Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Flatlick Branch - Phase 1 Stream Restoration

1,944 views

Published on

Flatlick Branch - Phase 1 Stream Restoration

Published in: News & Politics
  • It's genuinely changed my life. I have been sleeping in the spare room for 4 months - and let's just say my sex life had become pretty boring! My wife and I were becoming strangers living in the same house. Thanks to your strategies, I am now back in our bed and the closeness and intimacy have returned. Thank you so much for taking the time to put all this together. It has genuinely changed my life. ➤➤ https://bit.ly/37PhtTN
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • According to Stanford Medical, It's really the ONLY reason this country's woman live 10 years longer and weigh on average 42 pounds lighter than us. ?? (And by the way, it has NOTHING to do with genetics or some secret-exercise and EVERYTHING to do with "how" they eat.) BTW, I said "HOW", not "what"... ?? >> to see if this short quiz can help you unlock your true weight loss potential ■■■ http://t.cn/AiYhcpeJ
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Slim Down in Just 1 Minute? What if I told you, you've been lied to for nearly all of your life? CLICK HERE TO SEE THE TRUTH ★★★ https://tinyurl.com/1minweight
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

Flatlick Branch - Phase 1 Stream Restoration

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Flatlick Branch – Phase I Stream Restoration January 6, 2017 Contract No. CN13125088 Project No. SD-000031-010 Sully District
  2. 2. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  3. 3. Project Details The Flatlick Branch – Phase I Stream Restoration project was substantially completed on December 8, 2016. The project involved the restoration of over 1,850 LF of the Flatlick Branch stream and associated tributaries in the Cub Run Watershed, and retrofitting an existing stormwater management basin into a Level II constructed wetland. Project Overview: • Provide stream improvements to this stream as well as two connecting tributaries • Upgrade an existing stormwater detention pond from a dry pond to a Level II constructed wetland • Remove and replace a failed fair weather stream crossing identified on the countywide trail plan • Replace a section of 24-inch diameter sanitary sewer main • Through a partnership with the Fairfax County Park Authority, the trail system within the stream valley park was enhanced to an asphalt trail • Invasive species treatment for the site and installing 11,000 native plants Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Benefits: • Pollutant Removal Credit provided towards meeting the Chesapeake Bay Total Maximum Daily Load (TMDL). • Phosphorus removal – 140 lbs / year • Nitrogen removal – 1,140 lbs / year • Suspended solids – 34 tons/year Project Team: • Stormwater Planning Division – Fred Wilkins • Stormwater Planning Division – Chris Ruck • Fairfax County Park Authority – Ryan Stewart • Wastewater Collection Division – Shwan Fatah • Utilities Design and Construction Division (UDCD) - Jay Horstman • Project Inspector, UDCD – Bharat Khanal
  4. 4. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Project Area 50 Lee Jackson Memorial Highway Flatlick Branch Chantilly, VA, Tax Map No. 44-2 Sully District
  5. 5. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Construction
  6. 6. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Sewer Main Replacement
  7. 7. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Fair Weather Stream Crossing
  8. 8. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Fair Weather Stream Crossing
  9. 9. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Level II Constructed Wetland - Construction
  10. 10. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Level II Constructed Wetland
  11. 11. Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Asphalt Trail
  12. 12. Before After Flatlick Branch - Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
  13. 13. Additional Information For additional Information, please call www.fairfaxcounty.gov/dpwes Flatlick Branch – Phase I Stream Restoration Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Irene Haske, Public Information Officer 703-324-5821, TTY 711 SWPDmail@fairfaxcounty.gov

×