Kenowa Hills Public Schools<br />Bond Issue Summary<br />April 14, 2010<br />
Why Is the Time Now?<br />Millage Reduction = 0.3 mils<br />Low interest ARRA Bonds<br />Safety & Security<br />Technology...
PHASE 1 proposal<br /><ul><li>Immediate needs: safety, energy, 					technology, buses, athletics.
Smaller bond issue, no millage increase, saves    		$ for future bonding capacity.
 Protects the operational budget.
Allows more time to 		discuss phase 2 issues.</li></ul>Staff photo<br />here<br />
Bond Issue Amount: $14,325,000<br />
Welcome2010 Kenowa Hills Bond Campaign Kickoff <br />
Approximately 40% of the bond is focused on this building alone<br />Inadequate security & surveillance systems in place<b...
Middle School Classroom Technology<br />
High School<br />Much needed improvements to Technology<br />Remodeling of classroom for Autism Program<br />Athletic Faci...
Men’s Bathroom<br />Women’s Bathroom<br />
No Security System/Cameras in place<br />Sidewalks and other related areas are a safety hazard<br />Single pane windows an...
No Security System/Cameras in place<br />Sidewalks and other related areas are a safety hazard<br />Single pane windows an...
“Yes Voter” Contact Information<br />Indicate that you are a “Yes Voter” forms are in the lobby and can be turned in a few...
Upcoming SlideShare
Loading in …5
×

Kenowa hills bond campaign kickoff presentation

615 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
615
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Kenowa hills bond campaign kickoff presentation

  1. 1. Kenowa Hills Public Schools<br />Bond Issue Summary<br />April 14, 2010<br />
  2. 2. Why Is the Time Now?<br />Millage Reduction = 0.3 mils<br />Low interest ARRA Bonds<br />Safety & Security<br />Technology Improvements<br /> Lower Energy Costs<br /> General Fund Savings<br /> Transportation – 6 buses<br /> Athletic Facility Safety and Compliance<br />
  3. 3. PHASE 1 proposal<br /><ul><li>Immediate needs: safety, energy, technology, buses, athletics.
  4. 4. Smaller bond issue, no millage increase, saves $ for future bonding capacity.
  5. 5. Protects the operational budget.
  6. 6. Allows more time to discuss phase 2 issues.</li></ul>Staff photo<br />here<br />
  7. 7. Bond Issue Amount: $14,325,000<br />
  8. 8.
  9. 9. Welcome2010 Kenowa Hills Bond Campaign Kickoff <br />
  10. 10. Approximately 40% of the bond is focused on this building alone<br />Inadequate security & surveillance systems in place<br />Incredibly inefficient building for energy use(single pane windows, exterior doors, etc.)<br />Substantial water drainage and damage issues which are ongoing and require immediate work<br />Have to prepare building for the addition of 6th grade students next fall<br />Middle School<br />
  11. 11. Middle School Classroom Technology<br />
  12. 12.
  13. 13.
  14. 14. High School<br />Much needed improvements to Technology<br />Remodeling of classroom for Autism Program<br />Athletic Facilities……where do we begin?<br />High School & Athletic Facilities<br />
  15. 15. Men’s Bathroom<br />Women’s Bathroom<br />
  16. 16.
  17. 17.
  18. 18.
  19. 19.
  20. 20.
  21. 21.
  22. 22.
  23. 23. No Security System/Cameras in place<br />Sidewalks and other related areas are a safety hazard<br />Single pane windows and doors<br />Old entry doors allow the weather elements in<br />Alpine, Zinser & Walker Station<br />
  24. 24.
  25. 25.
  26. 26.
  27. 27. No Security System/Cameras in place<br />Sidewalks and other related areas are a safety hazard<br />Single pane windows and doors<br />Need to prepare for the addition of Central Elementary<br />Central & Intermediate Building<br />
  28. 28.
  29. 29. “Yes Voter” Contact Information<br />Indicate that you are a “Yes Voter” forms are in the lobby and can be turned in a few different ways<br />We will help remind the “Yes Voters” of the vote the day before and the week before”<br />These are due by Friday, April 30th-Please!<br />Facebook Information Page<br />“Support Kenowa Hills Bond on May 4th”<br /><ul><li>No Robo-Calls & No Yard Signs, so WE NEED YOUR HELP!
  30. 30. “Parents Supporting Kenowa Hills” Campaign Account was set up at Chemical Bank</li></ul>Family & Friends Campaign Strategy<br />
  31. 31. April - Absentee Ballots Available<br />April 30 Friday – “Yes Voter” Forms due<br />May 1 Saturday – Email Reminder sent out to Database!<br />May 1 Saturday – Clerk’s office open until 2:00 for Absentee Applications<br />May 3 Monday – Absentee Ballots due by 4:00<br />May 3 Monday – Email Reminder sent out to “Yes Voter” Database<br />May 4 Tuesday – School Election<br />Key Dates<br />
  32. 32. Question & Answers<br />
  33. 33. Thank You!2010 Kenowa Hills Bond Campaign Kickoff <br />

×