The European Energy Infrastructure
Challenge
Alberto Pototschnig, Director
Funseam: Winter Seminar
Madrid, 6 March 2015
President Junker’s Priorities
The European Energy Union
.pool our resources, combine our infrastructures
and unite our negotiating power vis-à-vis third countries
.diversify our energy sources, and reduce the energy
dependency of several of our Member States
.keep our European energy market open to our
neighbours. However, if the price for energy from the
East becomes too expensive, either in commercial or in
political terms, Europe should be able to switch very
swiftly to other supply channels. We need to be able
to reverse energy flows when necessary
.strengthen the share of renewable energies on our
continent. This is not only a matter of a responsible
climate change policy.[…] Europe’s Energy Union to
become the world number one in renewable energies
2
The European Energy Union
Energy
Union
Energy
security,
solidarity and
trust
A fully-
integrated
Internal
Energy
Market
Energy
efficiency/
moderation of
energy
demand
Decarboni-
sation of the
economy
Research and
Innovation
3
EU Energy Policy and Infrastructure
Sustainability Competitiveness Security of
Supply
Support the
penetration of
renewable
energy
sources
The Three Pillars
Infrastructure
Support the
integration of
the Internal
Energy
Market
Support the
diversification of
energy sources
and routes and
the cross-border
sharing of
generation
capacity
4
European Council Conclusions – 4 Feb 2011
More Efficient Use
of Existing
Infrastructure
Removal of
Energy Islands
(by 2015)
Market
Integration
(by 2014)
Infrastructure
Expansion
Market Design
Improvements
Efficient
Infrastructure
Planning and
Development
5
.Electricity transmission systems, storage and
smart grid applications
€ 142 bn
of which:
» Interconnections € 70 bn
» Offshore connections € 32 bn
» Smart grids € 40 bn
.Gas pipelines, storage, LNG terminals and
reverse flow infrastructure
€ 70 bn
of which
» Outside the EU € 12 bn
Energy Infrastructure Investment
European Commission’s estimates – November 2010
(Energy Infrastructure Priorities for 2020 and beyond)
6
Ad

Recommended

Janez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatJanez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatWEC Italia
 
European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...European Power Generation Strategy Power Project Financing Summit Prague 1 De...
European Power Generation Strategy Power Project Financing Summit Prague 1 De...weerokoster
 
3 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 20133 borko raicevic en c sustainable energy, december 2013
3 borko raicevic en c sustainable energy, december 2013UNDPhr
 
Macro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeMacro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeStatkraft
 

More Related Content

What's hot

The completion of the internal market and the way ahead: ACER's view
The completion of the internal market and the way ahead: ACER's viewThe completion of the internal market and the way ahead: ACER's view
The completion of the internal market and the way ahead: ACER's viewFlorence Shool of Regulation
 
Renewable Energy Policy: What comes after Feed-in Tariffs?
Renewable Energy Policy: What comes after Feed-in Tariffs?Renewable Energy Policy: What comes after Feed-in Tariffs?
Renewable Energy Policy: What comes after Feed-in Tariffs?Florence Shool of Regulation
 
State aid enforcement in the energy sector in South Eastern Europe
State aid enforcement in the energy sector in South Eastern EuropeState aid enforcement in the energy sector in South Eastern Europe
State aid enforcement in the energy sector in South Eastern EuropeFlorence Shool of Regulation
 
HS2AA Analysis of the new business case for HS2 14 March 2011
HS2AA Analysis of the new business case for HS2 14 March 2011HS2AA Analysis of the new business case for HS2 14 March 2011
HS2AA Analysis of the new business case for HS2 14 March 2011HS2 Action Alliance
 
Sales of Spanish green certificates in the EU
Sales of Spanish green certificates in the EUSales of Spanish green certificates in the EU
Sales of Spanish green certificates in the EUAlejo Etchart Ortiz
 
Nationally Significant Infrastructure Projects and IPC
Nationally Significant Infrastructure Projects and IPCNationally Significant Infrastructure Projects and IPC
Nationally Significant Infrastructure Projects and IPCCharles Cowap
 
Energy Efficiency: How efficient is the current regulatory framework?
Energy Efficiency: How efficient is the current regulatory framework?Energy Efficiency: How efficient is the current regulatory framework?
Energy Efficiency: How efficient is the current regulatory framework?Florence Shool of Regulation
 
Hs2 aa presentation on the new business case 29 march
Hs2 aa presentation on the new business case  29 marchHs2 aa presentation on the new business case  29 march
Hs2 aa presentation on the new business case 29 marchHS2 Action Alliance
 
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...A Hagan
 
Electricvehicles austrianclimateresearch
Electricvehicles austrianclimateresearchElectricvehicles austrianclimateresearch
Electricvehicles austrianclimateresearchrollerballrohit8
 
A TIAM/IMACLIM bottom-up/top-down linkage: application to a prospective Outlo...
A TIAM/IMACLIM bottom-up/top-down linkage: application to a prospective Outlo...A TIAM/IMACLIM bottom-up/top-down linkage: application to a prospective Outlo...
A TIAM/IMACLIM bottom-up/top-down linkage: application to a prospective Outlo...IEA-ETSAP
 
Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...Florence Shool of Regulation
 
SATIMGE-2020
SATIMGE-2020SATIMGE-2020
SATIMGE-2020IEA-ETSAP
 

What's hot (20)

The completion of the internal market and the way ahead: ACER's view
The completion of the internal market and the way ahead: ACER's viewThe completion of the internal market and the way ahead: ACER's view
The completion of the internal market and the way ahead: ACER's view
 
GRT Gaz
GRT GazGRT Gaz
GRT Gaz
 
Hungary
HungaryHungary
Hungary
 
Croatia
CroatiaCroatia
Croatia
 
Renewable Energy Policy: What comes after Feed-in Tariffs?
Renewable Energy Policy: What comes after Feed-in Tariffs?Renewable Energy Policy: What comes after Feed-in Tariffs?
Renewable Energy Policy: What comes after Feed-in Tariffs?
 
Montenegro
MontenegroMontenegro
Montenegro
 
State aid enforcement in the energy sector in South Eastern Europe
State aid enforcement in the energy sector in South Eastern EuropeState aid enforcement in the energy sector in South Eastern Europe
State aid enforcement in the energy sector in South Eastern Europe
 
HS2AA Analysis of the new business case for HS2 14 March 2011
HS2AA Analysis of the new business case for HS2 14 March 2011HS2AA Analysis of the new business case for HS2 14 March 2011
HS2AA Analysis of the new business case for HS2 14 March 2011
 
Sales of Spanish green certificates in the EU
Sales of Spanish green certificates in the EUSales of Spanish green certificates in the EU
Sales of Spanish green certificates in the EU
 
Nationally Significant Infrastructure Projects and IPC
Nationally Significant Infrastructure Projects and IPCNationally Significant Infrastructure Projects and IPC
Nationally Significant Infrastructure Projects and IPC
 
Poland
PolandPoland
Poland
 
Energy Efficiency: How efficient is the current regulatory framework?
Energy Efficiency: How efficient is the current regulatory framework?Energy Efficiency: How efficient is the current regulatory framework?
Energy Efficiency: How efficient is the current regulatory framework?
 
Hs2 aa presentation on the new business case 29 march
Hs2 aa presentation on the new business case  29 marchHs2 aa presentation on the new business case  29 march
Hs2 aa presentation on the new business case 29 march
 
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...
 
Gie
GieGie
Gie
 
Electricvehicles austrianclimateresearch
Electricvehicles austrianclimateresearchElectricvehicles austrianclimateresearch
Electricvehicles austrianclimateresearch
 
A new role for the Agency
A new role for the AgencyA new role for the Agency
A new role for the Agency
 
A TIAM/IMACLIM bottom-up/top-down linkage: application to a prospective Outlo...
A TIAM/IMACLIM bottom-up/top-down linkage: application to a prospective Outlo...A TIAM/IMACLIM bottom-up/top-down linkage: application to a prospective Outlo...
A TIAM/IMACLIM bottom-up/top-down linkage: application to a prospective Outlo...
 
Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...Legal challenges in establishing organised electricity markets and market cou...
Legal challenges in establishing organised electricity markets and market cou...
 
SATIMGE-2020
SATIMGE-2020SATIMGE-2020
SATIMGE-2020
 

Similar to The European Energy Infrastructure Challenge. Alberto Pototschnig

Remida fedarene - gorizia 13.5.2015
Remida   fedarene - gorizia 13.5.2015Remida   fedarene - gorizia 13.5.2015
Remida fedarene - gorizia 13.5.2015Informest
 
2023-27 Snam Strategic Plan presentation
2023-27 Snam Strategic Plan presentation2023-27 Snam Strategic Plan presentation
2023-27 Snam Strategic Plan presentationSnam
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfGlennBerry13
 
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...Power System Operation
 
France, moving away from nuclear technology?
France, moving away from nuclear technology?France, moving away from nuclear technology?
France, moving away from nuclear technology?Leonardo ENERGY
 
UK, nuclear and renewables' struggle
UK, nuclear and renewables' struggleUK, nuclear and renewables' struggle
UK, nuclear and renewables' struggleLeonardo ENERGY
 
Implication of transport policies when meeting Swedish climate goals
Implication of transport policies when meeting Swedish climate goalsImplication of transport policies when meeting Swedish climate goals
Implication of transport policies when meeting Swedish climate goalsIEA-ETSAP
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...RCREEE
 
Energy Research and the Swiss Energy Strategy 2050
Energy Research and the Swiss Energy Strategy 2050Energy Research and the Swiss Energy Strategy 2050
Energy Research and the Swiss Energy Strategy 2050IEA-ETSAP
 
H2Hub Wallonia : From innovation to market - 03 juin 2021
H2Hub Wallonia : From innovation to market - 03 juin 2021H2Hub Wallonia : From innovation to market - 03 juin 2021
H2Hub Wallonia : From innovation to market - 03 juin 2021Cluster TWEED
 
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,Forth
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureНАЕК «Енергоатом»
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureUkrainian Nuclear Society
 
2020-2024 strategic plan: Towards Net Zero
2020-2024 strategic plan: Towards Net Zero2020-2024 strategic plan: Towards Net Zero
2020-2024 strategic plan: Towards Net ZeroSnam
 
Development of 2050’s national long-term energy plans for carbon neutrality t...
Development of 2050’s national long-term energy plans for carbon neutrality t...Development of 2050’s national long-term energy plans for carbon neutrality t...
Development of 2050’s national long-term energy plans for carbon neutrality t...IEA-ETSAP
 
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...WEC Italia
 

Similar to The European Energy Infrastructure Challenge. Alberto Pototschnig (20)

Remida fedarene - gorizia 13.5.2015
Remida   fedarene - gorizia 13.5.2015Remida   fedarene - gorizia 13.5.2015
Remida fedarene - gorizia 13.5.2015
 
Security of Gas Supply in the Energy Community
Security of Gas Supply in the Energy CommunitySecurity of Gas Supply in the Energy Community
Security of Gas Supply in the Energy Community
 
2023-27 Snam Strategic Plan presentation
2023-27 Snam Strategic Plan presentation2023-27 Snam Strategic Plan presentation
2023-27 Snam Strategic Plan presentation
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdf
 
Completing the Internal Energy Market
Completing the Internal Energy Market Completing the Internal Energy Market
Completing the Internal Energy Market
 
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
 
France, moving away from nuclear technology?
France, moving away from nuclear technology?France, moving away from nuclear technology?
France, moving away from nuclear technology?
 
UK, nuclear and renewables' struggle
UK, nuclear and renewables' struggleUK, nuclear and renewables' struggle
UK, nuclear and renewables' struggle
 
Implication of transport policies when meeting Swedish climate goals
Implication of transport policies when meeting Swedish climate goalsImplication of transport policies when meeting Swedish climate goals
Implication of transport policies when meeting Swedish climate goals
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...
 
Energy Research and the Swiss Energy Strategy 2050
Energy Research and the Swiss Energy Strategy 2050Energy Research and the Swiss Energy Strategy 2050
Energy Research and the Swiss Energy Strategy 2050
 
H2Hub Wallonia : From innovation to market - 03 juin 2021
H2Hub Wallonia : From innovation to market - 03 juin 2021H2Hub Wallonia : From innovation to market - 03 juin 2021
H2Hub Wallonia : From innovation to market - 03 juin 2021
 
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
Electrification as a Solution for Port Decarbonization by Bernat Adriá Mora,
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon future
 
European Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon futureEuropean Nuclear Industry’s role towards a low carbon future
European Nuclear Industry’s role towards a low carbon future
 
2020-2024 strategic plan: Towards Net Zero
2020-2024 strategic plan: Towards Net Zero2020-2024 strategic plan: Towards Net Zero
2020-2024 strategic plan: Towards Net Zero
 
Cefic
CeficCefic
Cefic
 
Development of 2050’s national long-term energy plans for carbon neutrality t...
Development of 2050’s national long-term energy plans for carbon neutrality t...Development of 2050’s national long-term energy plans for carbon neutrality t...
Development of 2050’s national long-term energy plans for carbon neutrality t...
 
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
Giuseppe Zollino, Italian National Delegate FP7 Energy Committee - I programm...
 
The Clean Energy Package and the Role of Renewables
The Clean Energy Package and the Role of RenewablesThe Clean Energy Package and the Role of Renewables
The Clean Energy Package and the Role of Renewables
 

More from Funseam - Fundación para la Sostenibilidad Energética y Ambiental

More from Funseam - Fundación para la Sostenibilidad Energética y Ambiental (20)

Foodback. Mercabarna. III Ciclo Economía Circular
Foodback. Mercabarna. III Ciclo Economía Circular Foodback. Mercabarna. III Ciclo Economía Circular
Foodback. Mercabarna. III Ciclo Economía Circular
 
Exolum. Ciudades Circulares. III Ciclo EC Funseam-FReopsol
Exolum. Ciudades Circulares. III Ciclo EC Funseam-FReopsolExolum. Ciudades Circulares. III Ciclo EC Funseam-FReopsol
Exolum. Ciudades Circulares. III Ciclo EC Funseam-FReopsol
 
EcoÁridos. Proyecto Repsol. III Ciclo EC Funseam-
EcoÁridos. Proyecto Repsol. III Ciclo EC Funseam-EcoÁridos. Proyecto Repsol. III Ciclo EC Funseam-
EcoÁridos. Proyecto Repsol. III Ciclo EC Funseam-
 
Nuevas Tecnologías para la valorización de residuos agrícolas y ganaderos. II...
Nuevas Tecnologías para la valorización de residuos agrícolas y ganaderos. II...Nuevas Tecnologías para la valorización de residuos agrícolas y ganaderos. II...
Nuevas Tecnologías para la valorización de residuos agrícolas y ganaderos. II...
 
Sostenibilidad en Vestas, III Ciclo EC
Sostenibilidad en Vestas, III Ciclo ECSostenibilidad en Vestas, III Ciclo EC
Sostenibilidad en Vestas, III Ciclo EC
 
CircRural4.0, III Ciclo Economía Circular
CircRural4.0, III Ciclo Economía CircularCircRural4.0, III Ciclo Economía Circular
CircRural4.0, III Ciclo Economía Circular
 
MESA REDONDA: FINANZAS SOSTENIBLES. Luis Viartola Dragados_XSimposioFunseam20...
MESA REDONDA: FINANZAS SOSTENIBLES. Luis Viartola Dragados_XSimposioFunseam20...MESA REDONDA: FINANZAS SOSTENIBLES. Luis Viartola Dragados_XSimposioFunseam20...
MESA REDONDA: FINANZAS SOSTENIBLES. Luis Viartola Dragados_XSimposioFunseam20...
 
MESA REDONDA: FINANZAS SOSTENIBLES. Sandra Lagumina Meridiam_XSimposioFunseam...
MESA REDONDA: FINANZAS SOSTENIBLES. Sandra Lagumina Meridiam_XSimposioFunseam...MESA REDONDA: FINANZAS SOSTENIBLES. Sandra Lagumina Meridiam_XSimposioFunseam...
MESA REDONDA: FINANZAS SOSTENIBLES. Sandra Lagumina Meridiam_XSimposioFunseam...
 
MESA REDONDA: FINANZAS SOSTENIBLES. Andres Suarez Exolum X SimposioFunseam202...
MESA REDONDA: FINANZAS SOSTENIBLES. Andres Suarez Exolum X SimposioFunseam202...MESA REDONDA: FINANZAS SOSTENIBLES. Andres Suarez Exolum X SimposioFunseam202...
MESA REDONDA: FINANZAS SOSTENIBLES. Andres Suarez Exolum X SimposioFunseam202...
 
Manuel Villa _Energy Transition and Energy Regulatory Sandboxes_Funseam Semin...
Manuel Villa _Energy Transition and Energy Regulatory Sandboxes_Funseam Semin...Manuel Villa _Energy Transition and Energy Regulatory Sandboxes_Funseam Semin...
Manuel Villa _Energy Transition and Energy Regulatory Sandboxes_Funseam Semin...
 
Rafael Sánchez _Energy Transition and Ennergy Regulatory Sandboxes_Funseam Se...
Rafael Sánchez _Energy Transition and Ennergy Regulatory Sandboxes_Funseam Se...Rafael Sánchez _Energy Transition and Ennergy Regulatory Sandboxes_Funseam Se...
Rafael Sánchez _Energy Transition and Ennergy Regulatory Sandboxes_Funseam Se...
 
Leonardo Meeus _Energy Transition and Energy Regulatory Sandboxes_Funseam Sem...
Leonardo Meeus _Energy Transition and Energy Regulatory Sandboxes_Funseam Sem...Leonardo Meeus _Energy Transition and Energy Regulatory Sandboxes_Funseam Sem...
Leonardo Meeus _Energy Transition and Energy Regulatory Sandboxes_Funseam Sem...
 
Georges Zissis _Energy Transition and Energy Regulatory Sandboxes_Funseam Sem...
Georges Zissis _Energy Transition and Energy Regulatory Sandboxes_Funseam Sem...Georges Zissis _Energy Transition and Energy Regulatory Sandboxes_Funseam Sem...
Georges Zissis _Energy Transition and Energy Regulatory Sandboxes_Funseam Sem...
 
Enrique Morgades _Energy Transition and Energy Rregulatory Sandboxes_Funseam ...
Enrique Morgades _Energy Transition and Energy Rregulatory Sandboxes_Funseam ...Enrique Morgades _Energy Transition and Energy Rregulatory Sandboxes_Funseam ...
Enrique Morgades _Energy Transition and Energy Rregulatory Sandboxes_Funseam ...
 
Elena de Benavides _Energy transition and energy regulatory sandboxes_Funseam...
Elena de Benavides _Energy transition and energy regulatory sandboxes_Funseam...Elena de Benavides _Energy transition and energy regulatory sandboxes_Funseam...
Elena de Benavides _Energy transition and energy regulatory sandboxes_Funseam...
 
Seminario Funseam WEO2021_Mariano Marzo
Seminario Funseam WEO2021_Mariano MarzoSeminario Funseam WEO2021_Mariano Marzo
Seminario Funseam WEO2021_Mariano Marzo
 
Innovation Rregulation Framework Eenergy Transition Yolanda Fernández EDP
Innovation Rregulation Framework Eenergy Transition Yolanda Fernández EDPInnovation Rregulation Framework Eenergy Transition Yolanda Fernández EDP
Innovation Rregulation Framework Eenergy Transition Yolanda Fernández EDP
 
Innovation and Technology Barriers: from Research to Implementation in Energy...
Innovation and Technology Barriers: from Research to Implementation in Energy...Innovation and Technology Barriers: from Research to Implementation in Energy...
Innovation and Technology Barriers: from Research to Implementation in Energy...
 
Hydroge. What is needed. Anton Martinez _ Enagas
Hydroge. What is needed. Anton Martinez _ EnagasHydroge. What is needed. Anton Martinez _ Enagas
Hydroge. What is needed. Anton Martinez _ Enagas
 
Workshop of Innovation Funseam Transnet- Damien Valet
Workshop of Innovation Funseam Transnet- Damien Valet Workshop of Innovation Funseam Transnet- Damien Valet
Workshop of Innovation Funseam Transnet- Damien Valet
 

Recently uploaded

Stock Market Brief Deck for 2/21/24 .pdf
Stock Market Brief Deck for 2/21/24 .pdfStock Market Brief Deck for 2/21/24 .pdf
Stock Market Brief Deck for 2/21/24 .pdfMichael Silva
 
Tone at the top: the effects of gender board diversity on gender wage inequal...
Tone at the top: the effects of gender board diversity on gender wage inequal...Tone at the top: the effects of gender board diversity on gender wage inequal...
Tone at the top: the effects of gender board diversity on gender wage inequal...GRAPE
 
National Income National Income National Income
National Income National Income National IncomeNational Income National Income National Income
National Income National Income National Income19920606201903202019
 
2023_-_Master_Trust___GPP_Defaults_Report (2).pdf
2023_-_Master_Trust___GPP_Defaults_Report (2).pdf2023_-_Master_Trust___GPP_Defaults_Report (2).pdf
2023_-_Master_Trust___GPP_Defaults_Report (2).pdfHenry Tapper
 
letter to the EF and Premiership about pension liabilities
letter to the EF and Premiership about pension liabilitiesletter to the EF and Premiership about pension liabilities
letter to the EF and Premiership about pension liabilitiesHenry Tapper
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdfAdnet Communications
 
India Equity Strategy Presentation (2016) - HSBC
India Equity Strategy Presentation (2016) - HSBCIndia Equity Strategy Presentation (2016) - HSBC
India Equity Strategy Presentation (2016) - HSBCDimitarStoyanov46
 
AGRICULTURAL PRICE POLICY -AGRICULTURAL ECONOMICS.pptx
AGRICULTURAL PRICE POLICY -AGRICULTURAL ECONOMICS.pptxAGRICULTURAL PRICE POLICY -AGRICULTURAL ECONOMICS.pptx
AGRICULTURAL PRICE POLICY -AGRICULTURAL ECONOMICS.pptxVISHALI SELVAM
 
Stock Market Brief Deck from youtube 2/16
Stock Market Brief Deck from youtube 2/16Stock Market Brief Deck from youtube 2/16
Stock Market Brief Deck from youtube 2/16Michael Silva
 
Slideshare - ONS Economic Forum Slidepack - 19 February 2024.pptx
Slideshare - ONS Economic Forum Slidepack - 19 February 2024.pptxSlideshare - ONS Economic Forum Slidepack - 19 February 2024.pptx
Slideshare - ONS Economic Forum Slidepack - 19 February 2024.pptxOffice for National Statistics
 
Elo’s result 2023: Return on investment increased to 6 per cent and cost effi...
Elo’s result 2023: Return on investment increased to 6 per cent and cost effi...Elo’s result 2023: Return on investment increased to 6 per cent and cost effi...
Elo’s result 2023: Return on investment increased to 6 per cent and cost effi...Työeläkeyhtiö Elo
 
E-learning Personal Finance Management - with design v2 .pptx
E-learning Personal Finance Management - with design v2 .pptxE-learning Personal Finance Management - with design v2 .pptx
E-learning Personal Finance Management - with design v2 .pptxakinsumboayomide
 
TIM GROUP FY '23 Preliminary Results.pdf
TIM GROUP FY '23 Preliminary Results.pdfTIM GROUP FY '23 Preliminary Results.pdf
TIM GROUP FY '23 Preliminary Results.pdfGruppo TIM
 
Stock Market Brief Deck for 2:22 youtube vid.pdf
Stock Market Brief Deck for 2:22 youtube vid.pdfStock Market Brief Deck for 2:22 youtube vid.pdf
Stock Market Brief Deck for 2:22 youtube vid.pdfMichael Silva
 
Indistinguishable from Magic: How the Cybersecurity Market Reached a Trillion...
Indistinguishable from Magic: How the Cybersecurity Market Reached a Trillion...Indistinguishable from Magic: How the Cybersecurity Market Reached a Trillion...
Indistinguishable from Magic: How the Cybersecurity Market Reached a Trillion...Adrian Sanabria
 
The Case for Commodities as an Asset Class.ppt
The Case for Commodities as an Asset Class.pptThe Case for Commodities as an Asset Class.ppt
The Case for Commodities as an Asset Class.pptJinzhiFeng1
 
99MW Nearshore Wind Farm in Colombia.pdf
99MW Nearshore Wind Farm in Colombia.pdf99MW Nearshore Wind Farm in Colombia.pdf
99MW Nearshore Wind Farm in Colombia.pdfVictoriaGaleano
 
business-model-canvas for collaborative business
business-model-canvas for collaborative businessbusiness-model-canvas for collaborative business
business-model-canvas for collaborative businessramijadpro
 

Recently uploaded (20)

Veritas Financial statement presentation 2023
Veritas Financial statement presentation 2023Veritas Financial statement presentation 2023
Veritas Financial statement presentation 2023
 
Stock Market Brief Deck for 2/21/24 .pdf
Stock Market Brief Deck for 2/21/24 .pdfStock Market Brief Deck for 2/21/24 .pdf
Stock Market Brief Deck for 2/21/24 .pdf
 
Tone at the top: the effects of gender board diversity on gender wage inequal...
Tone at the top: the effects of gender board diversity on gender wage inequal...Tone at the top: the effects of gender board diversity on gender wage inequal...
Tone at the top: the effects of gender board diversity on gender wage inequal...
 
National Income National Income National Income
National Income National Income National IncomeNational Income National Income National Income
National Income National Income National Income
 
2023_-_Master_Trust___GPP_Defaults_Report (2).pdf
2023_-_Master_Trust___GPP_Defaults_Report (2).pdf2023_-_Master_Trust___GPP_Defaults_Report (2).pdf
2023_-_Master_Trust___GPP_Defaults_Report (2).pdf
 
letter to the EF and Premiership about pension liabilities
letter to the EF and Premiership about pension liabilitiesletter to the EF and Premiership about pension liabilities
letter to the EF and Premiership about pension liabilities
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
 
India Equity Strategy Presentation (2016) - HSBC
India Equity Strategy Presentation (2016) - HSBCIndia Equity Strategy Presentation (2016) - HSBC
India Equity Strategy Presentation (2016) - HSBC
 
AGRICULTURAL PRICE POLICY -AGRICULTURAL ECONOMICS.pptx
AGRICULTURAL PRICE POLICY -AGRICULTURAL ECONOMICS.pptxAGRICULTURAL PRICE POLICY -AGRICULTURAL ECONOMICS.pptx
AGRICULTURAL PRICE POLICY -AGRICULTURAL ECONOMICS.pptx
 
Stock Market Brief Deck from youtube 2/16
Stock Market Brief Deck from youtube 2/16Stock Market Brief Deck from youtube 2/16
Stock Market Brief Deck from youtube 2/16
 
Slideshare - ONS Economic Forum Slidepack - 19 February 2024.pptx
Slideshare - ONS Economic Forum Slidepack - 19 February 2024.pptxSlideshare - ONS Economic Forum Slidepack - 19 February 2024.pptx
Slideshare - ONS Economic Forum Slidepack - 19 February 2024.pptx
 
Elo’s result 2023: Return on investment increased to 6 per cent and cost effi...
Elo’s result 2023: Return on investment increased to 6 per cent and cost effi...Elo’s result 2023: Return on investment increased to 6 per cent and cost effi...
Elo’s result 2023: Return on investment increased to 6 per cent and cost effi...
 
E-learning Personal Finance Management - with design v2 .pptx
E-learning Personal Finance Management - with design v2 .pptxE-learning Personal Finance Management - with design v2 .pptx
E-learning Personal Finance Management - with design v2 .pptx
 
TIM GROUP FY '23 Preliminary Results.pdf
TIM GROUP FY '23 Preliminary Results.pdfTIM GROUP FY '23 Preliminary Results.pdf
TIM GROUP FY '23 Preliminary Results.pdf
 
Monthly Economic Monitoring of Ukraine No.229, February 2024
Monthly Economic Monitoring of Ukraine No.229, February 2024Monthly Economic Monitoring of Ukraine No.229, February 2024
Monthly Economic Monitoring of Ukraine No.229, February 2024
 
Stock Market Brief Deck for 2:22 youtube vid.pdf
Stock Market Brief Deck for 2:22 youtube vid.pdfStock Market Brief Deck for 2:22 youtube vid.pdf
Stock Market Brief Deck for 2:22 youtube vid.pdf
 
Indistinguishable from Magic: How the Cybersecurity Market Reached a Trillion...
Indistinguishable from Magic: How the Cybersecurity Market Reached a Trillion...Indistinguishable from Magic: How the Cybersecurity Market Reached a Trillion...
Indistinguishable from Magic: How the Cybersecurity Market Reached a Trillion...
 
The Case for Commodities as an Asset Class.ppt
The Case for Commodities as an Asset Class.pptThe Case for Commodities as an Asset Class.ppt
The Case for Commodities as an Asset Class.ppt
 
99MW Nearshore Wind Farm in Colombia.pdf
99MW Nearshore Wind Farm in Colombia.pdf99MW Nearshore Wind Farm in Colombia.pdf
99MW Nearshore Wind Farm in Colombia.pdf
 
business-model-canvas for collaborative business
business-model-canvas for collaborative businessbusiness-model-canvas for collaborative business
business-model-canvas for collaborative business
 

The European Energy Infrastructure Challenge. Alberto Pototschnig

  • 1. The European Energy Infrastructure Challenge Alberto Pototschnig, Director Funseam: Winter Seminar Madrid, 6 March 2015
  • 2. President Junker’s Priorities The European Energy Union .pool our resources, combine our infrastructures and unite our negotiating power vis-à-vis third countries .diversify our energy sources, and reduce the energy dependency of several of our Member States .keep our European energy market open to our neighbours. However, if the price for energy from the East becomes too expensive, either in commercial or in political terms, Europe should be able to switch very swiftly to other supply channels. We need to be able to reverse energy flows when necessary .strengthen the share of renewable energies on our continent. This is not only a matter of a responsible climate change policy.[…] Europe’s Energy Union to become the world number one in renewable energies 2
  • 3. The European Energy Union Energy Union Energy security, solidarity and trust A fully- integrated Internal Energy Market Energy efficiency/ moderation of energy demand Decarboni- sation of the economy Research and Innovation 3
  • 4. EU Energy Policy and Infrastructure Sustainability Competitiveness Security of Supply Support the penetration of renewable energy sources The Three Pillars Infrastructure Support the integration of the Internal Energy Market Support the diversification of energy sources and routes and the cross-border sharing of generation capacity 4
  • 5. European Council Conclusions – 4 Feb 2011 More Efficient Use of Existing Infrastructure Removal of Energy Islands (by 2015) Market Integration (by 2014) Infrastructure Expansion Market Design Improvements Efficient Infrastructure Planning and Development 5
  • 6. .Electricity transmission systems, storage and smart grid applications € 142 bn of which: » Interconnections € 70 bn » Offshore connections € 32 bn » Smart grids € 40 bn .Gas pipelines, storage, LNG terminals and reverse flow infrastructure € 70 bn of which » Outside the EU € 12 bn Energy Infrastructure Investment European Commission’s estimates – November 2010 (Energy Infrastructure Priorities for 2020 and beyond) 6
  • 7. .“Mid-term mature” projects € 35-42 bn (commissioning by 2019) .“Long-term mature” projects€ 25-36 bn (commissioning in 2020-24) .“Less mature” projects € 44-66 bn (commissioning beyond 2024) Electricity Infrastructure Investment ENTSO-E TYNDP 2014 as assessed and aggregated in the Agency’s Opinion No 01/2015 of 29.01.2015 7
  • 8. Project Cost Estimates (€bn) Gas Infrastructure Investment ENTSOG TYNDP 2013-2022 8 Infrastructure Type FID Non-FID Total) Transmission (incl. CS) 7.1 53.4 60.5 LNG Terminals 1.8 6.9 8.7 Storage Facilities 0.8 2.8 3.6 Total 9.7 63.1 72.8
  • 9. Infrastructure Planning and Development Third Energy Package (2009) TYNDPs - Non-binding, … but reference for national NDPs - EU dimension in Network Planning - TYNDPs updated every two years TEN-E Regulation (2013) Projects of Common Interest (PCI) TEN-E Guidelines (2006) Projects of Common/European Interest - Long list of approx. 550 projects - Selection based on political agreement - No revision of the list envisaged in 7 yrs 9
  • 10. .Objectives » Implementation of 12 priority corridors/areas … » necessary to meet EU’s energy and climate policy goals by 2020 and beyond … » by providing policy and regulatory certainty … » through a stable and appropriate regulatory framework … » to promote the necessary investments TEN-E Regulation Regulation (EU) No 347/2013 10
  • 11. 35 46 “Smart grids” and Electricity highways all MS concerned Priority Electricity corridors Baltic Energy Market Interconnection Plan in electricity North South interconnections in Central and South Europe Northen Seas Off-shore grid North South interconnections in Western Europe 11
  • 12. 109 87 Priority Gas corridors North South gas interconnections in Central Eastern and South Europe Southern Gas Corridor « SGC » North South gas interconnections in Western Europe Baltic Energy Market Interconnection Plan in gas 12
  • 13. Energy Infrastructure Investment “Connecting Europe – The energy infrastructure for tomorrow” 13 Priority Corridor/Thematic Area Total Investment Need (€ bn) Estimated Investment Gap (€ bn) North Seas O/S G 30 8 NSI West Elec. 30 6 NSI CEE-SEE Elec. 40 12 BEMIP Electricity 5 3 Smart Grids 40 20 Total Electricity 145 49 (34%) NSI West Gas 20 1 NSI CEE-SEE Gas 26 5 Southern GC 22 8 BEMIP Gas 3 2 Total Gas 71 16 (23%)
  • 14. Electricity Transmission Investment Expected Investment Costs per country (€bn) (excluding smart grids) 14 Source: ENTSO-E, 2012. 0 5 10 15 20 25 30 35 DE UK FR IT NO ES IE NL PL SE BE CZ PT DK AT FI LT RO LV EE GR LU SK SI BU HR HU CY
  • 15. PCI Toolbox .Expedient permit granting procedures » Priority status, including for EIA procedures » Competent authority to manage permitting » Time limits for procedures (3.5 years max) » Enhanced transparency and public participation .Regulatory and other support measures » Cost-benefit analysis (CBA) » Cross-border cost allocation (CBCA): “beneficiaries pay” principle » Risk-related incentives » Financial support (grants for studies and financial instruments for all PCIs and grants for works for some) 15
  • 16. Importance of the Cost-Benefit Analysis .The CBAs should represent the basis for: » Preparation of TYNDPs (including an assessment of individual projects) by ENTSOs » PCI selection by Regional Groups (EC and MSs) » CBCA decisions by NRAs (or ACER) » Decisions to extend grants for works support under the Connecting Europe Facility .ENTSOs released draft CBA methodologies on 15 November 2013 .Agency’s Opinions on 30 January 2014 (ENTSO- E’s CBA) and 13 February 2014 (ENTSOG’s CBA) 16
  • 17. Projects of Common Interest (PCIs) .General criteria: » Contribute to infrastructure priorities (corridors) » Economic, social, environmental viability » Involve at least two Member States » Have significant cross-border impact » Part of TYNDP (from the 2015 PCI list) .Specific criteria: » Market integration (market, price convergence) » Security of supply » Sustainability » Competition (diversification – gas only) 17
  • 18. PCI Identification Process Prepare TYNDP for E and G ENTSO Project Promoters Submit candidate projects Criteria CBA for mature projects NRAs Check criteria application and cross- border relevance Regional Groups Evaluate Projects Rank Define regional lists Opinion on the draft Regional Lists and cross-border consistency MSs EC MSs and EC decide on Regional PCI Lists EC adopts PCI list 18
  • 19. First Union PCI List .Approved by Member States on 24 Jul 2013 .Adopted by the Commission on 14 Oct 2013 Commission Delegated Regulation (EU) No 1391/2013 ELECTRICITY PCIs Transm. Storage Sm. Grids Total North Seas O/S G 24 3 27 (12) NSI West Elec. 28 4 32 (21) NSI CEE-SEE Elec. 57 4 61 (26) BEMIP Electricity 10 2 12 (7) Smart Grids 2 2 (2) Total 119 13 2 134 (68) GAS PCIs Pipelines LNG/CNG UGS Total NSI West Gas 24 2 1 27 (20) NSI CEE-SEE Gas 44 5 4 53 (23) Southern GC 11 1 0 12 (4) BEMIP Gas 8 3 1 12 (8) Total 87 11 6 104 (55) 19
  • 20. Electricity and Smart Grids PCIs 20
  • 22. PCIs involving Spain PCI n. Description 2.6 Spain internal line between Santa Llogaia and Bescanó (ES) to increase capacity of the interconnection between Bescanó (ES) and Baixas (FR) 2.7 France - Spain interconnection between Aquitaine (FR) and the Basque country (ES) 2.8 Coordinated installation and operation of a phase-shift transformer in Arkale (ES) to increase capacity of the interconnection between Argia (FR) and Arkale (ES) 2.17 Portugal - Spain interconnection between Vila Fria - Vila do Conde – Recarei (PT) and Beariz - Fontefría (ES) 5.4 3rd interconnection point between Portugal and Spain 5.5 Eastern Axis Spain-France - interconnection point between Iberian Peninsula and France at Le Perthus– currently known as Midcat 22
  • 23. Main features of the Agency’s approach (Recommendation No 07/2013 of 25 September 2013) .Economic, social and environmental costs and benefits of the projects to be taken into account .Compensation provided only if at least one hosting country bears negative net benefit .Compensation should mainly aim at the “elimination of the negative net benefit” .Compensation should be provided by countries to which the project provides a “significant” positive net benefit .“significance threshold” equal to 10% of the sum of positive net benefits of all net benefiting countries Cross-border cost allocation (CBCA) 23
  • 24. Investment/CBCA Requests Total investment requests (22) Electricity (5) Gas (17) CBCA decisions taken by NRAs 3 10 CBCA decisions taken by ACER 0 1 CBCA decisions pending at ACER 1 0 Investment request still incomplete 0 1 Investment requests withdrawn 1 5 TOTAL 5 17 24
  • 25. PCI code Project name Status 4.2.1 Interconnection between Kilingi-Nõmme (EE) and Riga CHP2 substation (LV) Decision adopted by NRAs 4.2.2 Internal line between Harku and Sindi (EE) Decision adopted by NRAs 4.4.1 Internal line between Ventspils, Tume and Imanta (LV) Decision adopted by NRAs 4.5.1 LT part of interconnection between Alytus (LT) and LT/PL border Referred to ACER 3.11.4 Internal line between Kocin and Mirovka (CZ) Withdrawn Electricity CBCAs as of January 2015 25
  • 26. PCI code Project name Status 5.10 Reverse flow interconnection on TENP pipeline in Germany Decision adopted by NRAs 5.12 Reverse flow interconnection on TENP pipeline to Eynatten (Germany) Decision adopted by NRAs 5.18 Reinforcement of the German network to reinforce interconnection capacities with Austria [Monaco pipeline phase I] (Haiming/ Burghausen-Finsing) Decision adopted by NRAs 5.2 Twinning of Southwest Scotland onshore system between Cluden and Brighouse Bay (UK) Decision adopted by NRAs 5.3 (part) Shannon pipeline connecting PCI Shannon LNG Terminal located between Tarbert and Ballylongford (IE) in Count Kerry to the national gas grid at Foynes Decision adopted by NRAs Gas CBCAs (1) as of January 2015 26
  • 27. PCI code Project name Status 5.7 Reinforcement of the French network from South to North on the Bourgogne pipeline between Etrez and Voisines (France) [Val de Saone project] Decision adopted by NRA 8.2.3 Capacity enhancement of Klaipeda-Kiemenai pipeline in Lithuania Decision adopted by NRA 8.2.4 Modernisation & expansion of Incukalns Underground Gas Storage Decision adopted by NRA 8.5 Gas Interconnection Poland-Lithuania (GIPL) Decision adopted by ACER 6.1 (cluster) Cluster Czech–Polish interconnection upgrade and related internal reinforcements in Western Poland, including 11 PCIs Decision by NRAs appealed, but subsequently confirmed Gas CBCAs (2) as of January 2015 27
  • 28. PCI code Project name Status 6.2 (cluster) Cluster Poland–Slovakia interconnection and related internal reinforcements in Eastern Poland, including 9 PCIs Decision adopted by NRAs 6.3 Slovakia–Hungary Gas Interconnection between Vel’ké Zlievce (SK) – Balassagyarmat border (SK/HU) – Vecsés (HU) Withdrawn 7.1.5 Gas pipeline from Bulgaria to Austria via Romania and Hungary Incomplete request 8.1.1 Interconnector between Estonia and Finland “Balticconnector” Withdrawn 8.1.2.1 Finngulf LNG Withdrawn 8.1.2.2 Paldiski LNG Withdrawn 8.1.2.3 Tallinn LNG Withdrawn Gas CBCAs (3) as of January 2015 28
  • 29. Context .530 km pipeline with initial capacity 2.4 bcm/y, cost €558 m, net benefits €830 m .Aimed at ending isolation of Baltic Member States from EU gas market and at diversifying gas supply GIPL CBCA Decision (1) Process .1 May: no NRA decision within 6 months deadline, investment request referred to ACER (Art. 12(6) TEN-E Regulation) .May - July: consultations with NRAs and project promoters .11 August: Decision No 01/2014 adopted and notified to parties concerned. Decision published on 29 August 29
  • 30. Assessment .Admissibility, completeness and maturity .Costs and benefits by Member State GIPL CBCA Decision (2) Cross-Border Cost Allocation (ACER Recommendation No 07/2013 of 25 September 2013) .Compensation payable upon project commissioning GIPL Costs and Benefits (€m) 0 100 200 300 400 500 600 700 800 PL LT LV EE Benefits Costs Payer TSO Recipient TSO Compensation Payment (€m) AB Amber Grid (LT) Gaz-System S.A. (PL) 54.9 (64.0%) JSC Latvijas Gāze (LV) Gaz-System S.A. (PL) 29.4 (34.3%) AS EG Vorguteenus (EE) Gaz-System S.A. (PL) 1.5 (1.7%) Total Compensation 85.8 (100%) 30
  • 31. CBCA Decisions: Main Features .The vast majority of the CBCA decisions are on projects located in one country in which the relevant TSO will bear 100% of the costs .In half of the cases the NRAs accepted the CBCA proposed by the Project Promoters .In all but one case, the NRAs have agreed not to allocate costs to non-hosting beneficiaries .In the two cases where more than 7% of CAPEX were proposed to be allocated to any non-hosting beneficiary, the concerned NRAs failed to reach an agreement .GIPL: ACER Decision 11 August 2014 .LitPol: referred to ACER on 9 December 2014 31
  • 32. 0 100 200 300 400 Work Study Type of action €million Connecting Europe Facility .€ 5.85 bn of financial support to energy PCIs (2014-20) .First round (21 November 2014): € 647 million 32
  • 33. CEF Funding: First Round Corr./ Area PCI Name Action Type € m BEMIP Gas PCI Poland-Lithuania interconnection Works 306.0 BEMIP Elec Interconnection between Kilingi-Nömme (EE) and Riga CHP2 Works 112.3 BEMIP Elec Internal line between Ventspils, Tume and Imanta (LV) Works 55.1 NSI West Gas PCI Twinning of Southwest Scotland onshore system between Cluden and Brighouse Bay (UK) Works 31.7 A G North Atlantic Green Zone Project (Ireland, UK) Works 31.7 NSOG PCI Norway-United Kingdom interconnection Study 31.3 BEMIP Gas Capacity enhancement of Klaipeda-Kiemenai pipeline in Lithuania Works 27.6 Others 51.5 33
  • 34. Working towards the Second PCI List .Expected to be adopted in Autumn 2015 .More robust CBA methodologies available .Cross-border Cost Allocation .Application of the .“elimination of the negative net benefit” criterion .“significance threshold” criterion 34
  • 35. Thank you for your attention Thank you for your attention 35 www.acer.europa.eu