*15+5/1-0.82=155 sec Effective green time = 155- 15 = 140 sec Phase-1- green time =140* 0.37 =51.8 =52 sec Phase-2- green time=140 *0.45 = 63sec Phase-3-green time=140 *0.17=23.8 = 24 sec Total of green time = 52+63+24 = 139 sec Total of amber & all red = 3*(2+3) =15 sec Cycle time = 139 +15 = 154 sec 11
  • 12. Intersection-3- This is the third intersection which links Kajang, UKM, and the highway as shown in the figure below. 12
  • 13. DATA OF INTERSECTION: 3 Traffic Flows in KAJANG Ukm HIGHWAY 15 Min Phase-1- Phase-2- Phase-3- Cars/Van 768 956 585 Lori < 5 ton 42 137 24 Lori > 5 ton 11 5 9 Motorcycle 333 258 34 Bus 11 14 3 Mini Bus 14 22 0 Bil Vehicle Passenger Car Unit 1 Car / van / jeep / mpv 1 2 Lorry < 5 ton 1.75 3 Lorry > 5 ton 2.25 4 Trailer 3 5 Mini Bus 2.5 6 Bus 2.75 7 Motorcycle 0.35 13
  • 14. Phase Traffic Flows in 1 hour Total Car Lorry<5ton Lorry>5ton Trailer Mini Bus M/cycle (pcu/hr) Bus 1 768 42 11 0 16 12 333 1056 2 940 134 4 0 22 14 205 1348 3 585 24 9 0 0 3 34 667 PCU 1 1.75 2.25 3 2.5 2.75 0.35 UNIT Phase Number of Saturation Saturation Actual Flow / Green Lanes Flow per Flow Flows Saturation Time Lane (pcu/hr) (pcu/hr) Flow Split (pcu/hr) Ration 1 2 1800 3600 1056 0.29 0.34 2 2 1800 3600 1348 0.37 0.44 3 2 1800 3600 667 0.18 0.21 Total = 0.84= Y L = 3 * (2+3) = 15 sec Cycle time (C0) = 1.5L+5/1-Y=1.5*15+5/1-0.84=175 Effective green time =175 – 15 = 160 sec Phase-1- green time = 160 * 0.34=54.4 =55 sec Phase-2- green time = 160 * 0.44 =70.4 = 71 sec Phase-3- green time = 160 * 0.21 =33.6 = 34 sec Total time green = 55 + 71 + 34 = 160 sec Total of amber& all red =3 *(2+3) =15 sec Cycle time = 160 + 15 = 175 sec 14
  • 15. Summary of results for cycle time ( C₀ ) and effective green time ( Ge) Intersection Cycle time C₀ (sec) Effective Green time Ge (sec) 1 111 95 2 154 140 3 175 160 Calculation of cycle time: After calculation of cycle time with Webster method, the highest cycle time was for intersection 3 and it was equal to175 seconds. So adjust all intersection using Cycle Time 175 second phase Green Intersection 1: time Cycle time = 175 sec 1 71 Total of amber and all red time = (3+2) x3=15 sec 2 60 Total green time = 175-15=160sec 29 3 Phase 1 green time = 160* 0.44=70.4sec =71 sec total 160 Phase 2 green time =160 *0.37=59.2sec=60sec Phase 3 green time = 160*0.18=28.8sec=29sec Intersection 2: Cycle time = 175 sec Total of amber and all red time = (3+2) x3= 15sec phase Green Total green time = 175-15 =160sec time Phase 1 green time =160*0.37=59.2sec=60sec 1 60 Phase 2 green time =160*0.45= 72sec 2 72 Phase 3 green time = 160*0.17=27.2sec =28sec 3 28 total 160 15
  • 16. Intersection 3: Cycle time =175 sec Total of amber and all red time = (3+2) x3=15 sec Total green time = 175-15= 160 sec phase Green time Phase 1 green time = 55sec 1 55 Phase 2 green time = 71sec 2 71 Phase 3 green time = 34 sec 3 34 total 160 Calculation of offset time : Offset time : L/S - ( Qh+ loss) Where Q = Number of vehicles queued per lane, vehicle. h = Discharge Headway of queued vehicle in seconds/vehicle. Typical value of h is 2 seconds / vehicle. S = Average Speed in metre in second L = Distance between intersectios in metre Loss1 = Loss Time associated with vehicles starting from rest at the first downstream signal (2 seconds can be used as a default). 1-offset1 S= 10 m/s L1= 1600 m Q1= 12 veh h=2 sec per veh loss =2 sec Offset1 =1600/10-(12x2+2) =134sec RELATIVE OFFSET= 134 , ABSOLUTE OFFSET=134 OFFSET=== 16
  • 17. 2-offset2 S= 10 m/s L2= 250m Q2= 14veh h=2 sec per veh loss =2 sec Offset 2 =250/10-(14x2+2) =-5sec RELATIVE OFFSET =-5, ABSOLUTE OFFSET =129 3-Offset3= 0 17