Successfully reported this slideshow.
Your SlideShare is downloading. ×

Hands-On at ISEP DEI | 9th of Apr 2016

Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Loading in …3
×

Check these out next

1 of 13 Ad

More Related Content

Similar to Hands-On at ISEP DEI | 9th of Apr 2016 (20)

More from Eduardo Ribeiro (14)

Advertisement

Recently uploaded (20)

Hands-On at ISEP DEI | 9th of Apr 2016

  1. 1. Hands-On by Eduardo Ribeiro V 1.0
  2. 2. edu.f.ribeiro@gmail.com @edu_f_ribeiro
  3. 3. Company X •  Company X is struggling to deliver what the costumer really wants. Nevertheless, their pace and quality for the delivered products is low. •  The bigger issue is regarding their Stakeholders. They lost their trust on the teams since they are always missing the deliveries (target dates).
  4. 4. Closer look •  Releases are made every quarter and some Lmes they need to rollback due to the number of defects. •  Before every release they assign all the QA’s during two weeks to validate the build leaving all the teams without QA’s. •  Product push all their requests to the teams. •  Due to the constant delay, teams change size oTen to respond to the bad planning. •  Some Lme there are implementaLons that are not accordantly with what was requested. •  As we speak there is allot of tension between everyone creaLng each day more noise and bad behaviors.
  5. 5. My way •  Training and Coaching to the teams and stakeholders about Lean Agile. •  Improve their collaboraLon and communicaLon. •  Strive for MVP. •  High Backlog Quality. •  Limit the work In- •  Fix and self-organized teams. •  ConLnuous IntegraLon and Delivery to allow more frequent and small releases.
  6. 6. QuesLons?
  7. 7. Thank You!

×