1. Girish Vala
(MS in Building Const., B.Tech in Civil Engg.)
• Current Work ( BIM based Estimation and
Planning) Pg. No. 2
• Site Logistic and BIM Pg. No3-6
• Research Work. Pg. No. 7
1
2. Importing Scheduling from
Microsoft Project
Primavera
Dynamic Clash Detection and
Scheduling in Navisworks
Bi Directional Link between Revit and
Database software MS Access/Excel/SQL
Extraction of
Information from
3D Model
VISUAL ESTIMATION
Autodesk QTO / Timberline/VICO
MODEL BASED
INTEGRATION OF
INFORMATION
2
4. Construction
Sequencing
Phase 1: Site and Foundation Phase 5: Project Completion
Phase 2: 50% Structural
Phase 3: Full Structural
Phase 4: Building Envelope
4