FPC Greensboro, Town Hall Meeting Presentation, Oct. 3, 2010

441 views

Published on

First Presbyterian Church of Greensboro.
For Master Planning Process 2010.
www.fpcgreensboro.info.

Published in: Spiritual, Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
441
On SlideShare
0
From Embeds
0
Number of Embeds
21
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

FPC Greensboro, Town Hall Meeting Presentation, Oct. 3, 2010

  1. 2. bartzen + ball architecture design and planning
  2. 3. bartzen + ball architecture design and planning FIRST PRESBYTERIAN CHURCH OF GREENSBORO, FACILITY MASTER PLAN
  3. 5. 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  4. 6. 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  5. 7. 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  6. 8. 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  7. 9. 3D Massing Study Model Concept Development Expanded Drop Off Areas New ‘Front Door’ Entry
  8. 10. Aerial View
  9. 11. Programming Analysis 3D Programming Model Existing Program 128,387SF Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  10. 12. Programming Analysis 3D Programming Model Proposed Program 135,890SF Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  11. 13. Programming Analysis 3D Programming Model Existing Internal Circulation Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  12. 14. Programming Analysis 3D Programming Model Proposed Internal Circulation Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  13. 15. Programming Analysis 3D Programming Model Existing Shared Spaces Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  14. 16. Programming Analysis 3D Programming Model Proposed Shared Spaces Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  15. 17. Programming Analysis 3D Programming Model Church Staff- Existing Existing 6,288 sf Proposed 5,883 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  16. 18. Programming Analysis 3D Programming Model Church Staff- Proposed Existing 6,288 sf Proposed 5,883 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  17. 19. Programming Analysis 3D Programming Model Pastoral Care - Existing Existing 8,608 sf Proposed 9,011 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  18. 20. Programming Analysis 3D Programming Model Pastoral Care - Proposed Existing 8,608 sf Proposed 9,011 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  19. 21. Programming Analysis 3D Programming Model Music - Existing Existing 6,448 sf Proposed 6,114 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  20. 22. Programming Analysis 3D Programming Model Music - Proposed Existing 6,448 sf Proposed 6,114 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  21. 23. Programming Analysis 3D Programming Model Christian Education - Existing Existing 46,781 sf Proposed 42,285 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  22. 24. Programming Analysis 3D Programming Model Christian Education - Proposed Existing 46,781 sf Proposed 42,285 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  23. 25. Programming Analysis 3D Programming Model Weekday Preschool - Existing Existing 28,154 sf Proposed 24,480 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  24. 26. Programming Analysis 3D Programming Model Weekday Preschool - Proposed Existing 28,154 sf Proposed 24,480 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  25. 27. Programming Analysis 3D Programming Model First School - Existing Existing 12,035 sf Proposed 16,865 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  26. 28. Programming Analysis 3D Programming Model First School - Proposed Existing 12,035 sf Proposed 16,865 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  27. 29. Programming Analysis 3D Programming Model Outreach - Existing Existing 20,073 sf Proposed 31,252 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  28. 30. Programming Analysis 3D Programming Model Outreach - Proposed Existing 20,073 sf Proposed 31,252 sf Mullin Life Center Sanctuary Corl Building Smith Building Memorial Building Shetler Building Parking Garage Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  29. 31. Concept Development 3D Massing Study Model – Existing Massing Mullin Life Center Sanctuary Corl Building Memorial Building Shetler Building Parking Garage Smith Building
  30. 32. 3D Massing Study Model Concept Development Removal of Corl Building
  31. 33. 3D Massing Study Model Concept Development New Parking Area
  32. 34. 3D Massing Study Model Concept Development New Green Roof – Playground
  33. 35. 3D Massing Study Model Concept Development Proposed Future Development
  34. 36. 3D Massing Study Model Concept Development New ‘Front Door’/’Community Space’ Redeveloped Green Street
  35. 37. Aerial View
  36. 38. Aerial View
  37. 39. Programming Analysis Church Staff – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  38. 40. Programming Analysis Church Staff – Upper Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  39. 41. Programming Analysis Pastoral Care – Lower Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  40. 42. Programming Analysis Pastoral Care – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  41. 43. Programming Analysis Pastoral Care – Upper Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  42. 44. Programming Analysis Music – Middle Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  43. 45. Programming Analysis Music – Upper Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  44. 46. Programming Analysis Music – Upper Roof Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  45. 47. Programming Analysis Christian Education – Basement Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  46. 48. Programming Analysis Christian Education – Lower Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  47. 49. Programming Analysis Christian Education – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  48. 50. Programming Analysis Christian Education – Upper Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  49. 51. Programming Analysis Christian Education – Upper Roof Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  50. 52. Programming Analysis Weekday Preschool – Lower Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  51. 53. Programming Analysis Weekday Preschool – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  52. 54. Programming Analysis Weekday Preschool – Upper Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  53. 55. Programming Analysis First School – Lower Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  54. 56. Programming Analysis First School – Middle Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  55. 57. Programming Analysis First School – Upper Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  56. 58. Programming Analysis Circulation Shared Spaces Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach Outreach – Basement Level Existing None Proposed
  57. 59. Programming Analysis Outreach – Lower Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  58. 60. Programming Analysis Outreach – Middle Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  59. 61. Programming Analysis Outreach – Upper Level Existing Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  60. 62. Programming Analysis Outreach – Upper Roof Level Existing None Proposed Church Staff Pastoral Care Music Christian Education Weekday Preschool First School Outreach
  61. 63. bartzen + ball architecture design and planning
  62. 65. Aerial View
  63. 66. <ul><li>MP Team: Bartzen + Ball Architects w/ Sutton-Kennerly Engineers </li></ul><ul><li>2008-9 Strategic Planning & Implementation Process: Ongoing </li></ul><ul><li>Master Planning Process: 6 months (June – December 2010) </li></ul><ul><li>Preliminary Review by Session: September 20th </li></ul><ul><li>Presentation to Congregation: October 3rd </li></ul><ul><li>Capital Campaign Process: January 2011 </li></ul>Introduction
  64. 67. <ul><li>1993 Moser Mayer Master Plan </li></ul><ul><li>Construction of the Mullin Life Center </li></ul><ul><li>Purchase of the Shetler Building </li></ul><ul><li>Purchase of the Greene Street Properties </li></ul><ul><li>2008-2009 Strategic Planning Process </li></ul><ul><li>2010 Master Planning Process Update </li></ul>Background
  65. 68. <ul><li>I. Data Collection/Digital Archive/ </li></ul><ul><li>Code Verification/Visioning June 2010 </li></ul><ul><li>Programming/3D Model/Building Assessments July </li></ul><ul><li>Preliminary Concept Planning/Draft Program August </li></ul><ul><li>Master Plan Alternatives September </li></ul><ul><li>Preferred Master Plan October </li></ul><ul><li>VI. Final Master Plan November 2010 </li></ul>Process
  66. 69. <ul><li>Data Collection/Digital Archive/Code Verification/Visioning July </li></ul><ul><ul><li>Existing plan updates and organization </li></ul></ul><ul><ul><li>Existing Facilities Tour and Initial Interviews </li></ul></ul><ul><ul><li>Project Web Site Construction </li></ul></ul><ul><li>Programming/3D Model/Building Assessments August </li></ul><ul><ul><li>Preliminary 3D model of existing facilities </li></ul></ul><ul><ul><li>Building System Assessments </li></ul></ul><ul><ul><li>Preliminary Programming Interviews </li></ul></ul><ul><ul><li>Creation of DWF plan diagrams </li></ul></ul><ul><li>Preliminary Concept Planning/Draft Program September </li></ul><ul><ul><li>Preliminary Concepts </li></ul></ul><ul><ul><li>Draft Programming: Analysis and Test Fits </li></ul></ul><ul><ul><li>3D model massing and use studies </li></ul></ul><ul><li>Master Plan Alternatives October </li></ul><ul><ul><li>Master Plan Alternatives </li></ul></ul><ul><ul><li>Congregational Meeting and Feedback </li></ul></ul><ul><ul><li>Draft Program Document </li></ul></ul><ul><ul><li>Priority Matrix </li></ul></ul><ul><li>Preferred Master Plan November </li></ul><ul><ul><li>Final Test Fits </li></ul></ul><ul><ul><li>Architectural Massing and Image </li></ul></ul><ul><ul><li>Preliminary Cost Model </li></ul></ul><ul><ul><li>Real Estate Initiatives </li></ul></ul><ul><li>Final Master Plan December </li></ul><ul><ul><li>Final Program Document </li></ul></ul><ul><ul><li>Final MP Recommendations </li></ul></ul><ul><ul><li>Final Cost Model </li></ul></ul><ul><ul><li>Coordination with Capital Campaign </li></ul></ul>Initiative & Update
  67. 70. <ul><li>Re-Connect/Clarify/Consolidate Church Programs/Ministries </li></ul><ul><ul><li>Accessibility for Old and Young </li></ul></ul><ul><ul><li>Access to Church Staff </li></ul></ul><ul><ul><li>Consolidation of underused or duplicated space </li></ul></ul><ul><li>Create a new Entry/Atrium Space off Greene Street </li></ul><ul><ul><li>New Public Front Door </li></ul></ul><ul><ul><li>Drop off and Pick Up </li></ul></ul><ul><ul><li>Gathering and Orientation space </li></ul></ul><ul><ul><li>Convenient Parking on Sundays </li></ul></ul><ul><li>Consolidate Outreach into a new Community Center/’Host Village’ </li></ul><ul><ul><li>Bring together FPC and associated non-profits in one location </li></ul></ul><ul><ul><li>Connect to FPC youth and pastoral care programs </li></ul></ul><ul><ul><li>Prioritize ‘Who What Where and Why’ </li></ul></ul><ul><li>Address Deferred Maintenance Issues </li></ul><ul><ul><li>Explore new Energy Efficient HVAC systems/Central Plant </li></ul></ul><ul><ul><li>Address building envelope issues in Sutton Kennerly Report </li></ul></ul><ul><ul><li>Upgrade Sanctuary, Smith, Memorial, Shetler for new smart technologies </li></ul></ul><ul><li>Support growth of Christian Ed and Preschool Programs </li></ul><ul><ul><li>Address needs of First School and Weekday Preschool Programs </li></ul></ul><ul><ul><li>Address needs of Christian Ed, Sunday School and Youth Programs </li></ul></ul><ul><ul><li>Improve connections with Sanctuary and Life Center etc. </li></ul></ul>Goals
  68. 71. <ul><li>Address new trends in Worship such as Rejoice/Music and to become an ‘asset to the community’ </li></ul><ul><ul><li>Provide new acoustically appropriate, worship space for 400-500 people </li></ul></ul><ul><ul><li>Connect this space to CE, Life Center, Sanctuary and Front Door </li></ul></ul><ul><ul><li>Upgrade Sanctuary for new technologies/lighting </li></ul></ul><ul><li>Embrace Greene Street </li></ul><ul><ul><li>More Pedestrian/Less Vehicular </li></ul></ul><ul><ul><li>Drop off and Parking for Church and Schools </li></ul></ul><ul><ul><li>Handicap Accessibility to Sanctuary and Church Facilities </li></ul></ul><ul><ul><li>New Streetscape Improvements: Trees, Signage, Traffic controls </li></ul></ul><ul><ul><li>Connect into Greensboro Greenway System and Fisher Park </li></ul></ul><ul><li>Address Costs, Capital Campaign and Congregation </li></ul><ul><ul><li>Test Assumptions </li></ul></ul><ul><ul><li>Prioritize Projects and Phasing </li></ul></ul><ul><ul><li>Establish a Realistic Target for Capital Campaign </li></ul></ul>Goals (cont.)
  69. 72. <ul><li>Renovation of Smith and Memorial Buildings </li></ul><ul><ul><li>Phasing and current uses </li></ul></ul><ul><ul><li>Redhead Hall roof addition </li></ul></ul><ul><ul><li>HVAC issues </li></ul></ul><ul><li>Removal of Corl Building in future… </li></ul><ul><ul><li>What happens to Christian Ed/Preschools? </li></ul></ul><ul><ul><li>Connections to the rest of the campus will need to be rerouted </li></ul></ul><ul><ul><li>Construction in the middle of the campus will require careful planning and swing space on a temporary basis </li></ul></ul><ul><li>Removal of houses across Greene Street </li></ul><ul><ul><li>What happens to Interfaith Hospitality and Faith Action? </li></ul></ul><ul><ul><li>Fisher Park Neighborhood Association Concerns </li></ul></ul><ul><ul><li>Parking Lot/Garage/School Construction? </li></ul></ul><ul><ul><li>Greensboro City Planning Approval Process </li></ul></ul><ul><li>Shetler Transformation </li></ul><ul><ul><li>Must be accommodated over time due to renovation and new construction </li></ul></ul><ul><ul><li>How to pay for this?( i.e. Existing and future Non-Profits as paying tenants in cooperative arrangement?) </li></ul></ul><ul><ul><li>Exterior and interior renovations must be better understood before any moves can be made </li></ul></ul><ul><li>Capital Campaign </li></ul><ul><ul><li>Mullin Life Center </li></ul></ul><ul><ul><li>Bold and Ambitious Agenda </li></ul></ul><ul><ul><li>Priorities and Phasing Questions </li></ul></ul><ul><ul><li>Calendar and Rollout </li></ul></ul>Key Issues To Address
  70. 73. 3D Massing Study Model Concept Development New ‘Front Door’/’Community Space’
  71. 74. 3D Massing Study Model Concept Development New ‘Front Door’/’Community Space’ Redeveloped Green Street
  72. 75. 3D Massing Study Model Concept Development New First School Facility (Optional Expanded Facility)

×