  1. 1. Joint Meeting of the Chief Administrative Officers Homeland Security Executive Committee and the Senior Policy Review of 09 UASI New Project and Sustainment Requests February 4, 2009
  2. 2. <ul><li>Maximum Grant Application $ 63.8 M </li></ul><ul><li>State Share and M & A 12.754 M </li></ul><ul><li>NCR Sustainment and </li></ul><ul><li>New Projects 51.045 M </li></ul>NCR Sustainment and New Projects
  3. 3. <ul><li>$15,207,408: Allocation for Law Enforcement Terrorism Prevention (LETP) projects </li></ul><ul><li>Note: Total LETP projects submitted is $16 million; of that amount, $9.1 million comes from new-project requests </li></ul><ul><li>$15,951,788: Allocation for Planning/Training/Exercises (P/T/E) projects </li></ul><ul><li>Note: Total P/T/E projects submitted is $12.2 million, of that amount, 0% comes from new-project requests </li></ul><ul><li>FY09 Project Requests </li></ul><ul><li>The total project request is $67.47 million. In addition to the $35.87 million requested </li></ul><ul><li>for new projects, the SAA has received sustainment-project requests for $31.6 </li></ul><ul><li>million. </li></ul>
  4. 4. New Project Request Breakdown New-project Request Breakdown Category/Area Cost Critical Infrastructure Protection (CIP) $10.86M Info Sharing $15.69M Evacuation/Shelter $7.82M Mass Casualty/Med Surge $1.5M TOTAL $35.87M
  5. 5. <ul><ul><li>Hospital Water and Power Backup: $2.4M </li></ul></ul><ul><ul><li>Metro Tunnel Radio Expansion: $500K </li></ul></ul><ul><ul><li>Hospital Protection (WHC): $250K </li></ul></ul><ul><ul><li>Metro Chemical Detection: $1.3M </li></ul></ul><ul><ul><li>Critical Facility Backup Power: $2.5M </li></ul></ul><ul><ul><li>Reservoir Security: $500K </li></ul></ul><ul><ul><li>Bridge and Tunnel Security: $2.0M </li></ul></ul><ul><ul><li>Electrical Power Facility Protection: $250K </li></ul></ul><ul><ul><li>Video Integration Planning and Design: $1.16M </li></ul></ul>Critical Infrastructure Protection (CIP) CIP submitted 9 projects for a total of $10.86M. The list below is presented in prioritized order.
  6. 6. <ul><li>High Priority </li></ul><ul><ul><li>Integration of Interoperable Systems: $658K </li></ul></ul><ul><ul><li>Enterprise Architecture and Governance: $3M </li></ul></ul><ul><ul><li>LInx Capability Upgrades: $1.54M </li></ul></ul><ul><ul><li>LInX Expansion - Hampton and Baltimore partners: $600K </li></ul></ul><ul><ul><li>Visual Integration System to Interface Operational Networks (VISION): $1.6M </li></ul></ul><ul><ul><li>Evacuation Traffic Monitoring: $3.5M (Scalable by selecting fewer routes) </li></ul></ul><ul><ul><li>RITIS Expansion: $1.31M (Scalable by selecting fewer data sources) </li></ul></ul><ul><li>Medium Priority </li></ul><ul><ul><li>Community Preparedness Messaging: $1.5M </li></ul></ul><ul><ul><li>Text Alert System Advertising: $1.5M (Scalable) </li></ul></ul><ul><li>Low Priority </li></ul><ul><ul><li>AFIS – Iris Scanning: $280K </li></ul></ul><ul><ul><li>Electronic BOLO: $200K </li></ul></ul>Information Sharing Info Sharing presented 11 projects for a total of $15.69M. The list below represents their prioritization groups.
  7. 7. <ul><ul><li>Shelter supplies for special needs (including children and pets): $2.44M </li></ul></ul><ul><ul><li>Shelter supply kits: $5.2M </li></ul></ul><ul><ul><li>Traffic Evacuation Support Trailer: $180K </li></ul></ul><ul><li>Note: Projects have been ranked by Tony Griffin and Ken Wall, but still requires feedback from Dan Tangherlini </li></ul>Evacuation/Shelter Evacuation/Sheltering presented 3 projects for a total of $7.82M. Final prioritization has not occurred.
  8. 8. <ul><li>Hospital and EMS Situational Awareness: $1.5M </li></ul><ul><li>Build on initial project to provide integrated tool with: </li></ul><ul><ul><li>Individual hospital status </li></ul></ul><ul><ul><li>Emergency Medical Services (EMS) status </li></ul></ul><ul><ul><li>Patient tracking. </li></ul></ul><ul><li>Concept paper requested . </li></ul>Mass Casualty/Med Surge
  9. 9. Back-up Slide: Sustainment Request Breakdown Sustainment Request Breakdown Category/Area Cost (estimates) Critical Infrastructure Protection (CIP) $430K Information Sharing $18.7M Evacuation and Sheltering $146K Mass Casualty/Med Surge $63K Other $12.3M TOTAL $31.6M

×