  1. 1. Sunset Cove Salt Marsh and Coastal Upland Restoration Conceptual Plan Presentation
  2. 2. SUNSET COVE | Location Map
  3. 3. SUNSET COVE | Location Map
  4. 4. Project Metrics and Goals SUNSET COVE | Project Information
  5. 5. SUNSET COVE | Budget Budget Phase 1 NFWF/Mitigation Funded: $6.5M • Contaminated fill removal: $2.9M • Clean sand placement and grading: $2M • Wetland and maritime forest/shrubland restoration: $1.3M • Trail and overlooks: $300K Phase 2 NY Rising Funded: $500K • Oyster habitat and boardwalk construction Cost estimates are preliminary and based on costs at similar sites. Costs associated with environmental mitigation may change depending on types and levels of contaminants found.
  6. 6. SUNSET COVE | Conceptual Plan LOW MARSH HIGH MARSH UPLAND GRASSLAND NPS PROPERTY LINE PROJECT LIMITS UPLAND BERM EXISTING BULKHEAD PROPOSED BOARDWALK PROPOSED OVERLOOK PATHWAY PROPOSED TIDAL CHANNEL
  7. 7. SUNSET COVE | Conceptual Plan
  8. 8. SUNSET COVE | Location Map Tidal Channel and Bulkhead PRIMARY TIDAL CHANNEL SECONDARY CHANNEL NPS BULKHEAD
  9. 9. SUNSET COVE | Conceptual Plan
  10. 10. SUNSET COVE | Conceptual Plan Park Entrance PARK ENTRANCE UPLAND HIGH MARSH NPS PROPERTY LINE BERM AND PATHWAY
  11. 11. SUNSET COVE | Conceptual Plan
  12. 12. SUNSET COVE | Conceptual Plan OYSTER COVE Oyster Cove BOARDWALK/OUTDOOR CLASSROOM BERM AND PATHWAY