Location: NPS Gateway Jamaica Bay Unit –
Spring Creek
3
Recent Activity
Phase I: Engineering & Design
o 30-day EA public comment period completed (Oct.
′18)
o FONSI issued by F...
4
Recent Activity
Phase I: Engineering & Design
o Final Phase 1 deliverables submitted to
DHSES/FEMA (Dec. ′18)
 Project ...
5
Recent activity: Final design
6
Recent activity: Final design
7
Recent activity: Final design
8
FEMA Response
Phase I: Request for Information
o Engineering analysis of flood reduction v. storm
surge
o Studies of nei...
9
Contacts
Joanna Field
Project POC, DEC Region 2
joanna.field@dec.ny.gov
718-482-4057
Connect with us:
www.dec.ny.gov/abo...
You’ve finished this document.
Download and read it offline.
Upcoming SlideShare
What to Upload to SlideShare
Next
Upcoming SlideShare
What to Upload to SlideShare
Next
Download to read offline and view in fullscreen.

Share

Spring Creek South Update

Download to read offline

an update by the NYS DEC on the proposal for Spring Creek South HMP

Related Books

Free with a 30 day trial from Scribd

See all

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

Spring Creek South Update

  1. 1. 1 Spring Creek South HMGP Project Update Presentation to Jamaica Bay Task Force May 9, 2019
  2. 2. 2 Location: NPS Gateway Jamaica Bay Unit – Spring Creek
  3. 3. 3 Recent Activity Phase I: Engineering & Design o 30-day EA public comment period completed (Oct. ′18) o FONSI issued by FEMA (Oct. ′18) o Minor redesign elements
  4. 4. 4 Recent Activity Phase I: Engineering & Design o Final Phase 1 deliverables submitted to DHSES/FEMA (Dec. ′18)  Project summary  EA  Engineering analysis  Designs & Specs  Costs / BCR  Permitting package
  5. 5. 5 Recent activity: Final design
  6. 6. 6 Recent activity: Final design
  7. 7. 7 Recent activity: Final design
  8. 8. 8 FEMA Response Phase I: Request for Information o Engineering analysis of flood reduction v. storm surge o Studies of neighboring and Jamaica Bay-wide projects o Documentation of future protection provided by Belt & CBB o Examination of induced flooding in adjacent areas o Re-calculation of damages & benefits
  9. 9. 9 Contacts Joanna Field Project POC, DEC Region 2 joanna.field@dec.ny.gov 718-482-4057 Connect with us: www.dec.ny.gov/about/104426.html Facebook: www.facebook.com/NYSDEC Twitter: twitter.com/NYSDEC Flickr: www.flickr.com/photos/nysdec

an update by the NYS DEC on the proposal for Spring Creek South HMP

Views

Total views

214

On Slideshare

0

From embeds

0

Number of embeds

0

Actions

Downloads

0

Shares

0

Comments

0

Likes

0

×