Public Facilities Manual Project NVBIA/NAIO Phase 2 Update - Nov. 21, 2019

  1. 1. Public Facilities Manual Project NVBIA/NAIOP Phase 2 Update Don Lacquement, Project Manager Danielle Badra, Outreach Coordinator Land Development Services November 21, 2019
  2. 2. Today’s Presentation •Background •Phase 2 Objectives •Actions to Date •Outreach •Phase 2 Highlights •Projected Schedule •Easy Ways to Be Involved •Contact Information 2
  3. 3. Background December 4, 2018 BOS approved “Phase 1” revisions to achieve flexibility & clarity in the land development review process. 3
  4. 4. Phase 2 Objectives • Resolve Complex Phase 1 Issues/Vet • Bring PFM into Alignment with Codes • Remove Replication • Incorporate LTIs • Add New and Updated Guidelines 4
  5. 5. Actions to Date • Developed a Phase 2 PFM Website. • Completed: Spring P2 Package - July 16, 2019. • In Progress: Winter P2 Package. 5
  6. 6. Outreach to County Staff 6 PFM Project Team Steering Committee Technical Advisory Committee DPC OCA BOS Land Use Aides PC Land Use Process Review
  7. 7. Outreach to Citizens 7 PFM Project Website Zoning Ordinance ListServ zMOD Citizens Working Group EQAC Tree Commission GRB ESRC Citizens- At-Large
  8. 8. Outreach to Land Development Industry 8 PFM Project Website Stakeholder Committee zMOD Land Use Attorneys ESI NVBIA NAIOP ESRC Industry Reps
  9. 9. Engineering Standards Review Committee 9 • Paul Johnson (NVBIA) • Kevin Nelson (VDOT) • Mark Liberati (Virginia Association of Surveyors) • Keith Sinclair (ESI) • Theodore Britt (VSPE) • James Clark (Heavy Construction Contractors Association) • Howard Guba (Citizen-at- Large) • Michael Kitchen (NAIOP) • Asad Rouhi (NVSWCD) • Bryan Layman (Associated Builders and Contractors) • Kevin Pullen (League of Women Voters) • Dr. Robert Norwood (Citizen-at-Large) • Paul Norsi (Citizen-at-Large) • Ned Poffenberger (Fairfax County Federation of Citizens Associations) • Robert Scheller (WACEL) • Bruce Titus (Fairfax Bar Association) • Saundra O’Connell (DPD) • Don Lacquement (LDS) • Chad Crawford (DPWES)
  10. 10. Phase 2 HighlightsStreetLights • Align PFM with Regulations of VDOT, Chapter 118. • Incorporate Urban Design Guidelines in CRAs, CRDs & Mixed- Use Areas. • Legislative Amendment to Decommission Solar Facilities. GeneralInformation Modernize Street Lights to Light Emitting Diode (LED) Fixtures. StormDrainage Provide Alternative Pipe Material for Storm Sewer. Require Dam Breach Inundation Zone Maps with As-Builts. • Minor Chapter 6 Updates In-Progress. 10
  11. 11. Phase 2 HighlightsStreets • Point to relevant VDOT Standards & Specifications to Facilitate Design & Review of Streets. • Clarify VDOT’s Shared-Use Path. Trails&Recreation • Update Trails Information to Reflect the Countywide Trails Plan. SanitarySewer • Elevate Manhole Covers to Prevent Inflow. • Remove Outdated Provisions such as Concrete Pipe. • Verify Pipe Types, DIP Liners, & Easement Width Requirements for Deep Sewers. 11
  12. 12. Phase 2 HighlightsTreeConservation • Clarify Critical Root Zone Requirement. • Update RPA Planting Density Specifications (Potential P2 Item). Geotechnical • Set Residential Basement Elevation Above Groundwater Table. • Incorporate Standards for the Use of Lime Stabilization. Geotechnical • Add Exploration Requirements for Deep Foundations. 12
  13. 13. Projected Schedule Winter P2 Package: Outreach: April through December 2019. Public hearings start April 2020. 13
  14. 14. Easy Ways to Be Involved Check out the PFM Project website. Review the chapter edits - routinely. Use the online feedback form or email. Attend the public hearings. 14
  15. 15. Questions? For more information: PFM Project Phase 2 Website https://www.fairfaxcounty.gov/landdevelopment/p ublic-facilities-manual-flexibility-project Contact: Danielle.Badra@fairfaxcounty.gov Don.Lacquement@fairfaxcounty.gov 15

×