Solar Power Project Development

1,321 views

Published on

FirstGreen Consulting is a company working in the area of renewable energy, energy efficiency and climate change
The team has extensive experience in handling the Renewable, and energy efficiency projects
FirstGreen is providing energy sector consultancy in the sustainable energy, with expertise ranging from carbon advisory to technical consulting, to project implementation and project management.

0 Comments
10 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,321
On SlideShare
0
From Embeds
0
Number of Embeds
24
Actions
Shares
0
Downloads
0
Comments
0
Likes
10
Embeds 0
No embeds

No notes for slide

Solar Power Project Development

  1. 1. Solar Project DevelopmentAF-Mercados EMI 1 FirstGreen
  2. 2.  Detailed Site Plan  Calculation of Solar Resource  Environmental Characteristics (Temp ,Wind  The Project Site Speed, Shading)  Installed Capacity??  Module type/Mounting System  Approximate Cost  System Design Outline Planning Permission  Estimated Energy Yield  Detailed Assessment of Grid Connection  Cost & Likelihood of Likelihood, Cost & Timing Achieving Grid-Connection  Predicted Energy Yield & Financial  Permitting Requirements?? Modeling based on that  Submission of Permit Application  Contracting Strategy (EPC/Multi Contract)  Decision on Financing Approach  PV Module/Other Tender Documentation  Supplier & Contractor Selection &A Project Sponsor RankingA Potential Site  Project Risk AnalysisFunds for Feasibility  Financial Modeling Covering Full Lifecycle  Preparation of DPR Assessments  Securing Financing for the Project AF-Mercados EMI 2 FirstGreen
  3. 3. Outline System Design AF-Mercados EMI 3 FirstGreen
  4. 4. Planning Applications AF-Mercados EMI 4 FirstGreen
  5. 5. DevelopmentAF-Mercados EMI 5 FirstGreen
  6. 6. Yield assessmentAF-Mercados EMI 6 FirstGreen
  7. 7. Typical analysis for the Solar Resource Monthly Averaged Insolation Data (kWh/m2/Day) (NASA) Latitude 14.45 Annual Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Longitude 76.56 Average 22-Year Avarage 5.33 6.09 6.51 6.41 6.19 4.9 4.44 4.51 5.09 4.94 4.93 4.98 5.35 Monthly Averaged Insolation Data (kWh/m2/Day) (PVSYST) Latitude14.45 Annual Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Longitude 76.56 Average 22-Year Average 5.26 5.9 6.54 6.55 6.2 5.14 4.67 4.71 5 4.67 4.6 4.75 5.3325 Global Global Month Global Incident Horizontal Effective January 162.5 192.7 187.5 February 170.5 189.6 184.5 march 201.8 209.6 203.8 April 192.3 187.3 181.6 May 191.9 179.2 173.2 June 147 136.6 131.7 July 137.6 129.1 124.4 August 139.8 135.1 130.5 September 152.7 154.2 149.4 October 153.1 163.2 158.6 November 147.9 168.1 163.3 December 154.4 182.7 177.5 Year 1951.5 2027.4 1966• The Average annual solar insolation at the proposed site is 5.34 kWh/m2/day (NASA earth science data)• As per NREL Insolation Map, the project site location falls in an annual average insolation belt of 5.2 to 5.4 kWh/m2/dayAF-Mercados EMI 7 FirstGreen
  8. 8. Detailed Project ReportAF-Mercados EMI 8 FirstGreen
  9. 9. Typical Plant LayoutAF-Mercados EMI 9 FirstGreen
  10. 10. SITE SELECTIONAF-Mercados EMI 10 FirstGreen
  11. 11. AF-Mercados EMI 11 FirstGreen
  12. 12. Site Selection – Local Climate AF-Mercados EMI 12 FirstGreen
  13. 13. Site Selection – Local ClimateAF-Mercados EMI 13 FirstGreen
  14. 14. Site Selection – Local Climate AF-Mercados EMI 14 FirstGreen
  15. 15. Site Selection – Local Climate AF-Mercados EMI 15 FirstGreen
  16. 16. Site Selection – Local Characteristics AF-Mercados EMI 16 FirstGreen
  17. 17. Site Selection – Local Characteristics AF-Mercados EMI 17 FirstGreen
  18. 18. Site Selection – Local Characteristics AF-Mercados EMI 18 FirstGreen
  19. 19. Site Selection – Local CharacteristicsAF-Mercados EMI 19 FirstGreen
  20. 20. Site Selection – Soil Characteristics Load Bearing Class of Material Pressure (lb/ft2) Crystalline Bedrock 12000 Sedimentary Rock 6000 Sandy Gravel or Gravel 5000 Sand, Silty Sand, Clayey Sand, Silty Gravel & Clayey Gravel 3000 Clay, Sandy Clay, Silty Clay & Clayey Silt 2000 AF-Mercados EMI 20 FirstGreen
  21. 21. Site Selection – Local ClimateAF-Mercados EMI 21 FirstGreen
  22. 22. AF-Mercados EMI 22 FirstGreen
  23. 23. Site Selection – Local Climate AF-Mercados EMI 23 FirstGreen
  24. 24. Site Selection – Local Climate AF-Mercados EMI 24 FirstGreen
  25. 25. Typical Project Site Layout AF-Mercados EMI 25 FirstGreen
  26. 26. Project Site evaluation HT line passing in the middle of the land AF-Mercados EMI 26 FirstGreen
  27. 27. Project Site evaluation Un even land AF-Mercados EMI 27 FirstGreen
  28. 28. Project Site evaluation Flat land but village kachha rasta passing in the middle of the land AF-Mercados EMI 28 FirstGreen
  29. 29. Yield AssessmentAF-Mercados EMI
  30. 30. Energy Yield Prediction – Why? A 100 kWp Solar Power plant will generate 470 kWh/Day at one location and 590 kWh/Day of power at other subject to resource availability  Difference of 120 units/day  At a tariff of Rs.10/ AF-Mercados EMI kWh, difference of FirstGreen 30
  31. 31. Energy Yield Prediction – How? AF-Mercados EMI 31 FirstGreen
  32. 32. Typical yield assessment AF-Mercados EMI 32 FirstGreen
  33. 33. Energy Yield Prediction – Typical Losses in the PV System AF-Mercados EMI 33 FirstGreen
  34. 34. Typical losses in the plantAF-Mercados EMI 34 FirstGreen
  35. 35. Uncertainty in Energy Yield PredictionAF-Mercados EMI 35 FirstGreen
  36. 36. Energy Yield Prediction – Resource through RETScreen AF-Mercados EMI Location: Jodhpur (Rajasthan) India 36 FirstGreen
  37. 37. Thank You FirstGreen Consulting Private Limited Gurgaon: 206, Tower B, Millennium Plaza, Sec 27, Gurgaon – 122002, India Tel.: (+91) 124 424 1750 , 9899295854 Fax: (+91) 124 424 1751 Web: www.firstgreenconsulting.in Email: sanjayvashishtha@gmail.comAF-Mercados EMI 37 FirstGreen

×