Pre trip briefing

2,096 views

Published on

Published in: Education, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
2,096
On SlideShare
0
From Embeds
0
Number of Embeds
473
Actions
Shares
0
Downloads
14
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • Kit food time
  • Pre trip briefing

    1. 1. Hengistbury Head Preparation • Meet at 7am by the minibuses • Lunch and money • Camera (phone)
    2. 2. Equipment
    3. 3. “How do geomorphic processes affect Hengistbury Head?” key questions 1 2 3 4 5
    4. 4. Eyes were invented before instruments
    5. 5. HomeworkFind out how to use your phone!
    6. 6. iGeology
    7. 7. Audioboo / Voice Memos
    8. 8. OneNote / Notepad
    9. 9. Evernote
    10. 10. Photo and video apps. Photosynth
    11. 11. Links to key Data Method Limitations Solutions question What did you Problems? What did you How reliable I do? do to get good your data? data? Sampling?Land use mapBeach Profile
    12. 12. Hengistbury Head map 3: Coastal management techniques
    13. 13. MethodologyIdentify 3 sampling sites across the width of the beach to measure your beach profiles – Mark these clearly on your mapFor each Site:- • Place a Ranging Pole at A (as close to the low-tide mark as safe) • Identify the key points where the slope angle seems to change (eg. Diagram A below) – use each of these points to divide your profile into sections • Measure the distance between point A and B using a measuring tape (Record this in the tables on the next page) • Measure the slope angle between point A and B using a clinometer (Record this in the tables on the next page) • Repeat this process for Sections B-C, C-D, etc Diagram A
    14. 14. Methodology Updrift Downdrift1. Identify a sample of 5-10 groynes and mark these on your map2. As close to the low water Wave Direction mark as is safe use a Diagram C metre rule to measure the exposed height of the groyne updrift (direction waves are coming from) – See Diagram B and C – Record this in the table on the next page3. Repeat the same exercise downdrift of the groyne Diagram B Height of Exposed Groyne
    15. 15. VA A SA SR R VR
    16. 16. For your safety: • Remain in groups of 2 or 3 at all times • Obey all signs in the area • Do not go into the water No using the or climb on cliffs ferry! In your group, you need to: • Conduct 4 Beach Profiles • Complete 10 Groyne height measurements • Complete pebble sampling • Complete land use mapping • Map sea defencesLimit of activity • Conduct questionnaires • Create field sketches and maps • Take photographs of evidence of coastal processes, existing seaPC= Toilets defences, land uses, economic activity, habitats • Make notes on the area • Complete any extra data collection • Make notes on anyMeet at the café drop off point at 10am, 11:30am, 2pm, 2:30pm problems and limitationsOur slot at Beach survey is: of your data collection

    ×