EDEN - Acumentrics Comparison Chart

489 views

Published on

Projecto EDEN

Published in: Business, Technology
  • Be the first to comment

  • Be the first to like this

EDEN - Acumentrics Comparison Chart

  1. 1. ACUMENTRICS 5 KW System Sstem description: Gas supply 0,84 Nm3/h NG (8.5kW) Electric power DC 3.5kW AC 3kW (not grid connected!!!) Heat recovery 3kW Efficiency (on ) Electrical 34% Overall 70% Technology Stack Acumentrics (tubular, non pressurized, POX reforming without recirculation) System Acumentrics References (field trials) Dr. Dennis Witmer Director, Arctic Energy Technology Development Laboratory (AETDL) Tel: 1-907-474-7082 Email: ffdew@uaf.edu James Buckley President, Energy Alternatives Mobile: 1-907-227-7191 Email: jimbuckley@gci.net Daniel West (suggested contact) ELCO-MTS Groupy Tel: 49 (0) 7471 187 427 Email: Daniel.west@de.elco.net State of art Product development Future market UPS, power generation, residential, military (several kW) Gary Allen Luis Leyda teqma,s.l. leyda@teqma.com Apdo. 116. 08810 Sant Pere de Ribes (Barcelona) tf.- 93 896 4852 fax.- 93 896 4272 639 385601 leyda@aiqs.es TECHNICAL ADVICE Technology Advantages: - Large experince - Inherent strength and tolerance to rapid temperature change - Lowest cost per kW - System development for system up to MW - POX reforming without recirculation, no operating problems with the high CO2 in the form of carbon (Steam reforming and recirculation option for the end of this year) - Inverter and other parts of the BOP were also developed by Acumentrics Disadvantages: - Maintenance; training for client. Replacement of the stack, only technician from US Experience SOFC systems 31 units delivered to the field, 16 for 2007 Field Demonstrations operating now for over 3.000 hours (cells proven at 14.000 hours)
  2. 2. Experience with biogas Little experience in operating on biogas. Some adjustments can be made to run the system on a fuel different from natural gas. System suitable for demo yes ITEM COST / TIME INCLUDED NOT INCLUDED DELIVERY COST EVALUATION System US$210.000 Freight rate Freight charges and other shipping costs shall be paid by Buyer. Shipping of Equipment returned to Acumentrics shall be at Buyer's expense. The risk of loss or damage to Equipment in transit shall be upon Buyer. Insurances Delivery Time Q3 2007 Terms of payment Either (a) 50% pre-pay and 50% NET 30 upon delivery with Acumentrics credit approval OR (b) C.O.D. OPERATION COSTS EVALUATION Start-up US$10.500 Also commissioning Travel & living expenses Monitoring US$2.500/month minimum 6 months Operation costs Operating costs can be determined based on local fuel costs. Maintenance Estimate only: US $5000/yr. Warranty 6 months or 1.000 operating hours or 25 thermal cycles Only covers faulty parts Replacement parts and warranty labor After-sales service (logistics) System support provided by Acumentrics Corp. and represented by TEQMA, Spain.

×