Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Investing in Indonesia’s Future
Why ICE?

Each projects are treated as SPC (Special Purpose Companies). Allowing greater flexibility,
focus and a more sel...
The most productive location available for Dominanga Micro Hydro”

    ICE carefully selected the technical team in charge...
“Locks abundant supply for Jambi Biogas”

    The location is selected to maintain an abundant and sustainable supply of r...
Inquiries: erika@ice.co.id
Upcoming SlideShare
Loading in …5
×

Microsoft power point 100710 ice-projectpitch_a0710b0710

709 views

Published on

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

Microsoft power point 100710 ice-projectpitch_a0710b0710

  1. 1. Investing in Indonesia’s Future
  2. 2. Why ICE? Each projects are treated as SPC (Special Purpose Companies). Allowing greater flexibility, focus and a more selective expertise. - Build relations to: tax and audit firms, insurance advisors, CDM advisors, etc. - Work with lending personal and institutions - Exist as a player in the carbon credit market - Creating green image SPC - Maintaining a solid interpretation of the bottom-line - Project acquisition - Board of Technical and Operation for the project in question - Working relationship to design engineering and construction parties - Ensuring a solid implementation of the three corporate bottom-lines The three bottom-line approach (Social, Environment and Community) is designed to obtain the five fundamentals in delivering renewable supply (Accessibility, Availability, Affordability, Sustainability and Scalability) >> Proof of Our Word
  3. 3. The most productive location available for Dominanga Micro Hydro” ICE carefully selected the technical team in charge. A team that has already successfully delivered hydro projects in the region (Mobuya and Anga Anga) and in the process of delivery has identified the most productive location in the region. A location now marked for ICE – Dominanga Hydro. SPC PT Dominanga Clean Energy Power Potential 3.6 MW Capacity Factor 80% Energy Output 25,228,800 KWh Estimate Project Cost US$ 1,700,000 per MW Technology Used Water turbine, Francis, at run off river Distance to PLN Grid (km) 1.50 Estimate Purchase Power Rp 787/ KWh
  4. 4. “Locks abundant supply for Jambi Biogas” The location is selected to maintain an abundant and sustainable supply of resource for the biogas plant. The surrounding plantations are already in agreement to supply the factory with their waste (fiber, shell, and EFB) – used as raw material in the project SPC PT Sumatera Bioenergy Project Name PLTUBS Jambi Bioenergy Location Muaro, Jambi Power Potential 2 x 5 MW Capacity Factor 90% Energy Output pa 78,840,000 KWh EFB Requirement 108,000 ton pa EFB Available 279,864 ton pa Ratio EFB Required to Available 40% Estimate Project Cost US$ 1,620,000 per MW Technology Used Combination of biological waste Distance to PLN Grid (km) 8-10 Estimate Purchase Power Rp 787/ KWh
  5. 5. Inquiries: erika@ice.co.id

×