Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Spring Creek South Update

51 views

Published on

an update by the NYS DEC on the proposal for Spring Creek South HMP

Published in: Environment
  • Be the first to comment

  • Be the first to like this

Spring Creek South Update

  1. 1. 1 Spring Creek South HMGP Project Update Presentation to Jamaica Bay Task Force May 9, 2019
  2. 2. 2 Location: NPS Gateway Jamaica Bay Unit – Spring Creek
  3. 3. 3 Recent Activity Phase I: Engineering & Design o 30-day EA public comment period completed (Oct. ′18) o FONSI issued by FEMA (Oct. ′18) o Minor redesign elements
  4. 4. 4 Recent Activity Phase I: Engineering & Design o Final Phase 1 deliverables submitted to DHSES/FEMA (Dec. ′18)  Project summary  EA  Engineering analysis  Designs & Specs  Costs / BCR  Permitting package
  5. 5. 5 Recent activity: Final design
  6. 6. 6 Recent activity: Final design
  7. 7. 7 Recent activity: Final design
  8. 8. 8 FEMA Response Phase I: Request for Information o Engineering analysis of flood reduction v. storm surge o Studies of neighboring and Jamaica Bay-wide projects o Documentation of future protection provided by Belt & CBB o Examination of induced flooding in adjacent areas o Re-calculation of damages & benefits
  9. 9. 9 Contacts Joanna Field Project POC, DEC Region 2 joanna.field@dec.ny.gov 718-482-4057 Connect with us: www.dec.ny.gov/about/104426.html Facebook: www.facebook.com/NYSDEC Twitter: twitter.com/NYSDEC Flickr: www.flickr.com/photos/nysdec

×