  1. 1. Penrose Library in developmentUniversity of Denver, September 2012
  2. 2. Debris thrown out of originalPenrose window by constructionworker
  3. 3. The Academic Commons at Penrose Library isexpected to be completed by the end of January.
  4. 4. Current students must use the Penroselibrary facility inside the DriscollBridge. Information regarding theordering of books will be found athttp://library.du.edu/site/
  5. 5. Penrose Library at Driscoll

×