Sunset Cove Restoration Update
and Stakeholder Advocacy
Sunset Cove
 12 acre site
 Spectacular views of Jamaica Bay and NYC
 Located at extreme south end of Broad Channel
 NY...
History
 Small Marina since the 40’s
 Marina greatly expanded thru illegal fill in 1970’s and
80’s.
 Court action at bo...
History
 Broad Channel Civic Association led effort
to have area deeded to NYC Parks.
 Worked thru Councilman Ulrich’s o...
Sunset Cove 2006
Sunset Cove 2013
DOI grant effort Post Sandy
 Effort led by Broad Channel Civic Association
 Letters of support obtained from
 Senator S...
Dept of Interior Grant
awarded for 4.8 Million
Partners
 NYC Parks
 NYC DEP
 NYS DEC
 National Parks Service
 Jamaica Bay Ecowatchers
 American Littoral Society
Features of Project:
 • Restoration of approximately 4 acres of low marsh.
 • Restoration of approximately 0.5 acres of ...
Phase 1 funding
 NEWIPCC EPA Grant - $60,000
 State EPF Grant - $50,000
 DOI NFWF Grant - $4,850,000
 DEC Mitigation P...
Phase 2 Funding--
 Total final cost estimate $ 1.8 Million
 Funding Sources--
◦ Broad Channel CRZ NY Rising- -----$500,0...
Funding shortfall
 Project out for bid in May 2017
 Minimum bid received 7 million short
 Project in Jeopardy and DOI F...
Press Conference-
October 6th
Sunset Cove Revised
Time Frame
 Phase 1—Funded/Design Completed Contractor
identified /Construction to start Spring 2018
...
Site plan
North site Plan with eco dock
Boardwalk and Entrance to
Park –Phase 2
u
Boardwalk design using restored
lumber from Rockaway
Boardwalk
Shade features
SUNSET COVE
Wetlands Experience
Learning/Research
Solstice Markers
Sunset at the Cove
Sunset cove restoration project -update
Sunset cove restoration project -update
You’ve finished this document.
Download and read it offline.
Upcoming SlideShare
Jamaica Bay Rockaway Parks Conservancy Update
Next
Upcoming SlideShare
Jamaica Bay Rockaway Parks Conservancy Update
Next
Download to read offline and view in fullscreen.

Share

Sunset cove restoration project -update

Download to read offline

Update on the Sunset Cove Restoration Project including additional Funding received and new design element

Related Books

Free with a 30 day trial from Scribd

See all

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

Sunset cove restoration project -update

  1. 1. Sunset Cove Restoration Update and Stakeholder Advocacy
  2. 2. Sunset Cove  12 acre site  Spectacular views of Jamaica Bay and NYC  Located at extreme south end of Broad Channel  NYC Parks land adjacent to NPS wetlands  Wetland cove and upland area  Unique Opportunity to restore Degraded shoreline area  NEXT MAJOR RESTORATION PROJECT TO BEGIN IN JAMAICA BAY
  3. 3. History  Small Marina since the 40’s  Marina greatly expanded thru illegal fill in 1970’s and 80’s.  Court action at both state and Federal level  Resulted in 1998 decision to reduce size  2008 decision for additional violations led to state acquisition  2008 Land put under jurisdiction of NYC DCAS
  4. 4. History  Broad Channel Civic Association led effort to have area deeded to NYC Parks.  Worked thru Councilman Ulrich’s office to have transferred to NYC Parks in 2009  BCCA passed unanimous resolution in February of 2010 endorsing wetlands restoration, upland forest, walking trails, boardwalk plan.  BCCA plan submitted to NYC PARKS RFEI— only plan submitted
  5. 5. Sunset Cove 2006
  6. 6. Sunset Cove 2013
  7. 7. DOI grant effort Post Sandy  Effort led by Broad Channel Civic Association  Letters of support obtained from  Senator Schumer ***  Congressman Meeks  Congressman Jeffries  State Senator Addabbo  Assemblyman Goldfeder  Councilman Ulrich Federal lobbying coordinated with Harbor Coalition
  8. 8. Dept of Interior Grant awarded for 4.8 Million
  9. 9. Partners  NYC Parks  NYC DEP  NYS DEC  National Parks Service  Jamaica Bay Ecowatchers  American Littoral Society
  10. 10. Features of Project:  • Restoration of approximately 4 acres of low marsh.  • Restoration of approximately 0.5 acres of high marsh.  • Restoration of approximately 4 acres of scrubland.  • Restoration of approximately 3.5 acres of coastal forest.  • Restoration of approximately 1,000 linear feet of upland perimeter.  • Construction of boardwalk, outdoor classroom and perimeter walking trail/Berm and Eco-dock for student use .
  11. 11. Phase 1 funding  NEWIPCC EPA Grant - $60,000  State EPF Grant - $50,000  DOI NFWF Grant - $4,850,000  DEC Mitigation Payments  Transco Williams - $500,000  Dept of Sanitation - $750,000  NYCDOT - $990,000  DPR - $70,000 (Beach 108 Bulkhead Project)  DEP Design Contribution - $50,000  Total original Funding expectation- $7,320,000
  12. 12. Phase 2 Funding--  Total final cost estimate $ 1.8 Million  Funding Sources-- ◦ Broad Channel CRZ NY Rising- -----$500,000 ◦ Queens Borough President Melinda Katz--$1,000,000 ◦ Assemblywoman Amato - $125,000 ◦ State Senator Addabbo--$ 175,000 ◦ Broad Channel Civic thru Participatory Budget-$200,00  * all design costs for Louis Berger firm from NY Rising
  13. 13. Funding shortfall  Project out for bid in May 2017  Minimum bid received 7 million short  Project in Jeopardy and DOI Funding  Ecowatchers and BCCA lobby Mayors office  Elected officials lend full support  Worked with Offic of Resiliency  October 6th Funding received from Mayors Office
  14. 14. Press Conference- October 6th
  15. 15. Sunset Cove Revised Time Frame  Phase 1—Funded/Design Completed Contractor identified /Construction to start Spring 2018  Total---$16,320,000  Phase 2- funding in Place/Design underway by Louis Berger/ Construction Spring 2019  Total funds---$1,800,000
  16. 16. Site plan
  17. 17. North site Plan with eco dock
  18. 18. Boardwalk and Entrance to Park –Phase 2
  19. 19. u
  20. 20. Boardwalk design using restored lumber from Rockaway Boardwalk
  21. 21. Shade features
  22. 22. SUNSET COVE
  23. 23. Wetlands Experience
  24. 24. Learning/Research
  25. 25. Solstice Markers
  26. 26. Sunset at the Cove

Update on the Sunset Cove Restoration Project including additional Funding received and new design element

Views

Total views

856

On Slideshare

0

From embeds

0

Number of embeds

0

Actions

Downloads

4

Shares

0

Comments

0

Likes

0

×