Project Metrics and Goals
SUNSET COVE | Project Information
5.
SUNSET COVE | Budget
Budget
Phase 1 NFWF/Mitigation Funded: $6.5M
• Contaminated fill removal: $2.9M
• Clean sand placement and grading: $2M
• Wetland and maritime forest/shrubland restoration: $1.3M
• Trail and overlooks: $300K
Phase 2 NY Rising Funded: $500K
• Oyster habitat and boardwalk construction
Cost estimates are preliminary and based on costs at similar sites.
Costs associated with environmental
mitigation may change depending on types and levels of contaminants
found.
6.
SUNSET COVE | Conceptual Plan
LOW MARSH
HIGH MARSH
UPLAND
GRASSLAND
NPS PROPERTY LINE
PROJECT LIMITS
UPLAND BERM
EXISTING BULKHEAD
PROPOSED BOARDWALK
PROPOSED OVERLOOK
PATHWAY