SlideShare a Scribd company logo
1 of 41
Download to read offline
DATE
REV
Board Information List
Board category Board version Quantity
DC power distribution UNIT NIL NIL
TP 48200B NIL NIL
TP48200A NIL NIL
RRU L1800 RRU 3959 NIL 3
RRU 2600 RRU 3262 NIL 3
RRU U900 NIL NIL NIL
RRU U2100 NIL NIL NIL
RRU G900 NIL NIL NIL
RRU G1800 N/A NIL NIL
EASY RET
2.0
N/A EASY RET 1.0 3
RCU
N/A
NIL NIL
2G 790- 960 MHz NIL NIL
3G 790- 960 MHz NIL NIL
4G 790- 960 MHz NIL NIL
2G 1710- 2170 MHz NIL NIL
3G 1710- 2170 MHz NIL NIL
4G 1710- 2170 MHz NIL NIL
2G (824-960/1710-2180MHz ) NIL NIL
3G (824-960/1710-2180MHz ) NIL NIL
4G (824-960/1710-2180MHz ) NIL NIL
2G 1710-2690/ 1710-2690MHz) NIL NIL
3G 1710-2690/ 1710-2690MHz) NIL NIL
4G 1710-2690/ 1710-2690MHz) NIL NIL
2G (824-960/824-960MHz) NIL NIL
3G (824-960/824-960MHz) NIL NIL
4G (824-960/824-960MHz) NIL NIL
2G (824-960/824-960MHz) NIL NIL
3G (824-960/824-960MHz) NIL NIL
4G (824-960/824-960MHz) NIL NIL
Board name
ANTENNA
DUALBAND
LOW LOW
NIL
NIL
NIL
ANTENNA
DUALBAND
HIGH HIGH
NIL
NIL
NIL
ANTENNA
TRIBAND LOW
HIGH HIGH
NIL
NIL
NIL
ANTENNA
SINGLEBAND
HIGH
NIL
NIL
NIL
ANTENNA
DUALBAND
LOW HIGH
NIL
NIL
NIL
RET MODULE
NIL
NIL
ANTENNA
SINGLEBAND
LOW
NIL
NIL
NIL
NIL
RECTIFIER OUTDOOR NIL
RRU
NIL
NIL
NIL
NIL
NIL
NIL
Board serial NO.
DCDU NIL
RECTIFIER INDOOR
BOARD INFORMATION LIST
SITE NAME NIBONG TEBAL 30-Nov-16
LOCATION ID P00128 1
DATE
REV
BOARD INFORMATION LIST
SITE NAME NIBONG TEBAL 30-Nov-16
LOCATION ID P00128 1
2G
(1710-2170/ 1710- 2690/ 2490-
2690MHz)
NIL NIL
3G
(1710-2170/ 1710- 2690/ 2490-
2690MHz)
NIL NIL
4G
(1710-2170/ 1710- 2690/ 2490-
2690MHz)
NIL NIL
2G
2x(690 - 960) and 2x(1710 -
2690
NIL NIL
3G
2x(690 - 960) and 2x(1710 -
2691
NIL NIL
4G
2x(690 - 960) and 2x(1710 -
2692
NIL NIL
2G 4x(1710 - 2690) PENTABAND APE4517R0 3
3G 4x(1710 - 2690) PENTABAND APE4517R0 3
4G 4x(1710 - 2690) PENTABAND APE4517R0 3
2G
1x(690 - 960) and4x(1710 -
2690)
NIL N/A
3G
1x(690 - 960) and4x(1710 -
2690)
NIL N/A
4G
1x(690 - 960) and4x(1710 -
2690)
NIL N/A
2G 5x(1710 - 2690) NIL N/A
3G 5x(1710 - 2690) NIL N/A
4G 5x(1710 - 2690) NIL N/A
ANTENNA
TRIBAND HIGH
HIGH HIGH
NIL
NIL
NIL
ANTENNA
QUADBAND
LOW HIGH
HIGH HIGH
NIL
NIL
NIL
ANTENNA
QUADBAND
HIGH HIGH
HIGH HIGH
NIL
NIL
NIL
ANTENNA
PENTABAND
LOW HIGH
HIGH HIGH
HIGH
NIL
NIL
NIL
ANTENNA
PENTABAND
HIGH HIGH
HIGH HIGH
HIGH
NIL
NIL
NIL
DATE
REV
General Introduction
NODE B NAME :
ADDRESS
:
PROJECT TYPE : CELCOM HAMMER - BAU MOD
NODE B TYPE : DBS 3900
EQUIPMENT TYPE : DBS3900 +TP48200B
DIVERSITY MODE : XXXXX-POLAR
COORDINATE SCALE N 5.155262
E 100.470839
Antenna System
Before After Before After Before After
Antenna Type
SINGLEBAND
(L)
PENTABAND
(LHHHH)
SINGLEBAND
(L)
PENTABAND
(LHHHH)
SINGLEBAND
(L)
PENTABAND
(LHHHH)
Model LDX-6515DS-VTM APE 4517R0 LDX-6515DS-VTM APE 4517R0 LDX-6515DS-VTM APE 4517R0
Numbers of Antennas 1 1 1 1 1 1
Antenna gain (dBi) 16.7dBi-17.1dBi 16dBi-18dBi 16.7dBi-17.1dBi 16dBi-18dBi 16.7dBi-17.1dBi 16dBi-18dBi
Antenna polarization mode 45 45 45 45 45 45
Antenna semi-wave angle N/A N/A N/A N/A N/A N/A
Azimuth 0° 40° 160° 150° 250° 300°
Antenna weight (kg) 15 36.5 15 36.5 15 36.5
Antenna height 57 57 57 57 57 57
TMA presented or not N/A N/A N/A N/A N/A N/A
Feeder type CPRI CPRI CPRI CPRI CPRI CPRI
Length of a single feeder 70 70 70 70 70 70
E-Tilt 1 2 1 2 0 3
M-Tilt 2 2 0 2 4 2
TMA N/A N/A N/A N/A N/A N/A
Corollary Equipment
Power supply(V) : -48V DC
Battery capacity(Ah) : 100Ah
Transmission mode : FE
No. of FE : 1
Transmission Vendor : HUAWEI
No. of Battery Bank : 2
DC power supply : 31.9A
User Information
Person in charge Celcom : Celcom Office : Fadli
Telephone : 0194748900
Email :
Participants of the project
Survey personnel : Shable Telephone : 0175496029
Email :
Design personnel : Telephone :
Email :
PROJECT DESCRIPTION (2G)
SITE NAME
LOCATION ID P00128
NIBONG TEBAL
SECTOR 3
NIBONG TEBAL 30-Nov-16
1
LOT 23GM 129 MUKIM 11 DAERAH SEBARANG PERAI SELATAN PULAU PINANG
SECTOR 1 SECTOR 2
DATE
REV
PROJECT DESCRIPTION (2G)
SITE NAME
LOCATION ID P00128
NIBONG TEBAL 30-Nov-16
1
Node B Cell parameter and data configuration
Before After Before After Before After
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
Intra Neighboring Cell (Carrier 1)
Neighboring Cell 1 (3G) : N/A
Neighboring Cell 1 (4G) : N/A
Neighboring Cell 2 (3G) : N/A
Neighboring Cell 2 (4G) : N/A
Neighboring Cell 3 (3G) : N/A
Neighboring Cell 3 (4G) : N/A
Intra Neighboring Cell (Carrier 2)
Neighboring Cell 1 (3G) : N/A
Neighboring Cell 1 (4G) : N/A
Neighboring Cell 2 (3G) : N/A
Neighboring Cell 2 (4G) : N/A
Neighboring Cell 3 (3G) : N/A
Neighboring Cell 3 (4G) : N/A
NodeB Data Configuration Info
Version No. : N/A
Local IP Address : N/A
CELL 2 CELL 3
CPICH (dBm)
CELL INFORMATION
Primary scrambling code
Time offset
UL Frequency
DL Frequency
LAC
SAC
RAC
URA
CELL 1
Max Transmit Power
Cell ID
Cell Name
SITE NAME DATE
LOCATION ID REV
General Introduction
NODE B NAME :
ADDRESS
:
PROJECT TYPE : CELCOM HAMMER - BAU MOD
NODE B TYPE : DBS 3900
EQUIPMENT TYPE : DBS3900 +TP48200B
DIVERSITY MODE : XXXXX-POLAR
COORDINATE SCALE N 5.155262
E 100.470839
Antenna System
Before After Before After Before After
Antenna Type
TRIBAND
(L/H/H)
PENTABAND
(LHHHH)
TRIBAND
(L/H/H)
PENTABAND
(LHHHH)
TRIBAND
(L/H/H)
PENTABAND
(LHHHH)
Model ATR451606 APE 4517R0 ATR451606 APE 4517R0 ATR451606 APE 4517R0
Numbers of Antennas 1 1 1 1 1 1
Antenna gain (dBi) 15.6dBi-18.2dBi 16dBi-18dBi 15.6dBi-18.2dBi 16dBi-18dBi 15.6dBi-18.2dBi 16dBi-18dBi
Antenna polarization mode 45 45 45 45 45 45
Antenna semi-wave angle N/A N/A N/A N/A N/A N/A
Azimuth 10° 40° 160° 150° 260° 300°
Antenna weight (kg) 24.5 36.5 24.5 36.5 24.5 36.5
Antenna height 54 57 54 57 54 57
TMA presented or not N/A N/A N/A N/A N/A N/A
Feeder type 7/8" 7/8" 7/8" 7/8" 7/8" 7/8"
Length of a single feeder 60 60 60 60 60 60
E-Tilt 0 2 0 2 0 2
M-Tilt 4 0 4 0 4 0
TMA N/A N/A N/A N/A N/A N/A
Corollary Equipment
Power supply(V) : -48V DC
Battery capacity(Ah) : 100Ah
Transmission mode : FE
No. of FE : 1
Transmission Vendor : HUAWEI
No. of Battery Bank : 2
DC power supply : 31.9A
User Information
Person in charge Celcom : Celcom Office : Fadli
Telephone : 0194748900
Email :
Participants of the project
Survey personnel : Shable Telephone : 0175496029
Email :
Design personnel : Telephone :
Email :
30-Nov-16
1
NIBONG TEBAL
P00128
PROJECT DESCRIPTION (3G)
NIBONG TEBAL
LOT 23GM 129 MUKIM 11 DAERAH SEBARANG PERAI SELATAN PULAU PINANG
SECTOR 1 SECTOR 2 SECTOR 3
SITE NAME DATE
LOCATION ID REV
30-Nov-16
1
NIBONG TEBAL
P00128
PROJECT DESCRIPTION (3G)
Node B Cell parameter and data configuration
Before After Before After Before After
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
Intra Neighboring Cell (Carrier 1)
Neighboring Cell 1 (2G) : N/A
Neighboring Cell 1 (4G) : N/A
Neighboring Cell 2 (2G) : N/A
Neighboring Cell 2 (4G) : N/A
Neighboring Cell 3 (2G) : N/A
Neighboring Cell 3 (4G) : N/A
Intra Neighboring Cell (Carrier 2)
Neighboring Cell 1 (2G) : N/A
Neighboring Cell 1 (4G) : N/A
Neighboring Cell 2 (2G) : N/A
Neighboring Cell 2 (4G) : N/A
Neighboring Cell 3 (2G) : N/A
Neighboring Cell 3 (4G) : N/A
NodeB Data Configuration Info
Version No. : N/A
Local IP Address : N/A
CELL INFORMATION
CELL 1 CELL 2 CELL 3
Cell Name
Cell ID
Max Transmit Power
Primary scrambling code
Time offset
UL Frequency
DL Frequency
LAC
SAC
RAC
URA
CPICH (dBm)
DATE
REV
General Introduction
NODE B NAME :
ADDRESS
:
PROJECT TYPE : CELCOM HAMMER - BAU MOD
NODE B TYPE : DBS 3900
EQUIPMENT TYPE : DBS3900 +TP48200B
DIVERSITY MODE : XXXXX-POLAR
COORDINATE SCALE N 5.155262
E 100.470839
Antenna System
Before After Before After Before After
Antenna Type
TRIBAND
(L/H/H)
PENTABAND
(LHHHH)
TRIBAND
(L/H/H)
PENTABAND
(LHHHH)
TRIBAND
(L/H/H)
PENTABAND
(LHHHH)
Model ATR451606 APE 4517R0 ATR451606 APE 4517R0 ATR451606 APE 4517R0
Numbers of Antennas 1 1 1 1 1 1
Antenna gain (dBi) 15.6dBi-18.2dBi 16dBi-18dBi 15.6dBi-18.2dBi 16dBi-18dBi 15.6dBi-18.2dBi 16dBi-18dBi
Antenna polarization mode 45 45 45 45 45 45
Antenna semi-wave angle N/A N/A N/A N/A N/A N/A
Azimuth 10° 40° 160° 150° 260° 300°
Antenna weight (kg) 24.5 36.5 24.5 36.5 24.5 36.5
Antenna height 54 57 54 57 54 57
TMA presented or not N/A N/A N/A N/A N/A N/A
Feeder type CPRI CPRI CPRI CPRI CPRI CPRI
Length of a single feeder 70 70 70 70 70 70
E-Tilt 0 2 0 3 0 3
M-Tilt 4 0 4 0 4 0
TMA N/A N/A N/A
Corollary Equipment
Power supply(V) : -48V DC
Battery capacity(Ah) : 100Ah
Transmission mode : FE
No. of FE : 1
Transmission Vendor : HUAWEI
No. of Battery Bank : 2
DC power supply : 31.9A
User Information
Person in charge Celcom : Celcom Office : Fadli
Telephone : 0194748900
Email :
Participants of the project
Survey personnel : Shable Telephone : 0175496029
Email :
Design personnel : Telephone :
Email :
PROJECT DESCRIPTION (4G)
NIBONG TEBAL
LOT 23GM 129 MUKIM 11 DAERAH SEBARANG PERAI SELATAN PULAU PINANG
SECTOR 1 SECTOR 2 SECTOR 3
SITE NAME NIBONG TEBAL 30-Nov-16
LOCATION ID P00128 1
DATE
REV
PROJECT DESCRIPTION (4G)
SITE NAME NIBONG TEBAL 30-Nov-16
LOCATION ID P00128 1
Node B Cell parameter and data configuration
Before After Before After Before After
N/A NL30200_8_1 N/A NL30200_8_2 N/A NL30200_8_3
N/A 11 N/A 12 N/A 13
N/A 20W N/A 20W N/A 20W
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A 19650 N/A 19650 N/A 19650
N/A 1650 N/A 1650 N/A 1650
N/A 3073 N/A 3073 N/A 3073
N/A 322 N/A 322 N/A 322
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
Intra Neighboring Cell (Carrier 1)
Neighboring Cell 1 (3G) : N/A
Neighboring Cell 1 (2G) : N/A
Neighboring Cell 2 (3G) : N/A
Neighboring Cell 2 (2G) : N/A
Neighboring Cell 3 (3G) : N/A
Neighboring Cell 3 (2G) : N/A
Intra Neighboring Cell (Carrier 2)
Neighboring Cell 1 (3G) : N/A
Neighboring Cell 1 (2G) : N/A
Neighboring Cell 2 (3G) : N/A
Neighboring Cell 2 (2G) : N/A
Neighboring Cell 3 (3G) : N/A
Neighboring Cell 3 (2G) : N/A
NodeB Data Configuration Info
Version No. : N/A
Local IP Address : N/A
CELL INFORMATION
CELL 1 CELL 2 CELL 3
Cell Name
Cell ID
Max Transmit Power
Primary scrambling code
Time offset
UL Frequency
DL Frequency
LAC
SAC
RAC
URA
CPICH (dBm)
NIBONG TEBAL VERSION 1
SITE PICTURE
RF ATP DOCUMENT (SITE PICTURE)
SITE ID P00128 DATE 30-Nov-16
SITE NAME
VERSION 1
ANTENNA INSTALLED
RF ATP DOCUMENT (ANTENNA INSTALLED)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL
VERSION 1
RF ATP DOCUMENT (ANTENNA INSTALLED)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL
*** Whichever is applicable, if not, just remark N/A.
*** Information is only applicable for existing system that involve in antenna swapping
ANTENNA INSTALLED
SYSTEM
S1
S2
S3
S1
S2
S3
4G (L1800)
4G (L2600)
3G (U900)
3G (U2100)
2G (G900)
2G (G1800)
S3
S1
S2
S3
S1
SECTOR NO.
S1
S2
S3
S1
S2
S3
BEFORE AFTER
AGISSON ATR451606 AGISSON APE 4517R0
AGISSON ATR451606 AGISSON APE 4517R0
AGISSON ATR451606
S2
AGISSON APE 4517R0
N/A AGISSON APE 4517R0
N/A AGISSON APE 4517R0
N/A AGISSON APE 4517R0
N/A N/A
N/A N/A
N/A N/A
AGISSON ATR451606 AGISSON APE 4517R0
AGISSON ATR451606 AGISSON APE 4517R0
AGISSON ATR451606 AGISSON APE 4517R0
ANDREW LDX-6515DS-VTM AGISSON APE 4517R0
ANDREW LDX-6515DS-VTM AGISSON APE 4517R0
ANDREW LDX-6515DS-VTM AGISSON APE 4517R0
N/A N/A
N/A N/A
N/A N/A
VERSION 1
RF ATP DOCUMENT (ANTENNA INSTALLED)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL
Y/N Y/NSYSTEMS
L1800
AFTERBEFORE
Y N/A
N/A
Y
YL2600
U900 N/A
Y N/A
N/A
G1800
ANTENNA INSTALLED (SECTOR 1)
Y
U2100
G900
Y
N/A Y
N/A
VERSION 1
RF ATP DOCUMENT (ANTENNA INSTALLED)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL
Y/N Y/N
G1800 N/A
ANTENNA INSTALLED (SECTOR 2)
U2100 Y N/A Y
G900 Y N/A Y
L1800 Y N/A Y
N/A
L2600 N/A Y
U900
AFTER
N/A
SYSTEMS BEFORE
VERSION 1
RF ATP DOCUMENT (ANTENNA INSTALLED)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL
Y/N Y/N
U900 N/A
L1800 N/A Y
N/A
L2600 N/A Y
SYSTEMS BEFORE AFTER
Y N/A Y
Y
G1800 N/A
ANTENNA INSTALLED (SECTOR 3)
U2100 Y N/A Y
G900
RF ATP DOCUMENT (ANTENNA AZIMUTH)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
ANTENNA AZIMUTH
RF ATP DOCUMENT (ANTENNA AZIMUTH)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
*** Whichever is applicable, if not, just remark N/A.
*** Information is only applicable for existing system that involve in antenna swapping
ANTENNA AZIMUTH
SYSTEM SECTOR NO BEFORE (degree °) AFTER (degree °)
260° 300°
N/A 300°
4G
(L1800)
S1 10° 40°
S2 160° 150°
S3
N/A N/A
4G
(L2600)
S1 N/A 40°
S2 N/A 150°
S3
260° 300°
3G
(U900)
S1 N/A N/A
S2 N/A N/A
S3
250° 300°
3G
(U2100)
S1 10° 40°
S2 160° 150°
S3
N/A N/A
2G
(G900)
S1 0° 40°
S2 160° 150°
S3
2G
(G1800)
S1 N/A N/A
S2 N/A N/A
S3
RF ATP DOCUMENT (ANTENNA AZIMUTH)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
ANTENNA AZIMUTH - (SECTOR 1)
N/A
BEFORE ( 10 degree °)
N/A
AFTER ( 40 degree °)
RF ATP DOCUMENT (ANTENNA AZIMUTH)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
BEFORE ( 160 degree °)
N/A
N/A
AFTER ( 150 degree °)
ANTENNA AZIMUTH - (SECTOR 2)
RF ATP DOCUMENT (ANTENNA AZIMUTH)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
N/A
AFTER ( 300 degree °)
ANTENNA AZIMUTH - (SECTOR 3)
N/A
BEFORE ( 260 degree °)
ANTENNA E-TILT
RF ATP DOCUMENT (E-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
RF ATP DOCUMENT (E-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
*** Whichever is applicable, if not, just remark N/A.
*** Information is only applicable for existing system that involve in antenna swapping
2G
(G1800)
S1 N/A N/A
S2 N/A N/A
S3 N/A N/A
2G
(G900)
S1 1 2
S2 1 2
S3 0 3
3G
(U2100)
S1 0 2
S2 0 2
S3 0 2
3G
(U900)
S1 N/A N/A
S2 N/A N/A
S3 N/A N/A
4G
(L2600)
S1 N/A 2
S2 N/A 2
S3 N/A 2
4G
(L1800)
S1 0 2
S2 0 3
S3 0 3
ANTENNA E-TILT
SYSTEM SECTOR NO BEFORE AFTER
RF ATP DOCUMENT (E-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
Y/N
Y 0
VALUE
G1800
ANTENNA E-TILT (SECTOR 1) - BEFORE
N/A
U2100 N/A
G900
Y 0
Y 1 N/A
L2600 N/A
U900 N/A
SYSTEM BEFORE
L1800 N/A
RF ATP DOCUMENT (E-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
Y/N
ANTENNA E-TILT (SECTOR 1) - AFTER
N/A
Y 2 N/A
VALUE AFTER
Y 2 N/A
Y 2 N/A
G900 Y 2 N/A
G1800 N/A
L1800
L2600
U900
U2100
SYSTEM
RF ATP DOCUMENT (E-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
Y/N
ANTENNA E-TILT (SECTOR 2) - BEFORE
0 N/A
L2600
N/A
N/A
SYSTEM VALUE BEFORE
L1800 0 N/A
G1800 N/A
U900 N/A
G900 1
U2100
RF ATP DOCUMENT (E-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
Y/N
ANTENNA E-TILT (SECTOR 2) - AFTER
2 N/A
G1800 N/A
L2600 2 N/A
U900 N/A
SYSTEM VALUE AFTER
L1800 3 N/A
U2100 2 N/A
G900
RF ATP DOCUMENT (E-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
Y/N
N/A
ANTENNA E-TILT (SECTOR 3) - BEFORE
U900 N/A
U2100 Y 0 N/A
SYSTEM VALUE BEFORE
L1800 Y 0 N/A
G1800
G900 Y 0 N/A
L2600 N/A
RF ATP DOCUMENT (E-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
Y/N
G1800 N/A
ANTENNA E-TILT (SECTOR 3) - AFTER
U2100 Y 2 N/A
G900 Y 3 N/A
L2600 Y 2 N/A
U900 N/A
SYSTEM VALUE AFTER
L1800 Y 3 N/A
RF ATP DOCUMENT (M-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
ANTENNA M-TILT
RF ATP DOCUMENT (M-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
*** Whichever is applicable, if not, just remark N/A.
*** Information is only applicable for existing system that involve in antenna swapping
0
0
0
0
N/A
0
0
0
0
N/A N/A
2
0
4
N/A
N/A
N/A
0
N/A
N/A
N/A
4
4
4
4
4
N/A
N/A
N/A
N/A
N/A
N/A
0
0
ANTENNA M-TILT
SYSTEM SECTOR NO
04
BEFORE AFTER
4G
(L1800)
S1
S2
S3
4G
(L2600)
S1
S2
S3
3G
(U900)
S1
S2
S3
3G
(U2100)
S1
S2
S3
2G
(G900)
S1
S2
S3
2G
(G1800)
S1
S2
S3
RF ATP DOCUMENT (M-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
ANTENNA M-TILT (SECTOR 1) - BEFORE
PHOTO
L1800 4
SYSTEM
M-TILT
CONFIGURATION
U900
2
G1800
U2100 4
G900
N/A
N/A
N/A
N/A
L2600
N/A
N/A
RF ATP DOCUMENT (M-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
ANTENNA M-TILT (SECTOR 1) - AFTER
0
M-TILT
CONFIGURATION
PHOTO
L1800
N/A
L2600 0
U2100 0
G1800
G900 0
SYSTEM
U900
RF ATP DOCUMENT (M-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
PHOTO
L1800 4 N/A
L2600 N/A
U900 N/A
SYSTEM
M-TILT
CONFIGURATION
U2100 4 N/A
G900 0 N/A
G1800 N/A
ANTENNA M-TILT (SECTOR 2) - BEFORE
RF ATP DOCUMENT (M-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
SYSTEM
M-TILT
CONFIGURATION
PHOTO
L1800 0
N/A
L2600 0
U900
U2100 0
G900 0
G1800
ANTENNA M-TILT (SECTOR 2) - AFTER
RF ATP DOCUMENT (M-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
SYSTEM
M-TILT
CONFIGURATION
PHOTO
L1800 4 N/A
L2600 N/A
U900 N/A
U2100 4 N/A
G900 4 N/A
G1800 N/A
ANTENNA M-TILT (SECTOR 3) - BEFORE
RF ATP DOCUMENT (M-TILT)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
SYSTEM
M-TILT
CONFIGURATION
PHOTO
L1800 0
N/A
L2600 0
U900
ANTENNA M-TILT (SECTOR 3) - AFTER
U2100 0
G900 0
G1800
SPEED TEST
RF ATP DOCUMENT (SPEED TEST)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
RF ATP DOCUMENT (SPEED TEST)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
*** Whichever is applicable, if not, just remark N/A.
*** Information is only applicable for existing system that involve in antenna swapping
SPEED TEST
System Sector No.
4G (L2600)
S1
S2
S3
4G (L1800)
S1
S2
S3
3G (U2100)
S1
S2
S3
3G (U900)
S1
S2
S3
N
N
N
N
N
N
N
N
Y
Y
Y
N
RF ATP DOCUMENT (SPEED TEST)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
INFORMATION SPEED TEST - LTE 2600
SECTOR 1
SECTOR 2
RF ATP DOCUMENT (SPEED TEST)
SITE ID P00128 DATE 30-Nov-16
SITE NAME NIBONG TEBAL VERSION 1
SECTOR 3
INFORMATION SPEED TEST - LTE 2600
SITE NAME: SITE ID:
Operation ID:1
BTS Time: BTS Mode: BTS Version: Local IP:
1.Antenna Check ResultVSWR threshold: 1.3
No. Test Cases Result Remark
1 VSWR
2.VSWR Detail
Result
N/A
√ Normal ! Warning Error ? Unknow
Passed
Failed
Site Deficiency Report completed
Sig: For Operator
Sig: For Huawei
Sig: For Subcontractor
Date:
ANTENNA CHECK (VSWR)
VSWR:The VSWR test is being performed.
Cabinet No. Subrack No. Branch
P00128NIBONG TEBAL
Slot No.
Board Information List Upgrade

More Related Content

What's hot

Intelligent road roller
Intelligent road rollerIntelligent road roller
Intelligent road rollerManav Mittal
 
RACO Verbation Alarm Monitoring System Schematic
RACO Verbation Alarm Monitoring System SchematicRACO Verbation Alarm Monitoring System Schematic
RACO Verbation Alarm Monitoring System SchematicMiller Energy, Inc.
 
Kannad 406 as
Kannad 406 asKannad 406 as
Kannad 406 asgelbyson
 
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100Passion Radio Amateur
 
Advanced motion controls dq111se15a40ldc
Advanced motion controls dq111se15a40ldcAdvanced motion controls dq111se15a40ldc
Advanced motion controls dq111se15a40ldcElectromate
 
taon-tf-analogue-compact-headend-with-dvb-t-input
taon-tf-analogue-compact-headend-with-dvb-t-inputtaon-tf-analogue-compact-headend-with-dvb-t-input
taon-tf-analogue-compact-headend-with-dvb-t-inputPrzemek Ostrowski
 
Advanced motion controls dq111se15a40nac
Advanced motion controls dq111se15a40nacAdvanced motion controls dq111se15a40nac
Advanced motion controls dq111se15a40nacElectromate
 
Original PNP Transistor 2SA684L 2SA684 TO-92 New UNISONIC
Original PNP Transistor 2SA684L 2SA684 TO-92 New UNISONICOriginal PNP Transistor 2SA684L 2SA684 TO-92 New UNISONIC
Original PNP Transistor 2SA684L 2SA684 TO-92 New UNISONICAUTHELECTRONIC
 
Advanced motion controls dq111se30a40nac
Advanced motion controls dq111se30a40nacAdvanced motion controls dq111se30a40nac
Advanced motion controls dq111se30a40nacElectromate
 
Datasheet 74 ls90
Datasheet 74 ls90Datasheet 74 ls90
Datasheet 74 ls90everest_vls
 
スパイス・パークのアップデートリスト(2013年7月度)
スパイス・パークのアップデートリスト(2013年7月度)スパイス・パークのアップデートリスト(2013年7月度)
スパイス・パークのアップデートリスト(2013年7月度)spicepark
 
Etl andrew bond_sspi_maio_2015
Etl andrew bond_sspi_maio_2015Etl andrew bond_sspi_maio_2015
Etl andrew bond_sspi_maio_2015SSPI Brasil
 
Advanced motion controls dq111se25a20nac
Advanced motion controls dq111se25a20nacAdvanced motion controls dq111se25a20nac
Advanced motion controls dq111se25a20nacElectromate
 
Introduction to pll
Introduction to pllIntroduction to pll
Introduction to pllsartaj ahmed
 

What's hot (20)

Intelligent road roller
Intelligent road rollerIntelligent road roller
Intelligent road roller
 
RACO Verbation Alarm Monitoring System Schematic
RACO Verbation Alarm Monitoring System SchematicRACO Verbation Alarm Monitoring System Schematic
RACO Verbation Alarm Monitoring System Schematic
 
abc song
abc songabc song
abc song
 
PHASE LOCK LOOPs
PHASE LOCK LOOPsPHASE LOCK LOOPs
PHASE LOCK LOOPs
 
Kannad 406 as
Kannad 406 asKannad 406 as
Kannad 406 as
 
ADC & DAC
ADC & DACADC & DAC
ADC & DAC
 
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
Es'hail2 1er satellite radioamateur géostationnaire QATAR OSCAR-100
 
Advanced motion controls dq111se15a40ldc
Advanced motion controls dq111se15a40ldcAdvanced motion controls dq111se15a40ldc
Advanced motion controls dq111se15a40ldc
 
MIL-STD-461G - CE
MIL-STD-461G - CEMIL-STD-461G - CE
MIL-STD-461G - CE
 
taon-tf-analogue-compact-headend-with-dvb-t-input
taon-tf-analogue-compact-headend-with-dvb-t-inputtaon-tf-analogue-compact-headend-with-dvb-t-input
taon-tf-analogue-compact-headend-with-dvb-t-input
 
Advanced motion controls dq111se15a40nac
Advanced motion controls dq111se15a40nacAdvanced motion controls dq111se15a40nac
Advanced motion controls dq111se15a40nac
 
Original PNP Transistor 2SA684L 2SA684 TO-92 New UNISONIC
Original PNP Transistor 2SA684L 2SA684 TO-92 New UNISONICOriginal PNP Transistor 2SA684L 2SA684 TO-92 New UNISONIC
Original PNP Transistor 2SA684L 2SA684 TO-92 New UNISONIC
 
Advanced motion controls dq111se30a40nac
Advanced motion controls dq111se30a40nacAdvanced motion controls dq111se30a40nac
Advanced motion controls dq111se30a40nac
 
Datasheet 74 ls90
Datasheet 74 ls90Datasheet 74 ls90
Datasheet 74 ls90
 
スパイス・パークのアップデートリスト(2013年7月度)
スパイス・パークのアップデートリスト(2013年7月度)スパイス・パークのアップデートリスト(2013年7月度)
スパイス・パークのアップデートリスト(2013年7月度)
 
Etl andrew bond_sspi_maio_2015
Etl andrew bond_sspi_maio_2015Etl andrew bond_sspi_maio_2015
Etl andrew bond_sspi_maio_2015
 
Advanced motion controls dq111se25a20nac
Advanced motion controls dq111se25a20nacAdvanced motion controls dq111se25a20nac
Advanced motion controls dq111se25a20nac
 
Datasheet
DatasheetDatasheet
Datasheet
 
DPLL PRESENTATION
DPLL PRESENTATIONDPLL PRESENTATION
DPLL PRESENTATION
 
Introduction to pll
Introduction to pllIntroduction to pll
Introduction to pll
 

Viewers also liked

Before the Open March 8 2017
Before the Open March 8 2017Before the Open March 8 2017
Before the Open March 8 2017John Pendrith
 
Marketmanagement
MarketmanagementMarketmanagement
MarketmanagementUk Footoz
 
Solid Carbide Thread Mills
Solid Carbide Thread MillsSolid Carbide Thread Mills
Solid Carbide Thread MillsErwin Marpaung
 
Herramientas especiales de google chrome
Herramientas especiales de google chromeHerramientas especiales de google chrome
Herramientas especiales de google chromeyoshy27mon
 
Présentation générale de Micom au PAC 2010
Présentation générale de Micom au PAC 2010Présentation générale de Micom au PAC 2010
Présentation générale de Micom au PAC 2010Michel Comtois
 
Motorola Cell Phone Accessories
Motorola Cell Phone AccessoriesMotorola Cell Phone Accessories
Motorola Cell Phone AccessoriesESource Parts
 
SNIA - Les comptes rendus 03 décembre 2016 ; 12 janvier 2017, 13 janvier 2017
SNIA - Les comptes rendus 03 décembre 2016 ; 12 janvier 2017, 13 janvier 2017SNIA - Les comptes rendus 03 décembre 2016 ; 12 janvier 2017, 13 janvier 2017
SNIA - Les comptes rendus 03 décembre 2016 ; 12 janvier 2017, 13 janvier 2017Réseau Pro Santé
 
The missing women of wikpedia
The missing women of wikpediaThe missing women of wikpedia
The missing women of wikpediaSharon Flynn
 
Presentación1 miguel
Presentación1 miguelPresentación1 miguel
Presentación1 miguelMiguelvazque
 
La desmotivación escolar
La desmotivación escolarLa desmotivación escolar
La desmotivación escolarxhyvve
 
Виртуальный музей, как инновационная форма организации гражданско-патриотичес...
Виртуальный музей, как инновационная форма организации гражданско-патриотичес...Виртуальный музей, как инновационная форма организации гражданско-патриотичес...
Виртуальный музей, как инновационная форма организации гражданско-патриотичес...Serghei Epifantsew
 
Correg rcp desde mi cole larga-bl
Correg rcp desde mi cole larga-blCorreg rcp desde mi cole larga-bl
Correg rcp desde mi cole larga-blcralecinena2015
 
Holiday Readiness: Best Practices for Successful Holiday Readiness Testing
Holiday Readiness: Best Practices for Successful Holiday Readiness TestingHoliday Readiness: Best Practices for Successful Holiday Readiness Testing
Holiday Readiness: Best Practices for Successful Holiday Readiness TestingApica
 

Viewers also liked (15)

Before the Open March 8 2017
Before the Open March 8 2017Before the Open March 8 2017
Before the Open March 8 2017
 
Marketmanagement
MarketmanagementMarketmanagement
Marketmanagement
 
Solid Carbide Thread Mills
Solid Carbide Thread MillsSolid Carbide Thread Mills
Solid Carbide Thread Mills
 
Redes
RedesRedes
Redes
 
Herramientas especiales de google chrome
Herramientas especiales de google chromeHerramientas especiales de google chrome
Herramientas especiales de google chrome
 
Présentation générale de Micom au PAC 2010
Présentation générale de Micom au PAC 2010Présentation générale de Micom au PAC 2010
Présentation générale de Micom au PAC 2010
 
Motorola Cell Phone Accessories
Motorola Cell Phone AccessoriesMotorola Cell Phone Accessories
Motorola Cell Phone Accessories
 
SNIA - Les comptes rendus 03 décembre 2016 ; 12 janvier 2017, 13 janvier 2017
SNIA - Les comptes rendus 03 décembre 2016 ; 12 janvier 2017, 13 janvier 2017SNIA - Les comptes rendus 03 décembre 2016 ; 12 janvier 2017, 13 janvier 2017
SNIA - Les comptes rendus 03 décembre 2016 ; 12 janvier 2017, 13 janvier 2017
 
Viknesh
VikneshViknesh
Viknesh
 
The missing women of wikpedia
The missing women of wikpediaThe missing women of wikpedia
The missing women of wikpedia
 
Presentación1 miguel
Presentación1 miguelPresentación1 miguel
Presentación1 miguel
 
La desmotivación escolar
La desmotivación escolarLa desmotivación escolar
La desmotivación escolar
 
Виртуальный музей, как инновационная форма организации гражданско-патриотичес...
Виртуальный музей, как инновационная форма организации гражданско-патриотичес...Виртуальный музей, как инновационная форма организации гражданско-патриотичес...
Виртуальный музей, как инновационная форма организации гражданско-патриотичес...
 
Correg rcp desde mi cole larga-bl
Correg rcp desde mi cole larga-blCorreg rcp desde mi cole larga-bl
Correg rcp desde mi cole larga-bl
 
Holiday Readiness: Best Practices for Successful Holiday Readiness Testing
Holiday Readiness: Best Practices for Successful Holiday Readiness TestingHoliday Readiness: Best Practices for Successful Holiday Readiness Testing
Holiday Readiness: Best Practices for Successful Holiday Readiness Testing
 

Similar to Board Information List Upgrade

IBS TRAINING(new).pptx
IBS TRAINING(new).pptxIBS TRAINING(new).pptx
IBS TRAINING(new).pptxHussienEndris1
 
Huawei umts node b configuration principle
Huawei umts node b configuration principleHuawei umts node b configuration principle
Huawei umts node b configuration principleYaser Al-Abdali
 
Huaweiumtsnodebconfigurationprinciple 161222082051
Huaweiumtsnodebconfigurationprinciple 161222082051Huaweiumtsnodebconfigurationprinciple 161222082051
Huaweiumtsnodebconfigurationprinciple 161222082051moussaCoulibaly22
 
qsfp-40g-sr4-optical-transceiver-module-121001.pdf
qsfp-40g-sr4-optical-transceiver-module-121001.pdfqsfp-40g-sr4-optical-transceiver-module-121001.pdf
qsfp-40g-sr4-optical-transceiver-module-121001.pdfGLsun Mall
 
QSFP-40G-SR4-T02#121001.doc
QSFP-40G-SR4-T02#121001.docQSFP-40G-SR4-T02#121001.doc
QSFP-40G-SR4-T02#121001.docGLsun Mall
 
Advanced motion controls_azbdc10a4ic
Advanced motion controls_azbdc10a4icAdvanced motion controls_azbdc10a4ic
Advanced motion controls_azbdc10a4icElectromate
 
PowerMate15 Technical Specification
PowerMate15 Technical SpecificationPowerMate15 Technical Specification
PowerMate15 Technical SpecificationRimsky Cheng
 
Advanced motion controls_azb10a4ic
Advanced motion controls_azb10a4icAdvanced motion controls_azb10a4ic
Advanced motion controls_azb10a4icElectromate
 
Original Opto EL817 EL817C EL 817 SOP-4 New
Original Opto EL817 EL817C EL 817 SOP-4 NewOriginal Opto EL817 EL817C EL 817 SOP-4 New
Original Opto EL817 EL817C EL 817 SOP-4 NewAUTHELECTRONIC
 
I phone 5 full Schematic Diagram 820 3141-b
I phone 5 full Schematic Diagram 820 3141-bI phone 5 full Schematic Diagram 820 3141-b
I phone 5 full Schematic Diagram 820 3141-bdiyfix phone
 
VIPA SLIO Introduction
VIPA SLIO IntroductionVIPA SLIO Introduction
VIPA SLIO IntroductionJimmy Hsu
 
Cataloge ge 3.control and_automation-27_vat300_e_c7_rev_c
Cataloge ge 3.control and_automation-27_vat300_e_c7_rev_cCataloge ge 3.control and_automation-27_vat300_e_c7_rev_c
Cataloge ge 3.control and_automation-27_vat300_e_c7_rev_cThuan Kieu
 
494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdfmehdiberenji
 
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...Allen He
 
QSFP28-100G-SR4-T01#111001.pdf
QSFP28-100G-SR4-T01#111001.pdfQSFP28-100G-SR4-T01#111001.pdf
QSFP28-100G-SR4-T01#111001.pdfGLsun Mall
 
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdfqsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdfGLsun Mall
 
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdfqsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdfGLsun Mall
 

Similar to Board Information List Upgrade (20)

IBS TRAINING(new).pptx
IBS TRAINING(new).pptxIBS TRAINING(new).pptx
IBS TRAINING(new).pptx
 
baseband-6648.pdf
baseband-6648.pdfbaseband-6648.pdf
baseband-6648.pdf
 
Huawei umts node b configuration principle
Huawei umts node b configuration principleHuawei umts node b configuration principle
Huawei umts node b configuration principle
 
Huaweiumtsnodebconfigurationprinciple 161222082051
Huaweiumtsnodebconfigurationprinciple 161222082051Huaweiumtsnodebconfigurationprinciple 161222082051
Huaweiumtsnodebconfigurationprinciple 161222082051
 
qsfp-40g-sr4-optical-transceiver-module-121001.pdf
qsfp-40g-sr4-optical-transceiver-module-121001.pdfqsfp-40g-sr4-optical-transceiver-module-121001.pdf
qsfp-40g-sr4-optical-transceiver-module-121001.pdf
 
QSFP-40G-SR4-T02#121001.doc
QSFP-40G-SR4-T02#121001.docQSFP-40G-SR4-T02#121001.doc
QSFP-40G-SR4-T02#121001.doc
 
Cn51 configuração
Cn51 configuraçãoCn51 configuração
Cn51 configuração
 
Advanced motion controls_azbdc10a4ic
Advanced motion controls_azbdc10a4icAdvanced motion controls_azbdc10a4ic
Advanced motion controls_azbdc10a4ic
 
PowerMate15 Technical Specification
PowerMate15 Technical SpecificationPowerMate15 Technical Specification
PowerMate15 Technical Specification
 
Advanced motion controls_azb10a4ic
Advanced motion controls_azb10a4icAdvanced motion controls_azb10a4ic
Advanced motion controls_azb10a4ic
 
Original Opto EL817 EL817C EL 817 SOP-4 New
Original Opto EL817 EL817C EL 817 SOP-4 NewOriginal Opto EL817 EL817C EL 817 SOP-4 New
Original Opto EL817 EL817C EL 817 SOP-4 New
 
I phone 5 full Schematic Diagram 820 3141-b
I phone 5 full Schematic Diagram 820 3141-bI phone 5 full Schematic Diagram 820 3141-b
I phone 5 full Schematic Diagram 820 3141-b
 
VIPA SLIO Introduction
VIPA SLIO IntroductionVIPA SLIO Introduction
VIPA SLIO Introduction
 
Cataloge ge 3.control and_automation-27_vat300_e_c7_rev_c
Cataloge ge 3.control and_automation-27_vat300_e_c7_rev_cCataloge ge 3.control and_automation-27_vat300_e_c7_rev_c
Cataloge ge 3.control and_automation-27_vat300_e_c7_rev_c
 
494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf494197038-Baseband-6648-Commercial-Presentation.pdf
494197038-Baseband-6648-Commercial-Presentation.pdf
 
Sunny tripower 5000 -12000
Sunny tripower 5000 -12000Sunny tripower 5000 -12000
Sunny tripower 5000 -12000
 
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...
 
QSFP28-100G-SR4-T01#111001.pdf
QSFP28-100G-SR4-T01#111001.pdfQSFP28-100G-SR4-T01#111001.pdf
QSFP28-100G-SR4-T01#111001.pdf
 
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdfqsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
 
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdfqsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
 

Recently uploaded

National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 

Recently uploaded (20)

National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 

Board Information List Upgrade

  • 1. DATE REV Board Information List Board category Board version Quantity DC power distribution UNIT NIL NIL TP 48200B NIL NIL TP48200A NIL NIL RRU L1800 RRU 3959 NIL 3 RRU 2600 RRU 3262 NIL 3 RRU U900 NIL NIL NIL RRU U2100 NIL NIL NIL RRU G900 NIL NIL NIL RRU G1800 N/A NIL NIL EASY RET 2.0 N/A EASY RET 1.0 3 RCU N/A NIL NIL 2G 790- 960 MHz NIL NIL 3G 790- 960 MHz NIL NIL 4G 790- 960 MHz NIL NIL 2G 1710- 2170 MHz NIL NIL 3G 1710- 2170 MHz NIL NIL 4G 1710- 2170 MHz NIL NIL 2G (824-960/1710-2180MHz ) NIL NIL 3G (824-960/1710-2180MHz ) NIL NIL 4G (824-960/1710-2180MHz ) NIL NIL 2G 1710-2690/ 1710-2690MHz) NIL NIL 3G 1710-2690/ 1710-2690MHz) NIL NIL 4G 1710-2690/ 1710-2690MHz) NIL NIL 2G (824-960/824-960MHz) NIL NIL 3G (824-960/824-960MHz) NIL NIL 4G (824-960/824-960MHz) NIL NIL 2G (824-960/824-960MHz) NIL NIL 3G (824-960/824-960MHz) NIL NIL 4G (824-960/824-960MHz) NIL NIL Board name ANTENNA DUALBAND LOW LOW NIL NIL NIL ANTENNA DUALBAND HIGH HIGH NIL NIL NIL ANTENNA TRIBAND LOW HIGH HIGH NIL NIL NIL ANTENNA SINGLEBAND HIGH NIL NIL NIL ANTENNA DUALBAND LOW HIGH NIL NIL NIL RET MODULE NIL NIL ANTENNA SINGLEBAND LOW NIL NIL NIL NIL RECTIFIER OUTDOOR NIL RRU NIL NIL NIL NIL NIL NIL Board serial NO. DCDU NIL RECTIFIER INDOOR BOARD INFORMATION LIST SITE NAME NIBONG TEBAL 30-Nov-16 LOCATION ID P00128 1
  • 2. DATE REV BOARD INFORMATION LIST SITE NAME NIBONG TEBAL 30-Nov-16 LOCATION ID P00128 1 2G (1710-2170/ 1710- 2690/ 2490- 2690MHz) NIL NIL 3G (1710-2170/ 1710- 2690/ 2490- 2690MHz) NIL NIL 4G (1710-2170/ 1710- 2690/ 2490- 2690MHz) NIL NIL 2G 2x(690 - 960) and 2x(1710 - 2690 NIL NIL 3G 2x(690 - 960) and 2x(1710 - 2691 NIL NIL 4G 2x(690 - 960) and 2x(1710 - 2692 NIL NIL 2G 4x(1710 - 2690) PENTABAND APE4517R0 3 3G 4x(1710 - 2690) PENTABAND APE4517R0 3 4G 4x(1710 - 2690) PENTABAND APE4517R0 3 2G 1x(690 - 960) and4x(1710 - 2690) NIL N/A 3G 1x(690 - 960) and4x(1710 - 2690) NIL N/A 4G 1x(690 - 960) and4x(1710 - 2690) NIL N/A 2G 5x(1710 - 2690) NIL N/A 3G 5x(1710 - 2690) NIL N/A 4G 5x(1710 - 2690) NIL N/A ANTENNA TRIBAND HIGH HIGH HIGH NIL NIL NIL ANTENNA QUADBAND LOW HIGH HIGH HIGH NIL NIL NIL ANTENNA QUADBAND HIGH HIGH HIGH HIGH NIL NIL NIL ANTENNA PENTABAND LOW HIGH HIGH HIGH HIGH NIL NIL NIL ANTENNA PENTABAND HIGH HIGH HIGH HIGH HIGH NIL NIL NIL
  • 3. DATE REV General Introduction NODE B NAME : ADDRESS : PROJECT TYPE : CELCOM HAMMER - BAU MOD NODE B TYPE : DBS 3900 EQUIPMENT TYPE : DBS3900 +TP48200B DIVERSITY MODE : XXXXX-POLAR COORDINATE SCALE N 5.155262 E 100.470839 Antenna System Before After Before After Before After Antenna Type SINGLEBAND (L) PENTABAND (LHHHH) SINGLEBAND (L) PENTABAND (LHHHH) SINGLEBAND (L) PENTABAND (LHHHH) Model LDX-6515DS-VTM APE 4517R0 LDX-6515DS-VTM APE 4517R0 LDX-6515DS-VTM APE 4517R0 Numbers of Antennas 1 1 1 1 1 1 Antenna gain (dBi) 16.7dBi-17.1dBi 16dBi-18dBi 16.7dBi-17.1dBi 16dBi-18dBi 16.7dBi-17.1dBi 16dBi-18dBi Antenna polarization mode 45 45 45 45 45 45 Antenna semi-wave angle N/A N/A N/A N/A N/A N/A Azimuth 0° 40° 160° 150° 250° 300° Antenna weight (kg) 15 36.5 15 36.5 15 36.5 Antenna height 57 57 57 57 57 57 TMA presented or not N/A N/A N/A N/A N/A N/A Feeder type CPRI CPRI CPRI CPRI CPRI CPRI Length of a single feeder 70 70 70 70 70 70 E-Tilt 1 2 1 2 0 3 M-Tilt 2 2 0 2 4 2 TMA N/A N/A N/A N/A N/A N/A Corollary Equipment Power supply(V) : -48V DC Battery capacity(Ah) : 100Ah Transmission mode : FE No. of FE : 1 Transmission Vendor : HUAWEI No. of Battery Bank : 2 DC power supply : 31.9A User Information Person in charge Celcom : Celcom Office : Fadli Telephone : 0194748900 Email : Participants of the project Survey personnel : Shable Telephone : 0175496029 Email : Design personnel : Telephone : Email : PROJECT DESCRIPTION (2G) SITE NAME LOCATION ID P00128 NIBONG TEBAL SECTOR 3 NIBONG TEBAL 30-Nov-16 1 LOT 23GM 129 MUKIM 11 DAERAH SEBARANG PERAI SELATAN PULAU PINANG SECTOR 1 SECTOR 2
  • 4. DATE REV PROJECT DESCRIPTION (2G) SITE NAME LOCATION ID P00128 NIBONG TEBAL 30-Nov-16 1 Node B Cell parameter and data configuration Before After Before After Before After N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Intra Neighboring Cell (Carrier 1) Neighboring Cell 1 (3G) : N/A Neighboring Cell 1 (4G) : N/A Neighboring Cell 2 (3G) : N/A Neighboring Cell 2 (4G) : N/A Neighboring Cell 3 (3G) : N/A Neighboring Cell 3 (4G) : N/A Intra Neighboring Cell (Carrier 2) Neighboring Cell 1 (3G) : N/A Neighboring Cell 1 (4G) : N/A Neighboring Cell 2 (3G) : N/A Neighboring Cell 2 (4G) : N/A Neighboring Cell 3 (3G) : N/A Neighboring Cell 3 (4G) : N/A NodeB Data Configuration Info Version No. : N/A Local IP Address : N/A CELL 2 CELL 3 CPICH (dBm) CELL INFORMATION Primary scrambling code Time offset UL Frequency DL Frequency LAC SAC RAC URA CELL 1 Max Transmit Power Cell ID Cell Name
  • 5. SITE NAME DATE LOCATION ID REV General Introduction NODE B NAME : ADDRESS : PROJECT TYPE : CELCOM HAMMER - BAU MOD NODE B TYPE : DBS 3900 EQUIPMENT TYPE : DBS3900 +TP48200B DIVERSITY MODE : XXXXX-POLAR COORDINATE SCALE N 5.155262 E 100.470839 Antenna System Before After Before After Before After Antenna Type TRIBAND (L/H/H) PENTABAND (LHHHH) TRIBAND (L/H/H) PENTABAND (LHHHH) TRIBAND (L/H/H) PENTABAND (LHHHH) Model ATR451606 APE 4517R0 ATR451606 APE 4517R0 ATR451606 APE 4517R0 Numbers of Antennas 1 1 1 1 1 1 Antenna gain (dBi) 15.6dBi-18.2dBi 16dBi-18dBi 15.6dBi-18.2dBi 16dBi-18dBi 15.6dBi-18.2dBi 16dBi-18dBi Antenna polarization mode 45 45 45 45 45 45 Antenna semi-wave angle N/A N/A N/A N/A N/A N/A Azimuth 10° 40° 160° 150° 260° 300° Antenna weight (kg) 24.5 36.5 24.5 36.5 24.5 36.5 Antenna height 54 57 54 57 54 57 TMA presented or not N/A N/A N/A N/A N/A N/A Feeder type 7/8" 7/8" 7/8" 7/8" 7/8" 7/8" Length of a single feeder 60 60 60 60 60 60 E-Tilt 0 2 0 2 0 2 M-Tilt 4 0 4 0 4 0 TMA N/A N/A N/A N/A N/A N/A Corollary Equipment Power supply(V) : -48V DC Battery capacity(Ah) : 100Ah Transmission mode : FE No. of FE : 1 Transmission Vendor : HUAWEI No. of Battery Bank : 2 DC power supply : 31.9A User Information Person in charge Celcom : Celcom Office : Fadli Telephone : 0194748900 Email : Participants of the project Survey personnel : Shable Telephone : 0175496029 Email : Design personnel : Telephone : Email : 30-Nov-16 1 NIBONG TEBAL P00128 PROJECT DESCRIPTION (3G) NIBONG TEBAL LOT 23GM 129 MUKIM 11 DAERAH SEBARANG PERAI SELATAN PULAU PINANG SECTOR 1 SECTOR 2 SECTOR 3
  • 6. SITE NAME DATE LOCATION ID REV 30-Nov-16 1 NIBONG TEBAL P00128 PROJECT DESCRIPTION (3G) Node B Cell parameter and data configuration Before After Before After Before After N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Intra Neighboring Cell (Carrier 1) Neighboring Cell 1 (2G) : N/A Neighboring Cell 1 (4G) : N/A Neighboring Cell 2 (2G) : N/A Neighboring Cell 2 (4G) : N/A Neighboring Cell 3 (2G) : N/A Neighboring Cell 3 (4G) : N/A Intra Neighboring Cell (Carrier 2) Neighboring Cell 1 (2G) : N/A Neighboring Cell 1 (4G) : N/A Neighboring Cell 2 (2G) : N/A Neighboring Cell 2 (4G) : N/A Neighboring Cell 3 (2G) : N/A Neighboring Cell 3 (4G) : N/A NodeB Data Configuration Info Version No. : N/A Local IP Address : N/A CELL INFORMATION CELL 1 CELL 2 CELL 3 Cell Name Cell ID Max Transmit Power Primary scrambling code Time offset UL Frequency DL Frequency LAC SAC RAC URA CPICH (dBm)
  • 7. DATE REV General Introduction NODE B NAME : ADDRESS : PROJECT TYPE : CELCOM HAMMER - BAU MOD NODE B TYPE : DBS 3900 EQUIPMENT TYPE : DBS3900 +TP48200B DIVERSITY MODE : XXXXX-POLAR COORDINATE SCALE N 5.155262 E 100.470839 Antenna System Before After Before After Before After Antenna Type TRIBAND (L/H/H) PENTABAND (LHHHH) TRIBAND (L/H/H) PENTABAND (LHHHH) TRIBAND (L/H/H) PENTABAND (LHHHH) Model ATR451606 APE 4517R0 ATR451606 APE 4517R0 ATR451606 APE 4517R0 Numbers of Antennas 1 1 1 1 1 1 Antenna gain (dBi) 15.6dBi-18.2dBi 16dBi-18dBi 15.6dBi-18.2dBi 16dBi-18dBi 15.6dBi-18.2dBi 16dBi-18dBi Antenna polarization mode 45 45 45 45 45 45 Antenna semi-wave angle N/A N/A N/A N/A N/A N/A Azimuth 10° 40° 160° 150° 260° 300° Antenna weight (kg) 24.5 36.5 24.5 36.5 24.5 36.5 Antenna height 54 57 54 57 54 57 TMA presented or not N/A N/A N/A N/A N/A N/A Feeder type CPRI CPRI CPRI CPRI CPRI CPRI Length of a single feeder 70 70 70 70 70 70 E-Tilt 0 2 0 3 0 3 M-Tilt 4 0 4 0 4 0 TMA N/A N/A N/A Corollary Equipment Power supply(V) : -48V DC Battery capacity(Ah) : 100Ah Transmission mode : FE No. of FE : 1 Transmission Vendor : HUAWEI No. of Battery Bank : 2 DC power supply : 31.9A User Information Person in charge Celcom : Celcom Office : Fadli Telephone : 0194748900 Email : Participants of the project Survey personnel : Shable Telephone : 0175496029 Email : Design personnel : Telephone : Email : PROJECT DESCRIPTION (4G) NIBONG TEBAL LOT 23GM 129 MUKIM 11 DAERAH SEBARANG PERAI SELATAN PULAU PINANG SECTOR 1 SECTOR 2 SECTOR 3 SITE NAME NIBONG TEBAL 30-Nov-16 LOCATION ID P00128 1
  • 8. DATE REV PROJECT DESCRIPTION (4G) SITE NAME NIBONG TEBAL 30-Nov-16 LOCATION ID P00128 1 Node B Cell parameter and data configuration Before After Before After Before After N/A NL30200_8_1 N/A NL30200_8_2 N/A NL30200_8_3 N/A 11 N/A 12 N/A 13 N/A 20W N/A 20W N/A 20W N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 19650 N/A 19650 N/A 19650 N/A 1650 N/A 1650 N/A 1650 N/A 3073 N/A 3073 N/A 3073 N/A 322 N/A 322 N/A 322 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Intra Neighboring Cell (Carrier 1) Neighboring Cell 1 (3G) : N/A Neighboring Cell 1 (2G) : N/A Neighboring Cell 2 (3G) : N/A Neighboring Cell 2 (2G) : N/A Neighboring Cell 3 (3G) : N/A Neighboring Cell 3 (2G) : N/A Intra Neighboring Cell (Carrier 2) Neighboring Cell 1 (3G) : N/A Neighboring Cell 1 (2G) : N/A Neighboring Cell 2 (3G) : N/A Neighboring Cell 2 (2G) : N/A Neighboring Cell 3 (3G) : N/A Neighboring Cell 3 (2G) : N/A NodeB Data Configuration Info Version No. : N/A Local IP Address : N/A CELL INFORMATION CELL 1 CELL 2 CELL 3 Cell Name Cell ID Max Transmit Power Primary scrambling code Time offset UL Frequency DL Frequency LAC SAC RAC URA CPICH (dBm)
  • 9. NIBONG TEBAL VERSION 1 SITE PICTURE RF ATP DOCUMENT (SITE PICTURE) SITE ID P00128 DATE 30-Nov-16 SITE NAME
  • 10. VERSION 1 ANTENNA INSTALLED RF ATP DOCUMENT (ANTENNA INSTALLED) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL
  • 11. VERSION 1 RF ATP DOCUMENT (ANTENNA INSTALLED) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL *** Whichever is applicable, if not, just remark N/A. *** Information is only applicable for existing system that involve in antenna swapping ANTENNA INSTALLED SYSTEM S1 S2 S3 S1 S2 S3 4G (L1800) 4G (L2600) 3G (U900) 3G (U2100) 2G (G900) 2G (G1800) S3 S1 S2 S3 S1 SECTOR NO. S1 S2 S3 S1 S2 S3 BEFORE AFTER AGISSON ATR451606 AGISSON APE 4517R0 AGISSON ATR451606 AGISSON APE 4517R0 AGISSON ATR451606 S2 AGISSON APE 4517R0 N/A AGISSON APE 4517R0 N/A AGISSON APE 4517R0 N/A AGISSON APE 4517R0 N/A N/A N/A N/A N/A N/A AGISSON ATR451606 AGISSON APE 4517R0 AGISSON ATR451606 AGISSON APE 4517R0 AGISSON ATR451606 AGISSON APE 4517R0 ANDREW LDX-6515DS-VTM AGISSON APE 4517R0 ANDREW LDX-6515DS-VTM AGISSON APE 4517R0 ANDREW LDX-6515DS-VTM AGISSON APE 4517R0 N/A N/A N/A N/A N/A N/A
  • 12. VERSION 1 RF ATP DOCUMENT (ANTENNA INSTALLED) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL Y/N Y/NSYSTEMS L1800 AFTERBEFORE Y N/A N/A Y YL2600 U900 N/A Y N/A N/A G1800 ANTENNA INSTALLED (SECTOR 1) Y U2100 G900 Y N/A Y N/A
  • 13. VERSION 1 RF ATP DOCUMENT (ANTENNA INSTALLED) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL Y/N Y/N G1800 N/A ANTENNA INSTALLED (SECTOR 2) U2100 Y N/A Y G900 Y N/A Y L1800 Y N/A Y N/A L2600 N/A Y U900 AFTER N/A SYSTEMS BEFORE
  • 14. VERSION 1 RF ATP DOCUMENT (ANTENNA INSTALLED) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL Y/N Y/N U900 N/A L1800 N/A Y N/A L2600 N/A Y SYSTEMS BEFORE AFTER Y N/A Y Y G1800 N/A ANTENNA INSTALLED (SECTOR 3) U2100 Y N/A Y G900
  • 15. RF ATP DOCUMENT (ANTENNA AZIMUTH) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 ANTENNA AZIMUTH
  • 16. RF ATP DOCUMENT (ANTENNA AZIMUTH) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 *** Whichever is applicable, if not, just remark N/A. *** Information is only applicable for existing system that involve in antenna swapping ANTENNA AZIMUTH SYSTEM SECTOR NO BEFORE (degree °) AFTER (degree °) 260° 300° N/A 300° 4G (L1800) S1 10° 40° S2 160° 150° S3 N/A N/A 4G (L2600) S1 N/A 40° S2 N/A 150° S3 260° 300° 3G (U900) S1 N/A N/A S2 N/A N/A S3 250° 300° 3G (U2100) S1 10° 40° S2 160° 150° S3 N/A N/A 2G (G900) S1 0° 40° S2 160° 150° S3 2G (G1800) S1 N/A N/A S2 N/A N/A S3
  • 17. RF ATP DOCUMENT (ANTENNA AZIMUTH) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 ANTENNA AZIMUTH - (SECTOR 1) N/A BEFORE ( 10 degree °) N/A AFTER ( 40 degree °)
  • 18. RF ATP DOCUMENT (ANTENNA AZIMUTH) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 BEFORE ( 160 degree °) N/A N/A AFTER ( 150 degree °) ANTENNA AZIMUTH - (SECTOR 2)
  • 19. RF ATP DOCUMENT (ANTENNA AZIMUTH) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 N/A AFTER ( 300 degree °) ANTENNA AZIMUTH - (SECTOR 3) N/A BEFORE ( 260 degree °)
  • 20. ANTENNA E-TILT RF ATP DOCUMENT (E-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1
  • 21. RF ATP DOCUMENT (E-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 *** Whichever is applicable, if not, just remark N/A. *** Information is only applicable for existing system that involve in antenna swapping 2G (G1800) S1 N/A N/A S2 N/A N/A S3 N/A N/A 2G (G900) S1 1 2 S2 1 2 S3 0 3 3G (U2100) S1 0 2 S2 0 2 S3 0 2 3G (U900) S1 N/A N/A S2 N/A N/A S3 N/A N/A 4G (L2600) S1 N/A 2 S2 N/A 2 S3 N/A 2 4G (L1800) S1 0 2 S2 0 3 S3 0 3 ANTENNA E-TILT SYSTEM SECTOR NO BEFORE AFTER
  • 22. RF ATP DOCUMENT (E-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 Y/N Y 0 VALUE G1800 ANTENNA E-TILT (SECTOR 1) - BEFORE N/A U2100 N/A G900 Y 0 Y 1 N/A L2600 N/A U900 N/A SYSTEM BEFORE L1800 N/A
  • 23. RF ATP DOCUMENT (E-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 Y/N ANTENNA E-TILT (SECTOR 1) - AFTER N/A Y 2 N/A VALUE AFTER Y 2 N/A Y 2 N/A G900 Y 2 N/A G1800 N/A L1800 L2600 U900 U2100 SYSTEM
  • 24. RF ATP DOCUMENT (E-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 Y/N ANTENNA E-TILT (SECTOR 2) - BEFORE 0 N/A L2600 N/A N/A SYSTEM VALUE BEFORE L1800 0 N/A G1800 N/A U900 N/A G900 1 U2100
  • 25. RF ATP DOCUMENT (E-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 Y/N ANTENNA E-TILT (SECTOR 2) - AFTER 2 N/A G1800 N/A L2600 2 N/A U900 N/A SYSTEM VALUE AFTER L1800 3 N/A U2100 2 N/A G900
  • 26. RF ATP DOCUMENT (E-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 Y/N N/A ANTENNA E-TILT (SECTOR 3) - BEFORE U900 N/A U2100 Y 0 N/A SYSTEM VALUE BEFORE L1800 Y 0 N/A G1800 G900 Y 0 N/A L2600 N/A
  • 27. RF ATP DOCUMENT (E-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 Y/N G1800 N/A ANTENNA E-TILT (SECTOR 3) - AFTER U2100 Y 2 N/A G900 Y 3 N/A L2600 Y 2 N/A U900 N/A SYSTEM VALUE AFTER L1800 Y 3 N/A
  • 28. RF ATP DOCUMENT (M-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 ANTENNA M-TILT
  • 29. RF ATP DOCUMENT (M-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 *** Whichever is applicable, if not, just remark N/A. *** Information is only applicable for existing system that involve in antenna swapping 0 0 0 0 N/A 0 0 0 0 N/A N/A 2 0 4 N/A N/A N/A 0 N/A N/A N/A 4 4 4 4 4 N/A N/A N/A N/A N/A N/A 0 0 ANTENNA M-TILT SYSTEM SECTOR NO 04 BEFORE AFTER 4G (L1800) S1 S2 S3 4G (L2600) S1 S2 S3 3G (U900) S1 S2 S3 3G (U2100) S1 S2 S3 2G (G900) S1 S2 S3 2G (G1800) S1 S2 S3
  • 30. RF ATP DOCUMENT (M-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 ANTENNA M-TILT (SECTOR 1) - BEFORE PHOTO L1800 4 SYSTEM M-TILT CONFIGURATION U900 2 G1800 U2100 4 G900 N/A N/A N/A N/A L2600 N/A N/A
  • 31. RF ATP DOCUMENT (M-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 ANTENNA M-TILT (SECTOR 1) - AFTER 0 M-TILT CONFIGURATION PHOTO L1800 N/A L2600 0 U2100 0 G1800 G900 0 SYSTEM U900
  • 32. RF ATP DOCUMENT (M-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 PHOTO L1800 4 N/A L2600 N/A U900 N/A SYSTEM M-TILT CONFIGURATION U2100 4 N/A G900 0 N/A G1800 N/A ANTENNA M-TILT (SECTOR 2) - BEFORE
  • 33. RF ATP DOCUMENT (M-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 SYSTEM M-TILT CONFIGURATION PHOTO L1800 0 N/A L2600 0 U900 U2100 0 G900 0 G1800 ANTENNA M-TILT (SECTOR 2) - AFTER
  • 34. RF ATP DOCUMENT (M-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 SYSTEM M-TILT CONFIGURATION PHOTO L1800 4 N/A L2600 N/A U900 N/A U2100 4 N/A G900 4 N/A G1800 N/A ANTENNA M-TILT (SECTOR 3) - BEFORE
  • 35. RF ATP DOCUMENT (M-TILT) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 SYSTEM M-TILT CONFIGURATION PHOTO L1800 0 N/A L2600 0 U900 ANTENNA M-TILT (SECTOR 3) - AFTER U2100 0 G900 0 G1800
  • 36. SPEED TEST RF ATP DOCUMENT (SPEED TEST) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1
  • 37. RF ATP DOCUMENT (SPEED TEST) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 *** Whichever is applicable, if not, just remark N/A. *** Information is only applicable for existing system that involve in antenna swapping SPEED TEST System Sector No. 4G (L2600) S1 S2 S3 4G (L1800) S1 S2 S3 3G (U2100) S1 S2 S3 3G (U900) S1 S2 S3 N N N N N N N N Y Y Y N
  • 38. RF ATP DOCUMENT (SPEED TEST) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 INFORMATION SPEED TEST - LTE 2600 SECTOR 1 SECTOR 2
  • 39. RF ATP DOCUMENT (SPEED TEST) SITE ID P00128 DATE 30-Nov-16 SITE NAME NIBONG TEBAL VERSION 1 SECTOR 3 INFORMATION SPEED TEST - LTE 2600
  • 40. SITE NAME: SITE ID: Operation ID:1 BTS Time: BTS Mode: BTS Version: Local IP: 1.Antenna Check ResultVSWR threshold: 1.3 No. Test Cases Result Remark 1 VSWR 2.VSWR Detail Result N/A √ Normal ! Warning Error ? Unknow Passed Failed Site Deficiency Report completed Sig: For Operator Sig: For Huawei Sig: For Subcontractor Date: ANTENNA CHECK (VSWR) VSWR:The VSWR test is being performed. Cabinet No. Subrack No. Branch P00128NIBONG TEBAL Slot No.