Quinnipiac University - Gary Steficek

The new complex at Quinnipiac University York Hill Campus includes a 141,000 sf twin sports arena, a 1,800 bed crescent-shaped dormitory, 5 story free-standing parking garage for approximately 2,000 cars, 26 smaller stand-alone dormitories totaling 636 beds and an 85,000 sf Student Center with the campus’ central mechanical plant in the basement, campus dining areas and student activity spaces.

Related Books

Free with a 30 day trial from Scribd

See all
  • Be the first to comment

Quinnipiac University - Gary Steficek

  1. 1. Quinnipiac University Hamden, Connecticut Gary Steficek, Partner in Charge
  2. 2. Overview – TD Bank Sports Center at Quinnipiac University
  3. 3. Sports Center Plan
  4. 4. Sports Center Section
  5. 5. Sports Center Interior
  6. 6. Curved Roof Trusses
  7. 7. Curved Roof Trusses
  8. 8. Roof Truss Connection Detail
  9. 9. Roof Truss Connection Detail
  10. 10. Sports Center Exterior
  11. 11. Crescent Hall & Townhouse Residences at Quinnipiac University
  12. 12. Crescent Hall & Student Center Under Construction
  13. 13. Crescent Hall Under Construction
  14. 14. Crescent Hall Under Construction
  15. 15. Crescent Hall Complete
  16. 16. Crescent Hall Complete
  17. 17. Townhouse Residences Complete
  18. 18. Rocky Top Student Center
  19. 19. Rocky Top Student Center
  20. 20. Student Center Interior
  21. 21. Student Center Interior
  22. 22. Grand Staircase Under Construction
  23. 23. Grand Staircase Under Construction
  24. 24. Student Center Roof
  25. 25. Student Center Roof (interior)
  26. 26. Quinnipiac University York Hill Campus Project Team Owner: Quinnipiac University Architect: Centerbrook Architects and Planners Structural Engineer: Gilsanz Murray Steficek MEP Engineer: R. G. Vanderwil Engineers

×