Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Land Development Update: November 12, 2015

2,333 views

Published on

Land Development Update: November 12, 2015

NAIOP/NVBIA Joint Meeting

Nov. 12, 2015

Published in: News & Politics
  • Want to preview some of our plans? You can get 50 Woodworking Plans and a 440-Page "The Art of Woodworking" Book... Absolutely FREE ♥♥♥ http://ishbv.com/tedsplans/pdf
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • There are over 16,000 woodworking plans that comes with step-by-step instructions and detailed photos, Click here to take a look ➤➤ http://tinyurl.com/y3hc8gpw
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • The #1 Woodworking Resource With Over 16,000 Plans, Download 50 FREE Plans... ★★★ http://tinyurl.com/y3hc8gpw
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

Land Development Update: November 12, 2015

  1. 1. Land Development Update NAIOP/NVBIA Joint Meeting November 12, 2015
  2. 2. Booster Shot Hiring Agency Division Classification Status Comments 1 CAP Engineer III S27 1 - Filled Street Light Focus 2 DPZ Zoning Administration Planner III S27 1 - Filled 3 DPZ Zoning Evaluation Planner III S27 1 - Filled 4 Fire Marshal Fire Inspector II S20 1 - Filled 5 Fire Marshal Fire Inspector II S20 1 - Filled 6 Fire Marshal Administrative Assistant II S13 1 - Filled 7 Health Department Environmental Health Environmental Health Spec II S23 1 - Filled 8 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled 9 LDS Director's Office Management Analyst I S21 1 - Filled 10 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled 11 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 12 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled 13 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 14 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled 15 LDS IT Business Analyst III S27 1 - Filled 16 LDS Director's Office Planner IV S29 1 - Filled 17 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled 18 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled 19 Urban Forestry Urban Forester II S24 1 - Filled 20 FCDOT Transportation Planner II S24 2 - Interviews project to fill by mid-October 21 FCDOT Transportation Planner II S24 2 - Interviews project to fill by early November 22 Fire Marshal Engineer III S27 2 - Interviews interviews complete; offer pending 23 Fire Marshal Engineer III S27 2 - Interviews interviews complete; offer pending 24 DPZ Zoning Evaluation Planner III/II S27/S24 3 - Advertising readvertising for Planner II 25 LDS Site Development & Inspections Senior Engineering Inspector S21 3 - Advertising readvertising; interviews projected end of September 26 LDS Building Plan Review & Inspections Engineer III S27 4 - Pre-Advertisement Reclassifying to Eng IV 27 LDS HR Human Resources Generalist II S24 4 - Pre-Advertisement PD drafted; review in progress 28 LDS Director's Office Assistant Director S34 4 - Pre-Advertisement Position established-LDS Ops Director; preparing to advertise
  3. 3. Average Site Plan Timelines Plan Types Target Jul - Sep Last Period (Jul-Sep) Average for 2015 Average for 2014 Infill Lot Grading Plan (INF, Non-bonded Single Family) 28 26 27 26.0 25.9 Major Plan First Submission (SP, SD, PI) 60 57 55 58.5 66.8 Major (SP, SD, PI) Second DPE 21 21 25 22.2 33.1 Major (SP, SD, PI) Subsequent Non-DPE 60 50 58 62.1 68.6
  4. 4. Average Review Time Residential Building
  5. 5. Average Review Time Commercial Building
  6. 6. Consultant Study
  7. 7. Seven Cross Agency Initiatives • Joint Training Academy • Joint Information Center • Expansion of Project Management Pilot • Proffer Improvement • Retail Strategy • Parking Management Process • Unified Restaurant Process
  8. 8. LDS’s Top Six • Combine DPWES and VDOT initial inspection • VDOT package tracking tool to be modified and made available online • Bond Review: Provide a list of "common errors" and place online • Create a "Minimum Submission Review (MSR)“ • Reevaluate RPA review process • E-plans
  9. 9. E-Plans • Workflow / System Integration • Training • Equipment • Pilot
  10. 10. New NVBIA/NAIOP Webpage http://www.fairfaxcounty.gov/dpwes/committees/nvbia-naiop-fairfax-committee.htm
  11. 11. Fire Marshal’s Office – Plan Inventory 55 (Burkholder Backlog) plus 13 (Herrity Backlog) yields 68 plans (Ceiling is 100 total plans in backlog.) Plan Type No. on Hand Oldest Date Work Day Lag Sprinkler, Tenant plans without calculations 9 10-29-15 3 Sprinkler, Tenant plans with calculations 1 10-29-15 3 Sprinkler, Shell Bldgs., NFPA 13 systems 4 10-28-15 4 Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 1 11-2-15 1 Town of Herndon Building Tenant 0 -- 0 Fire Alarm, Tenant plans 16 10-29-15 3 Fire Alarm, Shell Bldgs. 5 10-16-15 12 Door Lock / Security plans 0 -- 0 Range Hood/Tanks/Foam/Public Safety Plans /Misc. 5 10-20-15 10 Site Plans/Rezoning 11 / 0 10-15-15 13 High-Piled Storage Plans 0 -- 0 Evacuation / Lockdown Plans 3 10-20-15 10 Burkholder Building Summary 55 10-15-15 XXXXXXXXX FM Architectural Review done at Herrity Building (Class 4 and Greater Building Plans) 6 10-21-15 9 FM Architectural Review (Fast Track Tenant Plans) 0 -- 0 FM Arch. Review (non-Fast Track Tenant Plans) 7 11-2-15 1 Herrity Building (B-2) Summary 13 10-21-15 XXXXXXXXX
  12. 12. Planning & Zoning

×