Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

0

Share

Chuanz product development process

Chuanz OEM/ODM product development process. For outside product inquiries or our internal original designs.

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

Chuanz product development process

  1. 1. 斯康科技 Design & Development Process Design Input Responsible Party General Schedule Total New product concepts Client Original desired function and performance Desing requirement from end-user/market improve to avoid Customer requirements failure Applicable statutory and regulatory Client / Project supervisor 1.5 weeks mode requirements Information collection -- 1.5 weeks Experience derived from our previous similar designs Product Enigneer Zero day meeting DFMEA Design Output Graphic Product Engineer Desing Pro-E 3D or AutoCAD drawing Improve Circuit diapram Design & Drawings -- 1 week to the fault on Product Specification Circuit Diagram -- 1 week 2.5 weeks prototype Quality plan and check list Quality Engineer Release for Prototype DFMEA Prototype -- 1.5 weeks Design Review (2 weeks if electronic included) 4.5 weeks Product Engineer Desing Mechanical/Electric/Security/Productivity Improve by mold Release for Mold touch-up Off-tooling sample Punching mold -- 3 weeks 8.5 weeks Design Verification Plastic mold -- 4 weeks Die cast mold -- 5 weeks EVT Test (Engineering sample Verification Desing Test) Quality Engineer Off-tooling sample and testing 10.5 weeks Improve DVT Test (Design Verification Test on off- by mold -- 2 weeks second tooling samples) Project Supervisor touch-up Engineering sample DFMEA Mold touch-up -- 1 week Design Validation Trial production and testing 11.5 weeks Project Supervisor -- 2 weeks 12.5 weeks PVT Test (Productivity Validation Test on Improve Trial production) Client production process/ Release for Pilot run production PMP sample layout-IE PFMEA Qualified samples for Design Approval approval--1 week 13.5 weeks Qualified production samples for client approval Client Production sample Release for production Production Production Production and Inspection Shipping sample Production Shipping Inspection and Logistic

Chuanz OEM/ODM product development process. For outside product inquiries or our internal original designs.

Views

Total views

644

On Slideshare

0

From embeds

0

Number of embeds

43

Actions

Downloads

0

Shares

0

Comments

0

Likes

0

×