  1. 1. 1 Spring Creek South HMGP Project Update Presentation to Jamaica Bay Task Force May 9, 2019
  2. 2. 2 Location: NPS Gateway Jamaica Bay Unit – Spring Creek
  3. 3. 3 Recent Activity Phase I: Engineering & Design o 30-day EA public comment period completed (Oct. ′18) o FONSI issued by FEMA (Oct. ′18) o Minor redesign elements
  4. 4. 4 Recent Activity Phase I: Engineering & Design o Final Phase 1 deliverables submitted to DHSES/FEMA (Dec. ′18)  Project summary  EA  Engineering analysis  Designs & Specs  Costs / BCR  Permitting package
  5. 5. 5 Recent activity: Final design
  6. 6. 6 Recent activity: Final design
  7. 7. 7 Recent activity: Final design
  8. 8. 8 FEMA Response Phase I: Request for Information o Engineering analysis of flood reduction v. storm surge o Studies of neighboring and Jamaica Bay-wide projects o Documentation of future protection provided by Belt & CBB o Examination of induced flooding in adjacent areas o Re-calculation of damages & benefits
  9. 9. 9 Contacts Joanna Field Project POC, DEC Region 2 joanna.field@dec.ny.gov 718-482-4057 Connect with us: www.dec.ny.gov/about/104426.html Facebook: www.facebook.com/NYSDEC Twitter: twitter.com/NYSDEC Flickr: www.flickr.com/photos/nysdec

Editor's Notes


  • Shellbank Basin & Belt Parkway remain source of flooding
    Coordinating with other agencies to maximize protection
    Budget escalation: $75MM, but no relative increase in damages
    Reviewing for cost-saving opportunities
    Uncertain feasibility of complementary projects
    Looking for long-term, JB-wide solutions
    CSRM focus
    Highlighting other resilience features

×