DRAFT SOLAR PARK FV 5 MW BULGARIAGENERAL INFORMATION                                     final, executive):Project Locatio...
Upcoming SlideShare
Loading in …5
×

2011 pup-n0002-proyecto fv 5 mw bulgaria

532 views

Published on

proyecto de bulgaria

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
532
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

2011 pup-n0002-proyecto fv 5 mw bulgaria

  1. 1. DRAFT SOLAR PARK FV 5 MW BULGARIAGENERAL INFORMATION final, executive):Project Location: BULGARIA Connection costs provided: 100.000€ C.P Region: Novi Pazar CONNECTION County: Surveillance Camera NOPhotovoltaic project with 4,9MWP Delimitation NOpowerRated (KWp) KWP 4900 CITY OR STATEProject Status (Development / LICENSES ALLOW CONVENTIONconstruction built): THE START Royalties: None CONSTRUCTION rent regime IMMEDIATE PLANT Convezioni with council € 29000Price mw project WP € 0.34 OWNERS CONDITIONS Land rent regime NOSITUATION PERMITS Land sales INCLUDEDDIA Date Presentation: SI Planing INSTALLATION D statusIA (accepted / ACCEPTED Immediate IMMEDIATE not accepted) estimatedtion to begin the FEBRUARYAUTHORIZATION ONLY OK installationDate response of the 2010competent authority: OTHERROYAL DECREE excluding Edge Recincionenergy Camara surveillanceRates / premiums 0,379€WP PRIMA /Securityduration 20 YEARSNational Distributor EON COMMENTSPROJECT DETAILSsituation (preliminary, final, EXECUTIVEexecutive):typology modules (mono / 21739 UD .-policristallino /; only nominal POLICRYSTAL 230 wppower module) 50 UD. INVESTORSType structures FIXEDSurface total acres land 24 HAArea extension modules cover 18 HAField position SOUTH FLAT-LAND 1350 HOURS OF SUNArea of accessibility (good, GOOD PROVINCIALdiscreet, low): ROADEnvironmental Links APPROVED BY THE REGIONPresented Aval OKBuilding permit OKNETWORK CONNECTIONDistance from the point of 1000 MT 400 MT C.Pconnection: WITH OPTION.Date presentation DDP: 13.11.2009Datecceptance DDP (YES / SINO):EON filing date SI STEPAcceptance date EON SIType connection to network MEDIA TENSIONS(MT / AT)Ifsituation or completion of thecabin NOT PROVIDEDtransformation(Preliminary,

×