Presentation Agenda
• Introductions
• Project Objectives
• Summary of Prior Community Involvement
• Build Alternatives
• Future Traffic Analysis
• Questions and Answers
• Next Steps
2
Introductions
• County Staff
• Consultant Team (RK&K)
3
Project Objectives
• Address existing congestion
• Plan for future traffic
• Address queuing along Hunter Mill Road and
Sunset Hills Road
• Improve access to the Dulles Toll Road by
minimizing congestion
• Maintain Hunter Mill Road’s character by
applying context sensitive solutions
4
Project Background
• Board of Supervisors requested study
• “No Build” includes proffered improvements
from the Oakcrest School rezoning
• Two meetings held thus far:
o December 8, 2014: Kick-Off
o February 24, 2015: Existing & No-Build
conditions and community input on
alternatives
5
Project Process
8 MONTHS
6
We are Here
Project Study Area
7
Intersection ID Intersection
Intersection
Control Type
1
Hunter Mill Road at
Sunrise Valley Drive
Signalized
2
Hunter Mill Road at
DTR EB Ramps
Signalized
3
Hunter Mill Road at
DTR WB Ramps
Signalized
4
Hunter Mill Road at
Sunset Hills Road
Signalized
5
Hunter Mill Road at
Crowell Road
Unsignalized
(All-Way Stop)
6
Hunter Mill Road at
Hunting Crest Lane
Unsignalized
(Two-Way Stop)
7
Hunter Mill Road at
Lake Fairfax Park
Unsignalized
(Two-Way Stop)
7
6
5
4
3
2
1
Summary of Community Comments
• Do not want traffic from Wiehle Avenue diverted
to Hunter Mill Road
• Concerns that the signal at Crowell Road may
increase delays in the off-peak
• Roundabouts should be seriously examined as an
alternative for the corridor
• Keep Hunter Mill Road’s character the same
• Concern that improvements may attract more
traffic
8
9
Response to Community Questions
• Will these improvements attract vehicles to Hunter
Mill Road?
o Trips will divert from Hunter Mill Road and use Crowell. The
improvement will not add new trips to the road network, but
divert local trips.
• Can more lanes be accommodated under the
existing Toll Road Structures?
o More lanes cannot feasibly be accommodated under the DTR.
The piers for the Dulles Access Road are load bearing and
would need to be replaced. Replacement of just the two
bridges would be near $40 million, not including the cost of
improving Hunter Mill Road.
10
Response to Community Questions
• Will a signal at Crowell Road and Hunter Mill Road
increase delays in the off peak?
o An actuated signal can be used in the off peak to minimize
the delays of vehicles on Crowell Road.
• Why not consider moving the ramps of the Dulles
Toll Road?
o Prior to modifying the ramp termini of the Dulles Toll Road
all viable and workable alternatives need to be tested to
see if they work. Changing the Toll Road intersections is a
last step measure to improve the corridor as it would
require a federal review and a much more time consuming
process.
11
Community Input on Alternatives
• Test an all Roundabout Solution
• Test extending the right turn lane on southbound
Hunter Mill Road before the intersection of
Sunrise Valley Drive
• See if additional lanes can be added underneath
the Dulles Toll Road
• Test a realigned Sunset Hills Road
• To a mid point between the current location and Crowell
Road
• To Crowell Road
Future Conditions - Geometry
• Hunter Mill Road
Minor Arterial (Type B)
o 1 Lane in each direction (north of Sunset Hills Road)
o 2 Lanes Northbound, 1 Lane Southbound (south of Dulles
Toll Road)
o 35 miles per hour speed limit
• Sunrise Valley Drive
o Minor Arterial (Type B)
o 1 Lane in each direction (East of Hunter Mill Road)
o 2 Lanes in each direction (West of Hunter Mill Road)
o 35 miles per hour speed limit
12
Future Conditions - Geometry
13
• Sunset Hills Road
o Minor Arterial (Type B)
o 2 Lanes in each direction
o 35 miles per hour speed limit
• Crowell Road
o Minor Arterial (Type B)
o 1 Lane in each direction
o 35 miles per hour speed limit
Alternatives Developed
14
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 1A
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 1B
Alternatives Developed
15
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
No-Build
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 2
Crowell Road
Sunset Hills Road
Sunrise Valley Drive
HunterMillRoad
WB DTR
EB DTR
Alt. 3
16
Alternative 1A
Intersection Type
Sunrise Valley Drive Roundabout
Eastbound Dulles Toll Road Roundabout
Westbound Dulles Toll Road
& Sunset Hills Road
Roundabout
Crowell Road Roundabout
Alternative 1A
17
Sunrise Valley Drive DTR EB Off/On Ramps
Alternative 1A (Cont.)
18
DTR WB off/On Ramps Crowell Road/Relocated Sunset Hills Rd
19
Alternative 1B
Intersection Type
Sunrise Valley Drive Roundabout
Eastbound Dulles Toll Road Roundabout
Westbound Dulles Toll Road Roundabout
Sunset Hills Road Realigned to
Crowell Road
Roundabout
Alternative 1B
20
Sunrise Valley Drive DTR EB Off/On Ramps
Alternative 1B (Cont.)
21
DTR WB off/On Ramps Crowell Road/Relocated Sunset Hills Rd
22
Alternative 2
Intersection Type
Sunrise Valley Drive Signalized
Eastbound Dulles Toll Road Signalized
Westbound Dulles Toll Road Signalized
Sunset Hills Road – moved north Signalized
Crowell Road Signalized
Alternative 2
23
Sunrise Valley Drive DTR EB Off/On Ramps
Alternative 2 (Cont.)
24
DTR WB off/On Ramps & Relocated Sunset Hills Crowell Road
25
Alternative 3
Intersection Type
Sunrise Valley Drive Signalized
Eastbound Dulles Toll Road Signalized
Westbound Dulles Toll Road Signalized
Sunset Hills Road Realigned to
Crowell Road
Signalized
Alternative 3
26
Sunrise Valley Drive DTR EB Off/On Ramps
Alternative 3 (Cont.)
27
DTR WB off/On Ramps Crowell Road/Relocated Sunset Hills Rd
Need new
graphic
AM 2030 Comparison
28
Intersection Approach
AM Peak Hour
No Build Alternative 1A Alternative 1B Alternative 2 Alternative 3
Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS
Hunter Mill Road at
Sunrise Valley Drive
SB 24.2 C 8.2 A 8.2 A 23.0 C 23.2 C
EB 46.8 D 13.5 B 13.5 B 46.7 D 43.3 D
WB 44.0 D 17.4 B 17.4 B 41.8 D 41.5 D
Overall 38.1 D 13.2 B 13.2 B 36.9 D 35.9 D
Hunter Mill Road at
Dulles Toll Road EB Ramps
NB 20.5 C 16.9 B 16.9 B 16.2 B 16.4 B
SB 19.8 B 4.8 A 4.8 A 17.1 B 16.4 B
EB 74.8 E 11.8 B 11.8 B 59.6 E 55.7 E
Overall 30.6 C 12.3 B 12.3 B 18.7 B 18.4 B
Hunter Mill Road at
Dulles Toll Road WB Ramps
NB 27.3 C - - 5.3 A 4.7 A 6.5 A
SB 3.5 A - - 14.6 B 3.9 A 6.9 A
WB 62.4 E - - 15.9 B 47.8 D 42.8 D
Overall 29.8 C - - 11.0 B 15.4 B 15.9 B
Hunter Mill Road at
Dulles Toll Road WB Ramps at
Sunset Hills Road
NB - - 14.9 B - - - - - -
SB - - 535.0 F - - - - - -
WB - - 21.8 C - - - - - -
SEB - - 13.3 B - - - - - -
Overall - - 174.7 F - - - - - -
Hunter Mill Road at
Sunset Hills Road*
NB 31.5 C - - - - 32.5 C - -
SB 31.2 C - - - - 36.1 D - -
EB 84.4 F - - - - 56.0 E - -
Overall 41.1 D - - - - 38.0 D - -
Hunter Mill Road at
Crowell Road**
NB 13.2 B 20.0 B - - 19.0 B - -
SB 21.1 C 64.1 E - - 19.5 B - -
WB 42.1 D 12.4 B - - 49.5 D
Overall 24.7 C 29.0 C - - 29.2 C - -
Hunter Mill Road at
Crowell Road / Sunset Hills
Road
NB - - - - 13.1 B - - 30.9 C
SB - - - - 338.7 F - - 70.8 E
EB - - - - 9.8 A - - 42.9 D
WB - - - - 19.2 B - - 44.8 D
Overall - - - - 70.9 E - - 43.8 D
* Alt 2 in new location
** No Build includes the proffered signal at Crowell Road
PM 2030 Comparison
29
Intersection Approach
PM Peak Hour
No Build Alternative 1A Alternative 1B Alternative 2 Alternative 3
Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS
Hunter Mill Road at
Sunrise Valley Drive
SB 38.7 D 8.3 A 8.3 A 34.1 C 32.7 C
EB 64.6 E 177.3 F 177.3 F 54.1 D 56.4 E
WB 34.3 C 8.2 A 8.2 A 38.0 D 34.6 C
Overall 48.8 D 77.4 E 77.4 E 43.1 D 42.8 D
Hunter Mill Road at
Dulles Toll Road EB Ramps
NB 16.9 B 13.1 B 13.1 B 18.1 B 17.9 B
SB 19.5 B 4.8 A 4.8 A 11.8 B 11.4 B
EB 65.1 E 16.4 B 16.4 B 56.5 E 49.6 D
Overall 25.9 C 10.0 A 10.0 A 17.0 B 16.4 B
Hunter Mill Road at
Dulles Toll Road WB Ramps
NB 97.4 F - - 6.4 A 29.3 C 20.6 C
SB 21.3 C - - 178.0 F 30.7 C 38.6 D
WB 105.2 F - - 15.9 B 51.3 D 48.9 D
Overall 73.1 E - - 68.6 E 36.0 D 34.9 C
Hunter Mill Road at
Dulles Toll Road WB Ramps at
Sunset Hills Road
NB - - 10.3 B - - - - - -
SB - - 220.3 F - - - - - -
WB - - 22.5 C - - - - - -
SEB - - 106.6 F - - - - - -
Overall - - 80.4 F - - - - - -
Hunter Mill Road at
Sunset Hills Road*
NB 14.6 B - - - - 24.5 C - -
SB 59.4 E - - - - 2.8 A - -
EB 93.3 F - - - - 49.5 D - -
Overall 53.4 D - - - - 27.2 C - -
Hunter Mill Road at
Crowell Road**
NB 14.9 B 6.1 A - - 12.4 B - -
SB 19.6 B 9.9 A - - 20.4 C - -
WB 40.9 D 11.2 B - - 49.5 D - -
Overall 26.1 C 8.6 A - - 28.1 C - -
Hunter Mill Road at
Crowell Road / Sunset Hills
Road
NB - - - - 9.4 A - - 33.9 C
SB - - - - 10.8 B - - 26.7 C
EB - - - - 10.2 B - - 36.7 D
WB - - - - 11.5 B - - 34.5 C
Overall - - - - 10.4 B - - 30.0 C
* Alt 2 in new location
** No Build includes the proffered signal at Crowell Road
30
Findings/Conclusions
• Signalized Alternatives performs best at Hunter
Mill Road and Sunrise Valley Drive
• All alternatives approximately same at DTR
eastbound ramps
• Alternative 1A (roundabout with DTR Ramp and
Sunset Hills Road) performs the worst at DTR
westbound ramps
31
Findings/Conclusions (Cont’d)
• The signalized alternatives perform best at DTR
westbound ramps
• Sunset Hills Road operates best when realigned
to the north
• Corridor likely not “One Size Fits All” – Mix and
match of alternatives might be solution
32
Alternative Comparison
WB DTR
Ramps &
Sunset
Hills
Crowell
Road
ROW
Alternative 2 Alternative 3
Sunrise
Valley
Drive
EB DTR
Ramps
WB DTR
Ramps &
Sunset
Hills
Crowell
Road
Sunrise
Valley
Drive
EB DTR
Ramps
WB DTR
Ramps &
Sunset
Hills
Crowell
Road
Sunrise
Valley
Drive
EB DTR
Ramps
WB DTR
Ramps &
Sunset
Hills
Crowell
Road
Sunrise
Valley
Drive
EB DTR
Ramps
Alternative 1A Alternative 1B
COST
LOS
Alternative 1A Alternative 1B Alternative 2 Alternative 3
ROW
Cost
LOS
Better
Average
Worse
33
Questions
• 30 Minutes
• Please limit yourself to one question so others
have an opportunity to ask
Comments and Questions are requested to be
received by Friday, June 5, 2015 to:
Kristin.Calkins@fairfaxcounty.gov
Summary and Next Steps
• Public meeting to present preferred alternative
o Tentatively mid-July
• Final Recommendations and Report
• Plan amendment to integrate preferred alternative
into the Comprehensive Plan
34
Project Timeline
Task No. Description
0
Finalize Scope
Consultant Selection
Contracting/Issue NTP
1
Establish Existing Conditions
Kick off meeting
Public/Stakeholder Meeting
Summary Document on Existing Conditions
2
Develop MOEs
Preliminary Concepts
Public/Stakeholder Meeting
Finalize Concepts
Summary Document on Alternatives
3
Preliminary Assessment of Alternatives
Final Assessment of Alternatives
Public/Stakeholder Meeting
Summary Document on Alternatis Analysis
4
Chapter 1 (draft)
Chapter 2 (draft)
Chapter 3 (draft)
Chapter 4 (draft)
Chapter 5 (draft)
Technical Appendices
Final Report & Project Files
Deliverables Meetings Working Time
December January February March April May June July
December 2014 - July 2015
October November
Existing Conditions
Develop Alternatives & MOEs
Alternatives Analysis
Documentation
Scoping
We are here
35

Hunter Mill Road and Sunset Hills Road Study

  • 1.
    Hunter Mill Roadand Sunset Hills Road Study Community Meeting #3 Analysis Findings May 20, 2015
  • 2.
    Presentation Agenda • Introductions •Project Objectives • Summary of Prior Community Involvement • Build Alternatives • Future Traffic Analysis • Questions and Answers • Next Steps 2
  • 3.
    Introductions • County Staff •Consultant Team (RK&K) 3
  • 4.
    Project Objectives • Addressexisting congestion • Plan for future traffic • Address queuing along Hunter Mill Road and Sunset Hills Road • Improve access to the Dulles Toll Road by minimizing congestion • Maintain Hunter Mill Road’s character by applying context sensitive solutions 4
  • 5.
    Project Background • Boardof Supervisors requested study • “No Build” includes proffered improvements from the Oakcrest School rezoning • Two meetings held thus far: o December 8, 2014: Kick-Off o February 24, 2015: Existing & No-Build conditions and community input on alternatives 5
  • 6.
  • 7.
    Project Study Area 7 IntersectionID Intersection Intersection Control Type 1 Hunter Mill Road at Sunrise Valley Drive Signalized 2 Hunter Mill Road at DTR EB Ramps Signalized 3 Hunter Mill Road at DTR WB Ramps Signalized 4 Hunter Mill Road at Sunset Hills Road Signalized 5 Hunter Mill Road at Crowell Road Unsignalized (All-Way Stop) 6 Hunter Mill Road at Hunting Crest Lane Unsignalized (Two-Way Stop) 7 Hunter Mill Road at Lake Fairfax Park Unsignalized (Two-Way Stop) 7 6 5 4 3 2 1
  • 8.
    Summary of CommunityComments • Do not want traffic from Wiehle Avenue diverted to Hunter Mill Road • Concerns that the signal at Crowell Road may increase delays in the off-peak • Roundabouts should be seriously examined as an alternative for the corridor • Keep Hunter Mill Road’s character the same • Concern that improvements may attract more traffic 8
  • 9.
    9 Response to CommunityQuestions • Will these improvements attract vehicles to Hunter Mill Road? o Trips will divert from Hunter Mill Road and use Crowell. The improvement will not add new trips to the road network, but divert local trips. • Can more lanes be accommodated under the existing Toll Road Structures? o More lanes cannot feasibly be accommodated under the DTR. The piers for the Dulles Access Road are load bearing and would need to be replaced. Replacement of just the two bridges would be near $40 million, not including the cost of improving Hunter Mill Road.
  • 10.
    10 Response to CommunityQuestions • Will a signal at Crowell Road and Hunter Mill Road increase delays in the off peak? o An actuated signal can be used in the off peak to minimize the delays of vehicles on Crowell Road. • Why not consider moving the ramps of the Dulles Toll Road? o Prior to modifying the ramp termini of the Dulles Toll Road all viable and workable alternatives need to be tested to see if they work. Changing the Toll Road intersections is a last step measure to improve the corridor as it would require a federal review and a much more time consuming process.
  • 11.
    11 Community Input onAlternatives • Test an all Roundabout Solution • Test extending the right turn lane on southbound Hunter Mill Road before the intersection of Sunrise Valley Drive • See if additional lanes can be added underneath the Dulles Toll Road • Test a realigned Sunset Hills Road • To a mid point between the current location and Crowell Road • To Crowell Road
  • 12.
    Future Conditions -Geometry • Hunter Mill Road Minor Arterial (Type B) o 1 Lane in each direction (north of Sunset Hills Road) o 2 Lanes Northbound, 1 Lane Southbound (south of Dulles Toll Road) o 35 miles per hour speed limit • Sunrise Valley Drive o Minor Arterial (Type B) o 1 Lane in each direction (East of Hunter Mill Road) o 2 Lanes in each direction (West of Hunter Mill Road) o 35 miles per hour speed limit 12
  • 13.
    Future Conditions -Geometry 13 • Sunset Hills Road o Minor Arterial (Type B) o 2 Lanes in each direction o 35 miles per hour speed limit • Crowell Road o Minor Arterial (Type B) o 1 Lane in each direction o 35 miles per hour speed limit
  • 14.
    Alternatives Developed 14 Crowell Road SunsetHills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 1A Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 1B
  • 15.
    Alternatives Developed 15 Crowell Road SunsetHills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR No-Build Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 2 Crowell Road Sunset Hills Road Sunrise Valley Drive HunterMillRoad WB DTR EB DTR Alt. 3
  • 16.
    16 Alternative 1A Intersection Type SunriseValley Drive Roundabout Eastbound Dulles Toll Road Roundabout Westbound Dulles Toll Road & Sunset Hills Road Roundabout Crowell Road Roundabout
  • 17.
    Alternative 1A 17 Sunrise ValleyDrive DTR EB Off/On Ramps
  • 18.
    Alternative 1A (Cont.) 18 DTRWB off/On Ramps Crowell Road/Relocated Sunset Hills Rd
  • 19.
    19 Alternative 1B Intersection Type SunriseValley Drive Roundabout Eastbound Dulles Toll Road Roundabout Westbound Dulles Toll Road Roundabout Sunset Hills Road Realigned to Crowell Road Roundabout
  • 20.
    Alternative 1B 20 Sunrise ValleyDrive DTR EB Off/On Ramps
  • 21.
    Alternative 1B (Cont.) 21 DTRWB off/On Ramps Crowell Road/Relocated Sunset Hills Rd
  • 22.
    22 Alternative 2 Intersection Type SunriseValley Drive Signalized Eastbound Dulles Toll Road Signalized Westbound Dulles Toll Road Signalized Sunset Hills Road – moved north Signalized Crowell Road Signalized
  • 23.
    Alternative 2 23 Sunrise ValleyDrive DTR EB Off/On Ramps
  • 24.
    Alternative 2 (Cont.) 24 DTRWB off/On Ramps & Relocated Sunset Hills Crowell Road
  • 25.
    25 Alternative 3 Intersection Type SunriseValley Drive Signalized Eastbound Dulles Toll Road Signalized Westbound Dulles Toll Road Signalized Sunset Hills Road Realigned to Crowell Road Signalized
  • 26.
    Alternative 3 26 Sunrise ValleyDrive DTR EB Off/On Ramps
  • 27.
    Alternative 3 (Cont.) 27 DTRWB off/On Ramps Crowell Road/Relocated Sunset Hills Rd Need new graphic
  • 28.
    AM 2030 Comparison 28 IntersectionApproach AM Peak Hour No Build Alternative 1A Alternative 1B Alternative 2 Alternative 3 Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Hunter Mill Road at Sunrise Valley Drive SB 24.2 C 8.2 A 8.2 A 23.0 C 23.2 C EB 46.8 D 13.5 B 13.5 B 46.7 D 43.3 D WB 44.0 D 17.4 B 17.4 B 41.8 D 41.5 D Overall 38.1 D 13.2 B 13.2 B 36.9 D 35.9 D Hunter Mill Road at Dulles Toll Road EB Ramps NB 20.5 C 16.9 B 16.9 B 16.2 B 16.4 B SB 19.8 B 4.8 A 4.8 A 17.1 B 16.4 B EB 74.8 E 11.8 B 11.8 B 59.6 E 55.7 E Overall 30.6 C 12.3 B 12.3 B 18.7 B 18.4 B Hunter Mill Road at Dulles Toll Road WB Ramps NB 27.3 C - - 5.3 A 4.7 A 6.5 A SB 3.5 A - - 14.6 B 3.9 A 6.9 A WB 62.4 E - - 15.9 B 47.8 D 42.8 D Overall 29.8 C - - 11.0 B 15.4 B 15.9 B Hunter Mill Road at Dulles Toll Road WB Ramps at Sunset Hills Road NB - - 14.9 B - - - - - - SB - - 535.0 F - - - - - - WB - - 21.8 C - - - - - - SEB - - 13.3 B - - - - - - Overall - - 174.7 F - - - - - - Hunter Mill Road at Sunset Hills Road* NB 31.5 C - - - - 32.5 C - - SB 31.2 C - - - - 36.1 D - - EB 84.4 F - - - - 56.0 E - - Overall 41.1 D - - - - 38.0 D - - Hunter Mill Road at Crowell Road** NB 13.2 B 20.0 B - - 19.0 B - - SB 21.1 C 64.1 E - - 19.5 B - - WB 42.1 D 12.4 B - - 49.5 D Overall 24.7 C 29.0 C - - 29.2 C - - Hunter Mill Road at Crowell Road / Sunset Hills Road NB - - - - 13.1 B - - 30.9 C SB - - - - 338.7 F - - 70.8 E EB - - - - 9.8 A - - 42.9 D WB - - - - 19.2 B - - 44.8 D Overall - - - - 70.9 E - - 43.8 D * Alt 2 in new location ** No Build includes the proffered signal at Crowell Road
  • 29.
    PM 2030 Comparison 29 IntersectionApproach PM Peak Hour No Build Alternative 1A Alternative 1B Alternative 2 Alternative 3 Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Hunter Mill Road at Sunrise Valley Drive SB 38.7 D 8.3 A 8.3 A 34.1 C 32.7 C EB 64.6 E 177.3 F 177.3 F 54.1 D 56.4 E WB 34.3 C 8.2 A 8.2 A 38.0 D 34.6 C Overall 48.8 D 77.4 E 77.4 E 43.1 D 42.8 D Hunter Mill Road at Dulles Toll Road EB Ramps NB 16.9 B 13.1 B 13.1 B 18.1 B 17.9 B SB 19.5 B 4.8 A 4.8 A 11.8 B 11.4 B EB 65.1 E 16.4 B 16.4 B 56.5 E 49.6 D Overall 25.9 C 10.0 A 10.0 A 17.0 B 16.4 B Hunter Mill Road at Dulles Toll Road WB Ramps NB 97.4 F - - 6.4 A 29.3 C 20.6 C SB 21.3 C - - 178.0 F 30.7 C 38.6 D WB 105.2 F - - 15.9 B 51.3 D 48.9 D Overall 73.1 E - - 68.6 E 36.0 D 34.9 C Hunter Mill Road at Dulles Toll Road WB Ramps at Sunset Hills Road NB - - 10.3 B - - - - - - SB - - 220.3 F - - - - - - WB - - 22.5 C - - - - - - SEB - - 106.6 F - - - - - - Overall - - 80.4 F - - - - - - Hunter Mill Road at Sunset Hills Road* NB 14.6 B - - - - 24.5 C - - SB 59.4 E - - - - 2.8 A - - EB 93.3 F - - - - 49.5 D - - Overall 53.4 D - - - - 27.2 C - - Hunter Mill Road at Crowell Road** NB 14.9 B 6.1 A - - 12.4 B - - SB 19.6 B 9.9 A - - 20.4 C - - WB 40.9 D 11.2 B - - 49.5 D - - Overall 26.1 C 8.6 A - - 28.1 C - - Hunter Mill Road at Crowell Road / Sunset Hills Road NB - - - - 9.4 A - - 33.9 C SB - - - - 10.8 B - - 26.7 C EB - - - - 10.2 B - - 36.7 D WB - - - - 11.5 B - - 34.5 C Overall - - - - 10.4 B - - 30.0 C * Alt 2 in new location ** No Build includes the proffered signal at Crowell Road
  • 30.
    30 Findings/Conclusions • Signalized Alternativesperforms best at Hunter Mill Road and Sunrise Valley Drive • All alternatives approximately same at DTR eastbound ramps • Alternative 1A (roundabout with DTR Ramp and Sunset Hills Road) performs the worst at DTR westbound ramps
  • 31.
    31 Findings/Conclusions (Cont’d) • Thesignalized alternatives perform best at DTR westbound ramps • Sunset Hills Road operates best when realigned to the north • Corridor likely not “One Size Fits All” – Mix and match of alternatives might be solution
  • 32.
    32 Alternative Comparison WB DTR Ramps& Sunset Hills Crowell Road ROW Alternative 2 Alternative 3 Sunrise Valley Drive EB DTR Ramps WB DTR Ramps & Sunset Hills Crowell Road Sunrise Valley Drive EB DTR Ramps WB DTR Ramps & Sunset Hills Crowell Road Sunrise Valley Drive EB DTR Ramps WB DTR Ramps & Sunset Hills Crowell Road Sunrise Valley Drive EB DTR Ramps Alternative 1A Alternative 1B COST LOS Alternative 1A Alternative 1B Alternative 2 Alternative 3 ROW Cost LOS Better Average Worse
  • 33.
    33 Questions • 30 Minutes •Please limit yourself to one question so others have an opportunity to ask Comments and Questions are requested to be received by Friday, June 5, 2015 to: Kristin.Calkins@fairfaxcounty.gov
  • 34.
    Summary and NextSteps • Public meeting to present preferred alternative o Tentatively mid-July • Final Recommendations and Report • Plan amendment to integrate preferred alternative into the Comprehensive Plan 34
  • 35.
    Project Timeline Task No.Description 0 Finalize Scope Consultant Selection Contracting/Issue NTP 1 Establish Existing Conditions Kick off meeting Public/Stakeholder Meeting Summary Document on Existing Conditions 2 Develop MOEs Preliminary Concepts Public/Stakeholder Meeting Finalize Concepts Summary Document on Alternatives 3 Preliminary Assessment of Alternatives Final Assessment of Alternatives Public/Stakeholder Meeting Summary Document on Alternatis Analysis 4 Chapter 1 (draft) Chapter 2 (draft) Chapter 3 (draft) Chapter 4 (draft) Chapter 5 (draft) Technical Appendices Final Report & Project Files Deliverables Meetings Working Time December January February March April May June July December 2014 - July 2015 October November Existing Conditions Develop Alternatives & MOEs Alternatives Analysis Documentation Scoping We are here 35