Offshore operations and the EIA:
lessons learned from seismic IEEs, and next steps
22-25 September 2015
Review process of IEE and EIA
reports in EIA procedure
EIA procedure, Annex (1)
IEE EIA No EIA/IEE
Screening Process on Oil and Gas Sector
All sizes • Onshore Oil and Gas Seismic Surveys
- All sizes • Onshore Oil and Gas Exploration Drillings
- All sizes • Onshore Oil and Gas Production drilling and
production activities; transportation activities
including pipelines; pump stations, compressor
stations and storage facilities; ancillary and support
operations; and decommissioning
All sizes - • Offshore Oil and Gas Seismic Surveys
- All sizes • Offshore Oil and Gas Exploration Drillings
- All sizes • Offshore Oil and Gas Production drilling and
production activities; offshore pipeline
operations, offshore transportation, compressor
stations and storage facilities; ancillary and
support operations; and decommissioning
Reviewing IEE Report
IEE
Review and Approval Process for IEE & EIA report
Initial and final reviewed by EIA Division under ECD
Approved by MONREC
Issued ECC by MONREC
To Undertake EIA
If required
Reviewing EIA Scoping Report and ToR
Reviewed by ECD
Approved by ECD (15 Days)
Review and Approval Process for IEE & EIA report (Cont’d)
Scoping Report and ToR
In accordance with Ministry Guidance
Reviewing EIA Reports
EIA
Initial Reviewed by ECD
Reviewed by Review Team (RT)
Approved by MONREC( ECC)
Issued ECC by MONREC
Rejected by
MONREC
Appeal
Project Termination
Review and Approval Process for IEE & EIA report (Cont’d)
No Yes
Not Satisfactory
Satisfactory
7
Time frame (IEE & EIA Review Process )
EIA Process Duration
Screening Proposal (IEE/EIA/Non) 15 days
IEE Process
• IEE expert approval (Third party or not) 7 days
• Preparing IEE Report ?
• IEE Report approval 60 days
EIA Process
• EIA expert approval (Third party or not) 7 days
• Developing Scoping Report and TOR ?
• Scoping report &TOR approval 15 days
• Investigation & Developing EIA Report ?
• EIA report approval 90 days
Background Information of EIA Review Team
— EIA Report Review Team, consisting of 39 members from
government agencies, i.e. MOECAF, 18 related ministries,
attorney General Office and 3 civil Development committee
of Yangon, Mandalay and Nay Pyi Taw, with a total of 39
members was formed, and the reviewing task was assigned
by MOECAF with reference number-2/220/(B) (3)/ (8007/
2013) dated 28-11-2013.
— With MOECAF’s reference number-2/220/(B) (3)/(8008/
2013) dated 28-11-2013, EIA report Review Team was also
recruited into 4 sub-groups based on Land use Sector,
Mining and Energy Sector, Urban and Construction Sector
and Industry Sector respectively.
Institutional Structure of EIA Review Team
EIA
review
Team
(39 members
from 18
Ministries,
Attorney
General
Office ,
NDC, YCDC
and MCDC)
RT Sub-group on Land use Sector
(11 members)
RT Sub-group on Mining and Energy Sector
(8 members) + (6 members from other sectors)
RT Sub-group on Urban and Construction
Sector (15 members)
RT Sub-group on Industry
( 9 members)
Contents and Structure of
IEE and EIA reports
IEE Report
1. Executive Summary
2. Details of the project proponent
3. Description of the project
4. Legal requirements
5. Governing parameters
6. Summary of Impacts
7. Description of proposed mitigation measures
8. Monitoring Program
9. Reporting requirements
10. Responsibilities for mitigation and monitoring
11. Emergency Plan
12. Capacity development and training
13. Public consultation and information disclosure
14. Work plan and implementation schedule
15. Review of the EMP
16. Conclusion and Recommendation
1. Executive Summary
2. Introduction
3. Policy, Legal and Institutional Framework
4. Project Descriptions and Alternatives Selection
(a) Project Background
(b) Project Location
(c) Comparison and Selection of the Alternatives
(d) Description of the selected alternatives
5. Description of the Surrounding Environment
(a) Setting the Study Limits
(b) Methodology for data collection and analysis
(c) Physical Components
(d) Biological Components
(e) Socio-Economic Components
(f) Cultural Components
(g) Visual Components
EIA Report Format
6. Impact Assessment and Mitigation Measures
(a) Impact Assessment Methodology and Approach
(b) Scope of Assessment
(c) Identification of Impacts
(d) Determination of significance of those impacts
(e) Mitigation Measures
(f) Incorporation of mitigation measures into project design
(g) Determination of any residual impacts
7. Risk Assessment
8. Cumulative Impact Assessment
9. Summary of Environmental Management Plan
10. Public Consultation and Disclosure
11. Conclusion and Recommendations
EIA Report Format (Cont’d;)
On-Shore Operation Off-shore Operation
Grand
Total
EIA/ESHIA,
SIA
Total IEE EIA
Scopi
ng
Monito
ring
Total
SeismicSurveyand
ExplorationDrilling
Production
2D&3DSeismic
Surrey
2D&3DSeismic
Surrey
Explorationdrilling
Production
ExplorationDrilling
3DSeismicSurvey
12 - 12 20 2 2 - 1 1 26 38
Current Status of IEE/ EIA/ Scoping and Monitoring Reports from
Onshore and Offshore Operations Received by ECD
( 12-10- 2013 to 30-6-2016)
Source: NR & EIA division, ECD, July 2016
On-shore Operation Off-shore Operation
Total
EIA IEE EIA Scoping Monitoring
InProgress
InitialReview
ReviewTeam
Meeting
Approved
InProgress
InitialComment
Approved
InProgress
Inprogress
InitialComment
Inprogress
InitialComment
7 2 3 - 4 11 7 2* 1 - 1 - 38
Current Status of IEE/ EIA/ Scoping and Monitoring Reports from
Onshore and Offshore Operations Reviewed by ECD
( 12-10- 2013 to 30-6-2016)
* 2 EIA reports for Seismic Survey
- To continue issuing ECC for approved IEE reports on Offshore Seismic Campaign
Source: NR & EIA division, ECD, July 2016
Seismic Operation (2D &3D) Exploration Drilling
Total
IEE Report (22) EIA
Monit
oring
EIA Report (2) Scoping
InProgress
InitialComment
Approved
InProgress
InProgress
InProgress
InitialReview
ReviewTeam
Meeting
Approved
InProgress
4 11 7 2* 1 - 2 - - 1 26+2*
Current Status of IEE/ EIA, Scoping and Monitoring Reports from
Only Offshore Operation Reviewed by ECD
( 12-10- 2013 to 30-6-2016)
* 2 EIA reports for Seismic Survey
- To continue issuing ECC for approved IEE reports on Offshore Seismic Campaign
Source: NR & EIA division, ECD, July 2016
Director	(1)	+	(11)	
Natural	Resources	Conservation	and	EIA	Division
Deputy Director (-)
Deputy	Director	General	
Director	General
Current Institutional Structure of Natural Resources Conservation and EIA Division
Natural	Resources	Conservation	
Sub-Division	(3)
EIA	Sub-Division	(8)
Assistant	Director	-EIA	Unit	(1)	
Urban,	Construction	and	Industry	sector
Assistant	Director	-EIA	Unit	(2)	
Land	Use,	Mining	and	Energy		Sector
Staff	Officer	(1)
(Energy	&	Land	use	Sector)
Staff	Officer	(1)
(Mining	Sector)
Deputy	Staff	Officer	(1)
Staff	Officer	(1)
(Urban	&	Construction	Sector)
Staff	Officer	(1)
(	Industry	Sector)
Deputy	Staff	Officer	(1)
Remaining Challenges for ECD
Ø Influx of Reports from various sectors
Ø Lack of Sectoral Guidelines for Reviewing (Oil and Gas
Review Guidelines)
Ø ECD has to take full responsibility for approval of IEE
reports. (26/38 mentioned in previous slide)
Ø Limited Staff and Capacity (HQ and Regional/ States)
Ø EIA Staff assigned by Ministry to take responsibilities
rather than Review Work.
Ø Urgent need of ECC guidelines
Ø No experts in oil and gas sector
Ø EIA review process is quite new to RT.
Ø Lack of Review Framework and specific sectoral
guidelines for oil and gas sector
Ø Cannot pay full attention to review work as they have their
own work
Ø Cannot fully participate in the whole review process of
EIA report of a project
Ø Responsible to review EIA reports coming from various
sectors rather than specific oil and gas sector.
Remaining Challenges for Review Team (RT)
Current Efforts to tackle Remaining Challenges
Ø General EIA Review and ECC Guidelines under
preparation with ADB technical assistance
Ø Final draft of Oil and Gas Sectoral Guidelines with NEA
technical assistance
Ø Review Checklists under preparation with JICA technical
assistance
Ø Capacity Building (Clinical Training, Field Trips,
Workshops and Meetings, etc)
Ø Recruited only 12 staffs for reviewing purpose
Current Efforts to tackle Remaining Challenges (Cont’d)
Ø Planning to recruit 20 Government experts from 20
relevant Ministries
Ø Cooperation with local professionals for reviewing EA
reports
Ø Already Recruited and Assigned EIA staffs for reviewing
specific sectors (For Oil and Gas sector – 4 staffs only)
(not including 12 new staffs)
Ways Forward
Ø To seek technical and financial assistances from
Development Partners
Ø To issue ECC (ADB)
Ø To establish Environmental Management Fund
(UNDP)
Ø To issue guidelines for oil and gas sector(NEA)
Ø To issue general review guidelines (ADB)
Ø To develop sectoral checklists (JICA)
Contact Information
— Contact Person: Dr. San Oo (Director)
Ms. Sa Aung Thu( Assistant Director)
— Contact Phone/Fax: 067- 431329 (Office)
— Contact Email:
— NR & EIA Division (office) nreia.env@gmail.com
— Mr. Sa Aung Thu (AD) 2012saungthu@gmail.com
— Relevant Information is available at ECD website
(www.ecd.gov.mm)
Thank You Very Much For Your Kind
Attention!

More Related Content

What's hot

Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEmerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEthical Sector
 
Assessing proposed project development under EIA
Assessing proposed project development under EIAAssessing proposed project development under EIA
Assessing proposed project development under EIAKisesa Hamis
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 
Eia basic concepts_15_dec05
Eia basic concepts_15_dec05Eia basic concepts_15_dec05
Eia basic concepts_15_dec05Shimalsh
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
 
Environmental Impact Assessment and Meaningful Citizen Participation
Environmental Impact Assessment and Meaningful Citizen ParticipationEnvironmental Impact Assessment and Meaningful Citizen Participation
Environmental Impact Assessment and Meaningful Citizen ParticipationPublic Affairs Centre
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentationsujit roy
 
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape
 
Environmental Impact assessment
Environmental Impact assessmentEnvironmental Impact assessment
Environmental Impact assessmentDavis Ciprikis
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentNigel Gardner
 

What's hot (20)

Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEmerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
 
Eia
EiaEia
Eia
 
Iee
IeeIee
Iee
 
Assessing proposed project development under EIA
Assessing proposed project development under EIAAssessing proposed project development under EIA
Assessing proposed project development under EIA
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Eia basic concepts_15_dec05
Eia basic concepts_15_dec05Eia basic concepts_15_dec05
Eia basic concepts_15_dec05
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
BlueScape How to Create a CEQA Air Quality Analysis for Development Projects ...
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environmental Impact Assessment and Meaningful Citizen Participation
Environmental Impact Assessment and Meaningful Citizen ParticipationEnvironmental Impact Assessment and Meaningful Citizen Participation
Environmental Impact Assessment and Meaningful Citizen Participation
 
Environmental Impact
Environmental ImpactEnvironmental Impact
Environmental Impact
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
PEISS
PEISSPEISS
PEISS
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
 
PEISS
PEISSPEISS
PEISS
 
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
 
Environmental Impact assessment
Environmental Impact assessmentEnvironmental Impact assessment
Environmental Impact assessment
 
EIA process
EIA processEIA process
EIA process
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA Report
EIA ReportEIA Report
EIA Report
 

Viewers also liked

SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learnedSHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learnedEthical Sector
 
Recap of 2014 meeting and this meeting’s objectives (Burmese)
Recap of 2014 meeting and this meeting’s objectives (Burmese)Recap of 2014 meeting and this meeting’s objectives (Burmese)
Recap of 2014 meeting and this meeting’s objectives (Burmese)Ethical Sector
 
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned
IEE for 2D Seismic Survey AD-10 Process and Lessons LearnedIEE for 2D Seismic Survey AD-10 Process and Lessons Learned
IEE for 2D Seismic Survey AD-10 Process and Lessons LearnedEthical Sector
 
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned (my)
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned (my)IEE for 2D Seismic Survey AD-10 Process and Lessons Learned (my)
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned (my)Ethical Sector
 
Woodside Energy (en) Exploration Drilling
Woodside Energy (en) Exploration DrillingWoodside Energy (en) Exploration Drilling
Woodside Energy (en) Exploration DrillingEthical Sector
 
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned (Burm...
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned (Burm...SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned (Burm...
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned (Burm...Ethical Sector
 

Viewers also liked (7)

SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learnedSHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned
 
Recap of 2014 meeting and this meeting’s objectives (Burmese)
Recap of 2014 meeting and this meeting’s objectives (Burmese)Recap of 2014 meeting and this meeting’s objectives (Burmese)
Recap of 2014 meeting and this meeting’s objectives (Burmese)
 
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned
IEE for 2D Seismic Survey AD-10 Process and Lessons LearnedIEE for 2D Seismic Survey AD-10 Process and Lessons Learned
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned
 
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned (my)
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned (my)IEE for 2D Seismic Survey AD-10 Process and Lessons Learned (my)
IEE for 2D Seismic Survey AD-10 Process and Lessons Learned (my)
 
Woodside Energy (en) Exploration Drilling
Woodside Energy (en) Exploration DrillingWoodside Energy (en) Exploration Drilling
Woodside Energy (en) Exploration Drilling
 
Woodside Energy (my)
Woodside Energy (my)Woodside Energy (my)
Woodside Energy (my)
 
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned (Burm...
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned (Burm...SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned (Burm...
SHELL / BG OFFSHORE SEISMIC SURVEY CAMPAIGN IEE PROCESS Lessons learned (Burm...
 

Similar to Update on Implementation of the EIA Process and Remaining Challenges in Oil and Gas Sector

2. EIA Process Experience to Date - Htin Aung Kyaw
2. EIA Process Experience to Date - Htin Aung Kyaw2. EIA Process Experience to Date - Htin Aung Kyaw
2. EIA Process Experience to Date - Htin Aung KyawEthical Sector
 
Kenya projectsummaryreport20181001
Kenya projectsummaryreport20181001Kenya projectsummaryreport20181001
Kenya projectsummaryreport20181001Maarten Smies
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan finalSevern Estuary
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfHajiraThabasum
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfChandanLawrence
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
 
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfRPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfOECD Environment
 
20151013 ISO TC 67 at Offshore Energy 2015
20151013 ISO TC 67 at Offshore Energy 201520151013 ISO TC 67 at Offshore Energy 2015
20151013 ISO TC 67 at Offshore Energy 2015Jarno Dakhorst
 
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECB. BHASKAR
 
South africaprojectprojectproposal20151102
South africaprojectprojectproposal20151102South africaprojectprojectproposal20151102
South africaprojectprojectproposal20151102Patrícia Pereira
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020Chandrakant Singh
 
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Giuseppe Moricca
 
Environmental Impact Evaluation of Mining
Environmental Impact Evaluation of MiningEnvironmental Impact Evaluation of Mining
Environmental Impact Evaluation of Miningijtsrd
 
Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2B. BHASKAR
 
4. Myanmar's EIA Process
4. Myanmar's EIA Process4. Myanmar's EIA Process
4. Myanmar's EIA ProcessEthical Sector
 
641. Mashinga, EIA as Planning Tool and its Effectiveness in Rwanda.ppt
641. Mashinga, EIA as Planning Tool and its Effectiveness in Rwanda.ppt641. Mashinga, EIA as Planning Tool and its Effectiveness in Rwanda.ppt
641. Mashinga, EIA as Planning Tool and its Effectiveness in Rwanda.pptmunyamboneradivin2
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airportsAbhishek Kumar Sinha
 

Similar to Update on Implementation of the EIA Process and Remaining Challenges in Oil and Gas Sector (20)

2. EIA Process Experience to Date - Htin Aung Kyaw
2. EIA Process Experience to Date - Htin Aung Kyaw2. EIA Process Experience to Date - Htin Aung Kyaw
2. EIA Process Experience to Date - Htin Aung Kyaw
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
Kenya projectsummaryreport20181001
Kenya projectsummaryreport20181001Kenya projectsummaryreport20181001
Kenya projectsummaryreport20181001
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan final
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfRPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
 
20151013 ISO TC 67 at Offshore Energy 2015
20151013 ISO TC 67 at Offshore Energy 201520151013 ISO TC 67 at Offshore Energy 2015
20151013 ISO TC 67 at Offshore Energy 2015
 
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
 
APR Workshop 2010-APR Performance-Maria Donnat
APR Workshop 2010-APR Performance-Maria DonnatAPR Workshop 2010-APR Performance-Maria Donnat
APR Workshop 2010-APR Performance-Maria Donnat
 
South africaprojectprojectproposal20151102
South africaprojectprojectproposal20151102South africaprojectprojectproposal20151102
South africaprojectprojectproposal20151102
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
EIA;- EC
EIA;- ECEIA;- EC
EIA;- EC
 
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
 
Environmental Impact Evaluation of Mining
Environmental Impact Evaluation of MiningEnvironmental Impact Evaluation of Mining
Environmental Impact Evaluation of Mining
 
Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2
 
4. Myanmar's EIA Process
4. Myanmar's EIA Process4. Myanmar's EIA Process
4. Myanmar's EIA Process
 
641. Mashinga, EIA as Planning Tool and its Effectiveness in Rwanda.ppt
641. Mashinga, EIA as Planning Tool and its Effectiveness in Rwanda.ppt641. Mashinga, EIA as Planning Tool and its Effectiveness in Rwanda.ppt
641. Mashinga, EIA as Planning Tool and its Effectiveness in Rwanda.ppt
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 

More from Ethical Sector

Verbit - The State of Inclusivity, A Global Perspective
Verbit - The State of Inclusivity, A Global PerspectiveVerbit - The State of Inclusivity, A Global Perspective
Verbit - The State of Inclusivity, A Global PerspectiveEthical Sector
 
Acoustic Protocol 2021
Acoustic Protocol 2021Acoustic Protocol 2021
Acoustic Protocol 2021Ethical Sector
 
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform Plans
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform PlansLabour Issues in the Telecom Sector: Myanmar Labour Laws and Reform Plans
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform PlansEthical Sector
 
Community Grievance Management Experiences
Community Grievance Management ExperiencesCommunity Grievance Management Experiences
Community Grievance Management ExperiencesEthical Sector
 
Community Outreach (SLO)
Community Outreach (SLO)Community Outreach (SLO)
Community Outreach (SLO)Ethical Sector
 
Workplace Safety in Telecom Industry
Workplace Safety in Telecom IndustryWorkplace Safety in Telecom Industry
Workplace Safety in Telecom IndustryEthical Sector
 
Health and Safety in Myanmar
Health and Safety in MyanmarHealth and Safety in Myanmar
Health and Safety in MyanmarEthical Sector
 
Workshop on Safety and Labour Issues in the Myanmar Telecoms Sector
Workshop on Safety and Labour Issues in the Myanmar Telecoms SectorWorkshop on Safety and Labour Issues in the Myanmar Telecoms Sector
Workshop on Safety and Labour Issues in the Myanmar Telecoms SectorEthical Sector
 
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive Business
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive BusinessVirtual Roundtable Discussion with CSOs on Extractives and Inclusive Business
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive BusinessEthical Sector
 
Health and Pollution Action Planning (HPAP)
Health and Pollution Action Planning (HPAP)Health and Pollution Action Planning (HPAP)
Health and Pollution Action Planning (HPAP)Ethical Sector
 
HPAP - Health and Pollution Action Plan
HPAP - Health and Pollution Action PlanHPAP - Health and Pollution Action Plan
HPAP - Health and Pollution Action PlanEthical Sector
 
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...Ethical Sector
 
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...Ethical Sector
 
Launch of the 2020 Pwint Thit Sa Report research phase
Launch of the 2020 Pwint Thit Sa Report research phaseLaunch of the 2020 Pwint Thit Sa Report research phase
Launch of the 2020 Pwint Thit Sa Report research phaseEthical Sector
 
2020 Pwint Thit Sa - Webinar
2020 Pwint Thit Sa - Webinar2020 Pwint Thit Sa - Webinar
2020 Pwint Thit Sa - WebinarEthical Sector
 
Business & Digital Rights (Myanmar Business Associations Status)
Business & Digital Rights (Myanmar Business Associations Status)Business & Digital Rights (Myanmar Business Associations Status)
Business & Digital Rights (Myanmar Business Associations Status)Ethical Sector
 
4b steve crown mdrf 2020
4b steve crown mdrf 20204b steve crown mdrf 2020
4b steve crown mdrf 2020Ethical Sector
 
3e myanmar consumers u nion mdrf2020
3e myanmar consumers u nion mdrf20203e myanmar consumers u nion mdrf2020
3e myanmar consumers u nion mdrf2020Ethical Sector
 

More from Ethical Sector (20)

Verbit - The State of Inclusivity, A Global Perspective
Verbit - The State of Inclusivity, A Global PerspectiveVerbit - The State of Inclusivity, A Global Perspective
Verbit - The State of Inclusivity, A Global Perspective
 
Acoustic Protocol 2021
Acoustic Protocol 2021Acoustic Protocol 2021
Acoustic Protocol 2021
 
Skillset
SkillsetSkillset
Skillset
 
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform Plans
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform PlansLabour Issues in the Telecom Sector: Myanmar Labour Laws and Reform Plans
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform Plans
 
Community Grievance Management Experiences
Community Grievance Management ExperiencesCommunity Grievance Management Experiences
Community Grievance Management Experiences
 
Community Outreach (SLO)
Community Outreach (SLO)Community Outreach (SLO)
Community Outreach (SLO)
 
Workplace Safety in Telecom Industry
Workplace Safety in Telecom IndustryWorkplace Safety in Telecom Industry
Workplace Safety in Telecom Industry
 
Health and Safety in Myanmar
Health and Safety in MyanmarHealth and Safety in Myanmar
Health and Safety in Myanmar
 
Workshop on Safety and Labour Issues in the Myanmar Telecoms Sector
Workshop on Safety and Labour Issues in the Myanmar Telecoms SectorWorkshop on Safety and Labour Issues in the Myanmar Telecoms Sector
Workshop on Safety and Labour Issues in the Myanmar Telecoms Sector
 
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive Business
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive BusinessVirtual Roundtable Discussion with CSOs on Extractives and Inclusive Business
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive Business
 
AirQualityAsia
AirQualityAsiaAirQualityAsia
AirQualityAsia
 
Health and Pollution Action Planning (HPAP)
Health and Pollution Action Planning (HPAP)Health and Pollution Action Planning (HPAP)
Health and Pollution Action Planning (HPAP)
 
HPAP - Health and Pollution Action Plan
HPAP - Health and Pollution Action PlanHPAP - Health and Pollution Action Plan
HPAP - Health and Pollution Action Plan
 
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...
 
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...
 
Launch of the 2020 Pwint Thit Sa Report research phase
Launch of the 2020 Pwint Thit Sa Report research phaseLaunch of the 2020 Pwint Thit Sa Report research phase
Launch of the 2020 Pwint Thit Sa Report research phase
 
2020 Pwint Thit Sa - Webinar
2020 Pwint Thit Sa - Webinar2020 Pwint Thit Sa - Webinar
2020 Pwint Thit Sa - Webinar
 
Business & Digital Rights (Myanmar Business Associations Status)
Business & Digital Rights (Myanmar Business Associations Status)Business & Digital Rights (Myanmar Business Associations Status)
Business & Digital Rights (Myanmar Business Associations Status)
 
4b steve crown mdrf 2020
4b steve crown mdrf 20204b steve crown mdrf 2020
4b steve crown mdrf 2020
 
3e myanmar consumers u nion mdrf2020
3e myanmar consumers u nion mdrf20203e myanmar consumers u nion mdrf2020
3e myanmar consumers u nion mdrf2020
 

Recently uploaded

Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...narwatsonia7
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxTechSoupConnectLondo
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Christina Parmionova
 
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDisciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDeLeon9
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolSERUDS INDIA
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...Amil baba
 

Recently uploaded (20)

Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptx
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...
 
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdfDisciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
Disciplines-and-Ideas-in-the-Applied-Social-Sciences-DLP-.pdf
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
 
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Mehrauli  DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Mehrauli DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Punjabi Bagh DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in Mukherjee Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
Start Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnoolStart Donating your Old Clothes to Poor People kurnool
Start Donating your Old Clothes to Poor People kurnool
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 Certified kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
 

Update on Implementation of the EIA Process and Remaining Challenges in Oil and Gas Sector

  • 1. Update on Implementation of the EIA process and Remaining Challenges in Oil and Gas Sector Mr. Sa Aung Thu Assistant Director Environmental Conservation Department Ministry of Natural Resources and Environmental Conservation 11 July 2016 Hilton, Nay Pyi Taw Offshore operations and the EIA: lessons learned from seismic IEEs, and next steps 22-25 September 2015
  • 2. Review process of IEE and EIA reports in EIA procedure
  • 3. EIA procedure, Annex (1) IEE EIA No EIA/IEE Screening Process on Oil and Gas Sector All sizes • Onshore Oil and Gas Seismic Surveys - All sizes • Onshore Oil and Gas Exploration Drillings - All sizes • Onshore Oil and Gas Production drilling and production activities; transportation activities including pipelines; pump stations, compressor stations and storage facilities; ancillary and support operations; and decommissioning All sizes - • Offshore Oil and Gas Seismic Surveys - All sizes • Offshore Oil and Gas Exploration Drillings - All sizes • Offshore Oil and Gas Production drilling and production activities; offshore pipeline operations, offshore transportation, compressor stations and storage facilities; ancillary and support operations; and decommissioning
  • 4. Reviewing IEE Report IEE Review and Approval Process for IEE & EIA report Initial and final reviewed by EIA Division under ECD Approved by MONREC Issued ECC by MONREC To Undertake EIA If required
  • 5. Reviewing EIA Scoping Report and ToR Reviewed by ECD Approved by ECD (15 Days) Review and Approval Process for IEE & EIA report (Cont’d) Scoping Report and ToR In accordance with Ministry Guidance
  • 6. Reviewing EIA Reports EIA Initial Reviewed by ECD Reviewed by Review Team (RT) Approved by MONREC( ECC) Issued ECC by MONREC Rejected by MONREC Appeal Project Termination Review and Approval Process for IEE & EIA report (Cont’d) No Yes Not Satisfactory Satisfactory
  • 7. 7 Time frame (IEE & EIA Review Process ) EIA Process Duration Screening Proposal (IEE/EIA/Non) 15 days IEE Process • IEE expert approval (Third party or not) 7 days • Preparing IEE Report ? • IEE Report approval 60 days EIA Process • EIA expert approval (Third party or not) 7 days • Developing Scoping Report and TOR ? • Scoping report &TOR approval 15 days • Investigation & Developing EIA Report ? • EIA report approval 90 days
  • 8. Background Information of EIA Review Team — EIA Report Review Team, consisting of 39 members from government agencies, i.e. MOECAF, 18 related ministries, attorney General Office and 3 civil Development committee of Yangon, Mandalay and Nay Pyi Taw, with a total of 39 members was formed, and the reviewing task was assigned by MOECAF with reference number-2/220/(B) (3)/ (8007/ 2013) dated 28-11-2013. — With MOECAF’s reference number-2/220/(B) (3)/(8008/ 2013) dated 28-11-2013, EIA report Review Team was also recruited into 4 sub-groups based on Land use Sector, Mining and Energy Sector, Urban and Construction Sector and Industry Sector respectively.
  • 9. Institutional Structure of EIA Review Team EIA review Team (39 members from 18 Ministries, Attorney General Office , NDC, YCDC and MCDC) RT Sub-group on Land use Sector (11 members) RT Sub-group on Mining and Energy Sector (8 members) + (6 members from other sectors) RT Sub-group on Urban and Construction Sector (15 members) RT Sub-group on Industry ( 9 members)
  • 10. Contents and Structure of IEE and EIA reports
  • 11. IEE Report 1. Executive Summary 2. Details of the project proponent 3. Description of the project 4. Legal requirements 5. Governing parameters 6. Summary of Impacts 7. Description of proposed mitigation measures 8. Monitoring Program 9. Reporting requirements 10. Responsibilities for mitigation and monitoring 11. Emergency Plan 12. Capacity development and training 13. Public consultation and information disclosure 14. Work plan and implementation schedule 15. Review of the EMP 16. Conclusion and Recommendation
  • 12. 1. Executive Summary 2. Introduction 3. Policy, Legal and Institutional Framework 4. Project Descriptions and Alternatives Selection (a) Project Background (b) Project Location (c) Comparison and Selection of the Alternatives (d) Description of the selected alternatives 5. Description of the Surrounding Environment (a) Setting the Study Limits (b) Methodology for data collection and analysis (c) Physical Components (d) Biological Components (e) Socio-Economic Components (f) Cultural Components (g) Visual Components EIA Report Format
  • 13. 6. Impact Assessment and Mitigation Measures (a) Impact Assessment Methodology and Approach (b) Scope of Assessment (c) Identification of Impacts (d) Determination of significance of those impacts (e) Mitigation Measures (f) Incorporation of mitigation measures into project design (g) Determination of any residual impacts 7. Risk Assessment 8. Cumulative Impact Assessment 9. Summary of Environmental Management Plan 10. Public Consultation and Disclosure 11. Conclusion and Recommendations EIA Report Format (Cont’d;)
  • 14. On-Shore Operation Off-shore Operation Grand Total EIA/ESHIA, SIA Total IEE EIA Scopi ng Monito ring Total SeismicSurveyand ExplorationDrilling Production 2D&3DSeismic Surrey 2D&3DSeismic Surrey Explorationdrilling Production ExplorationDrilling 3DSeismicSurvey 12 - 12 20 2 2 - 1 1 26 38 Current Status of IEE/ EIA/ Scoping and Monitoring Reports from Onshore and Offshore Operations Received by ECD ( 12-10- 2013 to 30-6-2016) Source: NR & EIA division, ECD, July 2016
  • 15. On-shore Operation Off-shore Operation Total EIA IEE EIA Scoping Monitoring InProgress InitialReview ReviewTeam Meeting Approved InProgress InitialComment Approved InProgress Inprogress InitialComment Inprogress InitialComment 7 2 3 - 4 11 7 2* 1 - 1 - 38 Current Status of IEE/ EIA/ Scoping and Monitoring Reports from Onshore and Offshore Operations Reviewed by ECD ( 12-10- 2013 to 30-6-2016) * 2 EIA reports for Seismic Survey - To continue issuing ECC for approved IEE reports on Offshore Seismic Campaign Source: NR & EIA division, ECD, July 2016
  • 16. Seismic Operation (2D &3D) Exploration Drilling Total IEE Report (22) EIA Monit oring EIA Report (2) Scoping InProgress InitialComment Approved InProgress InProgress InProgress InitialReview ReviewTeam Meeting Approved InProgress 4 11 7 2* 1 - 2 - - 1 26+2* Current Status of IEE/ EIA, Scoping and Monitoring Reports from Only Offshore Operation Reviewed by ECD ( 12-10- 2013 to 30-6-2016) * 2 EIA reports for Seismic Survey - To continue issuing ECC for approved IEE reports on Offshore Seismic Campaign Source: NR & EIA division, ECD, July 2016
  • 17. Director (1) + (11) Natural Resources Conservation and EIA Division Deputy Director (-) Deputy Director General Director General Current Institutional Structure of Natural Resources Conservation and EIA Division Natural Resources Conservation Sub-Division (3) EIA Sub-Division (8) Assistant Director -EIA Unit (1) Urban, Construction and Industry sector Assistant Director -EIA Unit (2) Land Use, Mining and Energy Sector Staff Officer (1) (Energy & Land use Sector) Staff Officer (1) (Mining Sector) Deputy Staff Officer (1) Staff Officer (1) (Urban & Construction Sector) Staff Officer (1) ( Industry Sector) Deputy Staff Officer (1)
  • 18. Remaining Challenges for ECD Ø Influx of Reports from various sectors Ø Lack of Sectoral Guidelines for Reviewing (Oil and Gas Review Guidelines) Ø ECD has to take full responsibility for approval of IEE reports. (26/38 mentioned in previous slide) Ø Limited Staff and Capacity (HQ and Regional/ States) Ø EIA Staff assigned by Ministry to take responsibilities rather than Review Work. Ø Urgent need of ECC guidelines Ø No experts in oil and gas sector
  • 19. Ø EIA review process is quite new to RT. Ø Lack of Review Framework and specific sectoral guidelines for oil and gas sector Ø Cannot pay full attention to review work as they have their own work Ø Cannot fully participate in the whole review process of EIA report of a project Ø Responsible to review EIA reports coming from various sectors rather than specific oil and gas sector. Remaining Challenges for Review Team (RT)
  • 20. Current Efforts to tackle Remaining Challenges Ø General EIA Review and ECC Guidelines under preparation with ADB technical assistance Ø Final draft of Oil and Gas Sectoral Guidelines with NEA technical assistance Ø Review Checklists under preparation with JICA technical assistance Ø Capacity Building (Clinical Training, Field Trips, Workshops and Meetings, etc) Ø Recruited only 12 staffs for reviewing purpose
  • 21. Current Efforts to tackle Remaining Challenges (Cont’d) Ø Planning to recruit 20 Government experts from 20 relevant Ministries Ø Cooperation with local professionals for reviewing EA reports Ø Already Recruited and Assigned EIA staffs for reviewing specific sectors (For Oil and Gas sector – 4 staffs only) (not including 12 new staffs)
  • 22. Ways Forward Ø To seek technical and financial assistances from Development Partners Ø To issue ECC (ADB) Ø To establish Environmental Management Fund (UNDP) Ø To issue guidelines for oil and gas sector(NEA) Ø To issue general review guidelines (ADB) Ø To develop sectoral checklists (JICA)
  • 23. Contact Information — Contact Person: Dr. San Oo (Director) Ms. Sa Aung Thu( Assistant Director) — Contact Phone/Fax: 067- 431329 (Office) — Contact Email: — NR & EIA Division (office) nreia.env@gmail.com — Mr. Sa Aung Thu (AD) 2012saungthu@gmail.com — Relevant Information is available at ECD website (www.ecd.gov.mm)