The loft at tobin lake

  1. 1. The Loft at Tobin Lake<br />
  2. 2. 2008<br />
  3. 3. 2009<br />
  4. 4. 2010<br />Ready to start<br />
  5. 5. The walls are built<br />
  6. 6. The walls are up<br />
  7. 7. Time to cutout the windows and doors<br />
  8. 8. Windows, doors, and corner posts<br />
  9. 9. Hip rafters are up (whew!)<br />
  10. 10. Half rafters, creepers, and fascia (whew!! again)<br />
  11. 11. Half rafters, creepers, and some nogging<br />
  12. 12. Half rafters, creepers, and all the nogging<br />
  13. 13. Sheeting is half done <br />
  14. 14. Sheeting is done <br />
  15. 15. Still a little airy <br />
  16. 16. Windows, and doors are in…<br />
  17. 17. …and shingles are done! <br />
  18. 18. End of season 2010 Looking good <br />
  19. 19. Electrical is done <br />
  20. 20. Walls are insulated…<br />
  21. 21. …and now they’re covered.<br />
  22. 22. Ceiling is insulated…<br />
  23. 23. …and now it’s covered. Looking good!<br />
  24. 24. The floor is down<br />
  25. 25. Furniture and window covering<br />
  26. 26. Log siding is going on…<br />More to come!<br />

×