Establishing Central Energy Data Repository #EnergyEfficiency #PATScheme

0

Share

Download to read offline

Reporting, Monitoring and Verification under #PATScheme should be made faceless. This would be the step in the right direction. Focus should be on empowerment and not just emapanelment.

Related Books

Free with a 30 day trial from Scribd

See all

Establishing Central Energy Data Repository #EnergyEfficiency #PATScheme

  1. 1. EMBRACE DATA. ESTABLISH CENTRAL ENERGY DATA REPOSITORY. @UmeshBhutoria EMPOWERMENT, NOTEMPANELMENT SHOULDBETHEWAYFORWARD!
  2. 2. 478 700+ No of DCs in Phase 1 Expected No of DCs in Phase 2
  3. 3. 3 LACS $2 M USD Average Cost Incurred by each DC for M&V Total cost expected to be incurred by DCs for M&V
  4. 4. WILL HISTORY REPEAT ITSELF? Questions were raised on "standards" followed during baseline audits and many believe that M&V audits have not really happened the way they were supposed too.
  5. 5. IS THERE A WAY OUT? Empowerment, not Empanelment is the way ahead! India needs to establish a Central Energy Data Repository, perhaps PAT.NET needs to head in that direction. Reporting, Monitoring and Verification needs to be faceless!
  6. 6. YOUR THOUGHTS?

×