Georgetown Pike Walkway Phase IV

  1. 1. Georgetown Pike Walkway Phase IV Citizen Information Meeting October 4, 2017, 7PM to 9PM Great Falls Library (Formal Presentation Starts at 7:30) 1
  2. 2. Project Team Ms. Brook Khorashadi, P.E., Section Chief, Transportation Design Division Mr. John Dresser, Project Manager, Transportation Design Division Mr. Doug Miller, Environmental Specialist Mr. Chris Wells, Bike/Ped Manager ___________________________________________________________ Supervisor John Foust, Dranesville District Supervisor ___________________________________________________________ 2
  3. 3. Tonight’s Agenda • Phase IV – Presentation followed by Q&A • Return to display boards, one-on-one discussion, individual questions • Meeting Ends – 9:00PM 3
  4. 4. Tonight’s Meeting: • Provide an overview of Phase IV project design • Provide an update on current Phase IV project activities, current status, and schedule • Solicit comments regarding the proposed design Tonight we will answer questions, but please submit all comments in writing to enable them to be part of the public record. 4
  5. 5. Phase IV - Seneca Road to Falls Bridge Lane 5
  6. 6. • Project Background: • Locally Funded project • Public walkway will meet VDOT & County design standards and will comply with Americans with Disabilities Act (ADA). • Facility will be maintained by Fairfax County 6
  7. 7. 7 Design Features: • 1200’ - 6’ wide asphalt walkway along roadway behind drainage ditch • Provides pedestrian connectivity from an existing walkway at Seneca Square to Falls Bridge Lane • Design alignment attempts to minimize tree loss and utility conflict
  8. 8. 8 Typical Section:
  9. 9. Phase IV: Design (1 of 3) 9
  10. 10. Phase IV: Design (2 of 3) 10
  11. 11. Phase IV: Design (3 of 3) 11
  12. 12. 12 Project Schedule • Citizens Information Meeting – 10/4/17 • Pre-Final Plans submittal – Early Spring, 2018 • Right of Way Acquisition – Fall, 2018 to Late Spring, 2019 • Utility Relocations – Summer/Late Fall 2019 • Construction – Spring, 2020 through Summer, 2020
  13. 13. 13 Questions about Phase IV? Reminder: Please submit all comments in writing by October 27 in order for them to be considered in final design.
  14. 14. Citizen Input 14 Ways to Comment • Fill out & submit a comment sheet tonight (Comment Box Provided) • Comment section on project website: http://www.fairfaxcounty.gov/fcdot/pedestrian/georgetownpiketrail.htm • Email John Dresser: john.dresser@fairfaxcounty.gov • Fill out and mail a comment sheet: John Dresser Fairfax County Dept. of Transportation 4050 Legato Road, Suite 400 Fairfax, VA 22033 Submit written comments by October 27, 2017
  15. 15. Georgetown Pike Walkway Phase IV Thank you! 15

×