FIRST TUESDAY PRESENTATION
FEBRUARY 2015
1
2
-
200.000
400.000
600.000
800.000
1.000.000
1.200.000
1.400.000
1.600.000
2013 2015 2020 2030
MW
Global cumulative wind po...
WIND AT NEW HEIGHTS
HEIGHT
AVERAGE
WIND SPEED
AVAILABLE
POWER
1 000 m 11 m/s 580 W/m2
500 M 8 m/s 320 W/m2
100 M 5 m/s 80 ...
A KITE TURBINE
A kite turbine is made up of the following main parts:
• A kite - which generates the tractive forces (lift...
A KITE TURBINE
A kite turbine is made up of the following main parts:
• A kite - which generates the tractive forces (lift...
PRINCIPLE
(1) Average world GWEC 2013, (2) Annuity 8 % x year (3) Real (excl. inflation), (4) excl. carbon tax, (IPCC) IPCCreport is...
ON THE VERGE OF A BREAKTHROUGH
University of Grenoble
Kitemill
Ampyx Power
Makani Power
Crosswind Power
Skywind Power
Skys...
Status for Kitemill:
Lean organization & a solid network of partners and close suppliers
Commercial: Progressing towards l...
COMMERCIAL
MARKETS
CONCEPT ACCEPTED ENABLE MARKET
EMERGING
MARKETS
CREATING THE MARKET
20192015
DEMOS IN OPERATION
COMMERC...
Site requirements:
• Suitable conditions
• Approval/permit/concession
• Offers operating experience
• Grid capacity
• Rele...
THE SCALE UP RACE
PROTOTYPE
DEMO 30 kW
DEMO MEDIUM
SCALEKITEMILL
TECHNOLOGY STEPS
2019
LARGE SCALE
2015
PRODUCT DEVELOPMEN...
NORWEGIAN INDUSTRY
Wind power global volume: 40 000 MW annual installed capacity:
336 BNOK and the industry employs 680 00...
SYSTEM DEVELOPMENT
15
FOR DETAILS, PLEASE CONTACT:
Thomas Hårklau
General Manager
th@kitemill.no
+47 468 37 117
Lode Carne...
Upcoming SlideShare
Loading in …5
×

Ekstremsport tar vindenergi til nye høgder @ First Tuesday Bergen

556 views

Published on

Ekstremsport tar vindenergi til nye høgder @ First Tuesday Bergen 3. februar 2015

Gründerane i Kitemill valte å satse på kite som prinsipp for framtidas energiforsyning. Teorien viser seg å stemme i praksis. Fordelane er så store og viktige at kite blir den neste store varige energiteknologien som bryter gjennom. Det vil gå raskare enn det gjorde for vindmøller. Teknologi fra forsvarsindustrien, fiske samt olje og gass kjem direkte til anvendelse. Den norske industrikapasiteten kan bli relevant i utrullinga, spesielt om Norge bli arenaen dette skjer på, men tidsvinduet er smalt.

Hårklau er utdanna elkraftingeniør ved høgskule i Bergen. Han starta i 2005 som kvalitetsleiar i ei bedrift som kommersialiserte ei ny løysning mot olje og gass næringa. Har frå karrierestart jobba med start, utvikling og kommersialisering av nyetableringar. I 2007 grunnlag Hårklau VossVind AS. Der var han daglig leiar der til desember 2011, nokre månader før opning av Skandinavias første resirkulerande vertikale vindtunnel. Hårklau er med-gründer og daglig leiar i Kitemill AS.

Published in: Business
  • Be the first to comment

  • Be the first to like this

Ekstremsport tar vindenergi til nye høgder @ First Tuesday Bergen

  1. 1. FIRST TUESDAY PRESENTATION FEBRUARY 2015 1
  2. 2. 2
  3. 3. - 200.000 400.000 600.000 800.000 1.000.000 1.200.000 1.400.000 1.600.000 2013 2015 2020 2030 MW Global cumulative wind power capacity Source: global cumulative wind power capacity: GWEC 2014 – Moderate Scenario, (1MW delivered represent about 1,2 MEUR in sales). Kitemill: "Airborne wind is expected to capture part of the market and to even expand growth further” Drivers: - Climate - Need for renewables Methods - Politically enabled 3 Airborne Wind Energy (AWE) POTENTIAL IS VIRTUALLY UNLIMITED
  4. 4. WIND AT NEW HEIGHTS HEIGHT AVERAGE WIND SPEED AVAILABLE POWER 1 000 m 11 m/s 580 W/m2 500 M 8 m/s 320 W/m2 100 M 5 m/s 80 W/m2 THE WIND GRADIENT is an expression of the increase in speed and stability with higher altitude. The energy content of the wind varies with the cube of the average wind speed
  5. 5. A KITE TURBINE A kite turbine is made up of the following main parts: • A kite - which generates the tractive forces (lift) in the same way as a sailplane that climbs. • Ground system - which converts the tractive force from the tether to electricity. • Control system - which controls winch and the kite. The kite is controlled in the same way as an autopilot for a plane.
  6. 6. A KITE TURBINE A kite turbine is made up of the following main parts: • A kite - which generates the tractive forces (lift) in the same way as a sailplane that climbs. • Ground system - which converts the tractive force from the tether to electricity. • Control system - which controls winch and the kite. The kite is controlled in the same way as an autopilot for a plane.
  7. 7. PRINCIPLE
  8. 8. (1) Average world GWEC 2013, (2) Annuity 8 % x year (3) Real (excl. inflation), (4) excl. carbon tax, (IPCC) IPCCreport issued 2012 “Renewable Energy Sources and Climate change Mitigation”. 1. Potential to become price competitive: 2. The geographical market is very large due to the availability of wind at high altitudes High altitude winds are more often available then near surface winds. Cost calculation - unit cost: Kite (Vision) Windmill (year 2012) Power kW 2 000 2 000 Full load hours per year hrs 4 200 2 452 (1) Annual production MWh 8,4 4,9 CAPEX M€ 1,5 2,3 Average energy cost LCoE: c€/kWh 2,8 6,4 (2,3) ATTRACTIVE WITH A POTENTIAL TO BECOME PRICE COMPETITIVE Electricity cost (sources calc. with 3% discount rate) Bioenergy (IPCC) Hydro power (IPCC) Kite Nuclear Wind onshore (IPCC) Geothermal (IPCC) Coal (4) Natural gas Wind offshore (IPCC) Solar (IPCC) c€/kWh41 2 3 5 6 70 Germany market price electricity 2014
  9. 9. ON THE VERGE OF A BREAKTHROUGH University of Grenoble Kitemill Ampyx Power Makani Power Crosswind Power Skywind Power Skysails EnerKite Kitegen NGR Kite Guangdon HAWP Technology Magenn Windlift Omnidea HAWP TU Delft KU Leuven University of Limerick DTU Wind Energy IWES Fraunhofer Chalmers University University of Tampere Stanford University RMIT University Companies Universities Source Delft University www.kitepower.eu, modified by Kitemill. Commercial sub-suppliers are not included even if their involvement includes investments and thereby «risk taking».
  10. 10. Status for Kitemill: Lean organization & a solid network of partners and close suppliers Commercial: Progressing towards launch of the first market place for kite turbines Technical: On pair with the best AWE players towards a commercial viable solution Financial: Dedicated owners and strong governmental backing ON THE VERGE OF A BREAKTHROUGH *Evaluation in acquisition Airborne Wind Energy (AWE)– players : Competitors Investor / Partner Time Status Altaeros (US) Softbank (JP) 7 MUSD December 2014 30kW pilot Makani (US) Google X (US) 110 MUSD* June 2013 20kW pilot Ampyx (NL) KLM September 2012 20kW pilot Kite Power (UK) Shell 2 MUSD 2013 20kW pilot Skysails (Germany) DSM 15 MEUR January 2011 55kW pilot
  11. 11. COMMERCIAL MARKETS CONCEPT ACCEPTED ENABLE MARKET EMERGING MARKETS CREATING THE MARKET 20192015 DEMOS IN OPERATION COMMERCIAL INSTALATIONS COMMERCIAL PRODUCTS >100 000 hrs>1000 hrs >10 000 hrsCUMULATIVE OPERATIONAL HOURS RAPID COMMERCIALISATION
  12. 12. Site requirements: • Suitable conditions • Approval/permit/concession • Offers operating experience • Grid capacity • Relevant local supply businesses THE FIRST KITE PARK HOSTS TEST CENTRE + COMMERCIAL PLANTS Invest in: - Infrastructure - First customer Become: - Competence centre - Commercial viable CREATING A MARKET PLACE FOR DEMO PLANTS Several business models open up (kite supplier, kite operator, site developer)
  13. 13. THE SCALE UP RACE PROTOTYPE DEMO 30 kW DEMO MEDIUM SCALEKITEMILL TECHNOLOGY STEPS 2019 LARGE SCALE 2015 PRODUCT DEVELOPMENT EFFICIENCY RATE WILL INCREASE BY SIZE OPERATION & MAINTENANCE COST WILL REDUCE BY SIZE
  14. 14. NORWEGIAN INDUSTRY Wind power global volume: 40 000 MW annual installed capacity: 336 BNOK and the industry employs 680 000 people. In time AWE can take over parts of this volume and even contribute to an increased. Examples of relevant Norwegian Industry: Annual turnover Kongsberg Maritime AS - winch/wind power supplier : 5 800 MNOK Rolls-Royce Deck Machinery AS – winch supplier at Brattvåg: 10 000 MNOK Offshore Trawl Services AS – one of worlds leading rope supplier: 86 MNOK
  15. 15. SYSTEM DEVELOPMENT 15 FOR DETAILS, PLEASE CONTACT: Thomas Hårklau General Manager th@kitemill.no +47 468 37 117 Lode Carnel Technical Manager lc@kitemill.no +47 902 90 602

×