WELCOME
LUCKNOW METRO

METRO CELL, HOUSING AND URBAN PLANNING DEPTT.
November 28th , 2013
SALIENT FEATURES
Route Length

North – South Corridor
(CCS Airport to Munshi Pulia)
East – West Corridor
(Lucknow
Rly.
Sta...
SALIENT FEATURES
Number of stations

North
–
South
Corridor
(CCS Airport to Munshi
Pulia)

19

3

22

East – West Corridor...
Traffic Forecast

SALIENT FEATURES

2015

13190

3227960

429250

7.52

2020

20976

4886515

644659

7.58

25890

6132646...
SALIENT FEATURES
• Speed
 Designed Speed - 80 kmph
 Scheduled speed - 34 kmph for N-S Corridor
- 32 kmph for E-W Corrido...
SALIENT FEATURES
• Track – Ballast less track on Standard Gauge.
• Rolling Stock
2.9 m wide light weight, Stainless Steel...
SALIENT FEATURES
• Construction Method -Elevated viaduct by using
pre-stressed concrete, U shaped/Box Shaped
girders with ...
SALIENT FEATURES
.

Cost Estimates
S. No.

Name of the corridor

Estimated cost
without taxes &
duties (at May
2013 prices...
Funding pattern under SPV model
(with central taxes) – NS Corridor
S.
Particulars
Amount
N
(In Rs. Crore)
o.
1. Equity By ...
SALIENT FEATURES
• FIRR
8.12%
• EIRR
The EIRR (without taxes) in economic terms
works out to be 19.43 % for the project
SALIENT FEATURES
• Web Portal being designed
• State Data Centre to host data
• Plans to make LMRC an e-office
WAY FORWARD
 Techno-feasibility study
 Techno-feasibility study for following
routes is to be done by DMRC: Mill Road- ...
WAY FORWARD
 Enactment of Metro Acts
Central Metro Acts for construction,
operation and maintenance of Lucknow
Metro Rai...
WAY FORWARD
 Formation of SPV
 ‘Lucknow Metro Rail Corporation’ (LMRC)
incorporated under Companies Act.
 Authorised sh...
WAY FORWARD
 Funding of SPV
 Funding through Central and State
equity and loaning from multilateral
agencies.
 Initial ...
WAY FORWARD
 Logo for SPV
 Active public participation for designing
the ‘logo’ for LMRC. Overwhelming
response with ove...
WAY FORWARD
 Administration of SPV
 Modern office of Metro Cell/ LMRC
functional in Janpath Market, Hazratganj
with 3400...
WAY FORWARD
 Initial Organizational Structure of SPV
 Following sections are to be created initially : Administration/H...
Thank you
e-Uttar Pradesh 2013 - Growth of IT Infrastructure - Rajiv Agarwal, Chairman, Metro Cell, Government of Uttar Pradesh
Upcoming SlideShare
Loading in …5
×

e-Uttar Pradesh 2013 - Growth of IT Infrastructure - Rajiv Agarwal, Chairman, Metro Cell, Government of Uttar Pradesh

827 views

Published on

e-Uttar Pradesh 2013 - Growth of IT Infrastructure - Rajiv Agarwal, Chairman, Metro Cell, Government of Uttar Pradesh

Published in: Education, Business
  • Be the first to comment

e-Uttar Pradesh 2013 - Growth of IT Infrastructure - Rajiv Agarwal, Chairman, Metro Cell, Government of Uttar Pradesh

  1. 1. WELCOME LUCKNOW METRO METRO CELL, HOUSING AND URBAN PLANNING DEPTT. November 28th , 2013
  2. 2. SALIENT FEATURES Route Length North – South Corridor (CCS Airport to Munshi Pulia) East – West Corridor (Lucknow Rly. Station Vasantkunj) Total 19.438 to 3.440 22.878 4.295 6.298 11.098 23.733 9.738 33.976  NS Corridor approved by GoUP in phase 1A
  3. 3. SALIENT FEATURES Number of stations North – South Corridor (CCS Airport to Munshi Pulia) 19 3 22 East – West Corridor (Lucknow Rly. Station to Vasantkunj) 5 7 12 24 10 34 Total
  4. 4. Traffic Forecast SALIENT FEATURES 2015 13190 3227960 429250 7.52 2020 20976 4886515 644659 7.58 25890 6132646 833240 7.36 2030 34955 7664688 1054290 7.27 2041 44408 9501868 1343970 7.07 2015 7639 619487 155650 3.98 2020 14157 1007262 243300 4.14 21434 1477121 345930 4.27 2030 29171 1982341 459940 4.31 2041 36196 2496832 600200 4.16 2025 2025 22.878 11.098
  5. 5. SALIENT FEATURES • Speed  Designed Speed - 80 kmph  Scheduled speed - 34 kmph for N-S Corridor - 32 kmph for E-W Corridor • Traction Power Supply  Voltage - 25 KV OHE • Maintenance Facilities  Maintenance Depot for Corridor-1  Maintenance Depot for Corridor-2- Transport Nagar Vasant Kunj Depot
  6. 6. SALIENT FEATURES • Track – Ballast less track on Standard Gauge. • Rolling Stock 2.9 m wide light weight, Stainless Steel, fully, vestibule Air-Conditioned. • Signaling system Cab signaling with continuous automatic train control ATP (Automatic Train Protection ) ATO (Automatic Train Operation – later stage) Communication Based Train Control (CBTC) under consideration
  7. 7. SALIENT FEATURES • Construction Method -Elevated viaduct by using pre-stressed concrete, U shaped/Box Shaped girders with pile or open foundation • Fare Collection system – Automatic fare collection with use of smart cards & tokens. • System Capacity – 48048 passengers per hour with 2.5 minutes headway.
  8. 8. SALIENT FEATURES . Cost Estimates S. No. Name of the corridor Estimated cost without taxes & duties (at May 2013 prices) in Rs. Crores 1 North – South Corridor 4992 6880 2 East – West Corridor 3723 5494 8715 12374 Total State Taxes extra Rs 333 cr. Completion cost (including escalation and Central taxes only) in Rs. Crores
  9. 9. Funding pattern under SPV model (with central taxes) – NS Corridor S. Particulars Amount N (In Rs. Crore) o. 1. Equity By GOI 1003.00 2. Equity By GoUP 1003.00 3. SD for CT by GoUP (50%) 373.00 4. SD for CT by GOI (50%) 373.00 5. SD for Land by GoUP (100%) 381.00 6. Contribution of Local Bodies under ‘ Innovative Financing’ 245.00 7. 1.40% Loan /12% Market Borrowings 3502.00 6880.00 % of Contribution 14.46% 14.46% 5.54% 5.54% 4.40% 2.83% 52.77% 100.00%
  10. 10. SALIENT FEATURES • FIRR 8.12% • EIRR The EIRR (without taxes) in economic terms works out to be 19.43 % for the project
  11. 11. SALIENT FEATURES • Web Portal being designed • State Data Centre to host data • Plans to make LMRC an e-office
  12. 12. WAY FORWARD  Techno-feasibility study  Techno-feasibility study for following routes is to be done by DMRC: Mill Road- Tulsidas Marg- Subhash Marg  Ring Rail- First Phase (Approx. 42 KM)  Gomti Nagar
  13. 13. WAY FORWARD  Enactment of Metro Acts Central Metro Acts for construction, operation and maintenance of Lucknow Metro Rail Project extended to “Lucknow Metropolitan Area” by MoUD.  Depot  Government land identified on Kanpur Road; in process of being transferred.
  14. 14. WAY FORWARD  Formation of SPV  ‘Lucknow Metro Rail Corporation’ (LMRC) incorporated under Companies Act.  Authorised share capital – Rs 2000 cr.  No. of Directors: 14 (incl. 4 functional)  50:50 equity sharing by GoI and GoUP.
  15. 15. WAY FORWARD  Funding of SPV  Funding through Central and State equity and loaning from multilateral agencies.  Initial funds (Innovative financing) by LDA - 100 Cr.  UPAVP – 200 Cr.  UPSIDC - 50 Cr.  State Govt to provide equity
  16. 16. WAY FORWARD  Logo for SPV  Active public participation for designing the ‘logo’ for LMRC. Overwhelming response with over 3,000 entries and 1,500 mails.  The best logo will be awarded.  The selection process in on, and the final logo will be unveiled soon.
  17. 17. WAY FORWARD  Administration of SPV  Modern office of Metro Cell/ LMRC functional in Janpath Market, Hazratganj with 3400 sq.ft. of floor space.
  18. 18. WAY FORWARD  Initial Organizational Structure of SPV  Following sections are to be created initially : Administration/HR  Finance  Land Acquisition/ Revenue  Project Implementation  Landuse Planning  Public Relations  Legal  Company Secretary
  19. 19. Thank you

×