Adtec Mekanikal Nov 08

  1. 1. LAPORAN KHAS MEKANIKAL PROJEK ADTEC TAIPING PEMILIK KEMENTERIAN SUMBER MANUSIA PENGURUS PROJEK JABATAN KERJA RAYA MALAYSIA KONTRAKTOR REKA DAN BINA KAMALBINA SDN BHD LAPORAN DISUSUN OLEH: MEGA JATI CONSULT SDN BHD. www.arkamonline.com
  2. 2. ADTEC TAIPING LOKASI PROJEK
  3. 3. BANGUNAN PENTADBIRAN BENGKEL TEK. MAKLUMAT & JAMIN KUALITI DEWAN BESAR PUSAT SUMBER DEWAN KULIAH LOBI UTAMA KAFETERIA MIKRO ELEKTRONIK KOMPOSIT PLASTIK M&E PLANT ROOM 1 TNB SUB STATION SERAMIK M&E PLANT ROOM 2 GARAJ KENDERAAN ASRAMA LELAKI ASRAMA PEREMPUAN DEWAN MAKAN SURAU KELAS F KELAS G KUARTERS B, C, C&D PELAN TAPAK ADTEC TAIPING
  4. 4. KEMAJUAN KERJA FIZIKAL (KESELURUHAN) JADUAL : 36.84% SEBENAR : 45.77% KESELURUHAN : 8.93% ( 65 HARI ) Jumlah Hari (Kontrak) : 729 hari Jumlah Hari Terpakai : 493 hari Baki Hari Tinggal : 236 hari SEHINGGA : 10 Sept 2008
  5. 5. KEMAJUAN KERJA FIZIKAL-MEKANIKAL DEWAN BESAR <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Automatic Sprinkler </li></ul><ul><li>Hose Reel </li></ul><ul><li>Fire Alarm </li></ul><ul><li>Cold water and sanitary system </li></ul>
  6. 6. DEWAN BESAR
  7. 7. DEWAN BESAR
  8. 8. KEMAJUAN KERJA FIZIKAL LOBI UTAMA SERVIS YANG TERLIBAT: Tiada servis Mekanikal
  9. 9. LOBI UTAMA
  10. 10. LOBI UTAMA
  11. 11. KEMAJUAN KERJA FIZIKAL DEWAN KULIAH UTAMA <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Automatic Sprinkler </li></ul><ul><li>Hose Reel </li></ul><ul><li>Fire Alarm </li></ul><ul><li>Cold water and sanitary system </li></ul>
  12. 12. DEWAN KULIAH UTAMA
  13. 13. KEMAJUAN KERJA FIZIKAL PUSAT SUMBER / PERPUSTAKAAN <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Automatic Sprinkler </li></ul><ul><li>Hose Reel </li></ul><ul><li>Fire Alarm </li></ul><ul><li>Cold water and sanitary system </li></ul>
  14. 14. PUSAT SUMBER / PERPUSTAKAAN
  15. 15. PUSAT SUMBER / PERPUSTAKAAN
  16. 16. PUSAT SUMBER / PERPUSTAKAAN
  17. 17. KEMAJUAN KERJA FIZIKAL PENTADBIRAN & PENGURUSAN SUMBER <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Automatic Sprinkler </li></ul><ul><li>Hose Reel </li></ul><ul><li>Fire Alarm </li></ul><ul><li>Cold water and sanitary system </li></ul>
  18. 18. BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER
  19. 19. BANGUNAN PENTADBIRAN & PENGURUSAN SUMBER
  20. 20. KEMAJUAN KERJA FIZIKAL KAFETERIA <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Split unit) </li></ul><ul><li>Hose Reel </li></ul><ul><li>Fire Alarm </li></ul><ul><li>Cold water and sanitary system </li></ul><ul><li>Kitchen Equipments & LPG </li></ul>
  21. 21. KAFETERIA
  22. 22. KEMAJUAN KERJA FIZIKAL BENGKEL TEKNOLOGI MAKLUMAT (PENGATURCARAAN & MEKATRONIK) <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Compressed Air </li></ul><ul><li>Hose Reel & Fire alarm </li></ul><ul><li>Ventilation fan </li></ul><ul><li>Cold water and sanitary system </li></ul>
  23. 23. BENGKEL TEKNOLOGI MAKLUMAT
  24. 24. KEMAJUAN KERJA FIZIKAL BENGKEL KEJURUTERAAN BAHAN TERMAJU (PLASTIK) <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Compressed Air System </li></ul><ul><li>Hose Reel & Fire Alarm </li></ul><ul><li>Ventilation Fans </li></ul><ul><li>Cold water and sanitary system </li></ul><ul><li>Process Cooling </li></ul>
  25. 25. BENGKEL KEJ. BAHAN TERMAJU (PLASTIK)
  26. 26. KEMAJUAN KERJA FIZIKAL BENGKEL KEJURUTERAAN BAHAN TERMAJU (KOMPOSIT) <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Compressed Air System </li></ul><ul><li>Hose Reel & Fire Alarm </li></ul><ul><li>Ventilation Fans </li></ul><ul><li>Cold water and sanitary system </li></ul><ul><li>Process Cooling </li></ul>
  27. 27. BENGKEL KEJ. BAHAN TERMAJU (KOMPOSIT)
  28. 28. KEMAJUAN KERJA FIZIKAL BENGKEL KEJURUTERAAN BAHAN TERMAJU (SERAMIK) <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Compressed Air System </li></ul><ul><li>Hose Reel & Fire Alarm </li></ul><ul><li>Ventilation Fans </li></ul><ul><li>Cold water and sanitary system </li></ul><ul><li>Process Cooling </li></ul>
  29. 29. BENGKEL KEJ. BAHAN TERMAJU (SERAMIK)
  30. 30. KEMAJUAN KERJA FIZIKAL BENGKEL KEJURUTERAAN JAMINAN KUALITI <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Compressed Air System </li></ul><ul><li>Hose Reel & Fire Alarm </li></ul><ul><li>Ventilation Fans </li></ul><ul><li>Cold water and sanitary system </li></ul><ul><li>Process Cooling </li></ul>
  31. 31. BENGKEL KEJ. JAMINAN KUALITI
  32. 32. KEMAJUAN KERJA FIZIKAL BENGKEL MIKRO ELEKTRONIK <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Pakej dan Split unit) </li></ul><ul><li>Compressed Air System </li></ul><ul><li>Hose Reel & Fire Alarm </li></ul><ul><li>Ventilation Fans </li></ul><ul><li>Cold water and sanitary system </li></ul><ul><li>Process Cooling </li></ul>
  33. 33. BENGKEL MIKRO ELEKTRONIK
  34. 34. KEMAJUAN KERJA FIZIKAL KUARTERS KELAS B, C, D, F, G DAN RUMAH WARDEN <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Split unit) </li></ul><ul><li>Cold water and sanitary system </li></ul>
  35. 35. KUARTERS KELAS ‘B’
  36. 36. KUARTERS KELAS ‘C’
  37. 37. KUARTERS KELAS ‘C’ + ‘D’
  38. 38. KUARTERS KELAS ‘G’ ( 5 TINGKAT )
  39. 39. KUARTERS KELAS ‘G’ (5 TINGKAT)
  40. 40. KUARTERS KELAS ‘G’ (4 TINGKAT)
  41. 41. KEMAJUAN KERJA FIZIKAL DEWAN MAKAN <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Penyaman udara (Split unit) </li></ul><ul><li>Hose Reel & Fire Alarm </li></ul><ul><li>Ventilation Fans </li></ul><ul><li>Cold water and sanitary system </li></ul><ul><li>Kitchen Equipment </li></ul>
  42. 42. DEWAN MAKAN
  43. 43. KEMAJUAN KERJA FIZIKAL ASRAMA <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Hose Reel & Fire Alarm </li></ul><ul><li>Ventilation Fans </li></ul><ul><li>Cold water and sanitary system </li></ul>
  44. 44. ASRAMA LELAKI A & B
  45. 45. ASRAMA LELAKI
  46. 46. ASRAMA PEREMPUAN C & D
  47. 47. KEMAJUAN KERJA FIZIKAL SURAU <ul><li>SERVIS YANG TERLIBAT: </li></ul><ul><li>Cold water and sanitary system </li></ul>
  48. 48. SURAU
  49. 49. M&E PLANT ROOM - CHILLER
  50. 50. ELEVATED WATER TANK, PUMP HOUSE & SECTION TANK
  51. 51. MECHANICAL SYSTEM 10.47% 10.47% 0.00% Compressed Air 0.00% 0.00% 0.00% Process Cooling System -23.00% 3.32% 26.32% Plumbing & Sanitary 3.57% 14.79% 11.22% Fire Proc. Services 38.71% 41.33% 2.62% Air Conditioning System AHEAD / DELAY ACTUAL PLANNED DES
  52. 52. CHILLER PIPE – PUSAT SUMBER
  53. 53. M&E PLANT ROOM - CHILLER
  54. 54. M&E PLANT ROOM – CHILLER PUMP
  55. 55. BENGKEL TEK. MAKLUMAT – AIRCOND DUCT & GRILL
  56. 56. BENGKEL SERAMIK – INSTALLATION OF DUCTING
  57. 57. BENGKEL SERAMIK – CHILLER PIPE
  58. 64. <ul><li>SEKIAN TERIMA KASIH </li></ul><ul><li>Sila layari </li></ul><ul><li>www.arkamonline.com </li></ul><ul><li>untuk laporan dan gambar yang terkini </li></ul><ul><li>ADTEC TAIPING. </li></ul>

×