  1. October, 2015 Elizabeth Jordan, Natural Resources Group Located off of West 19th Road and Cross Bay Blvd, Broad Channel, Borough of Queens SUNSET COVE SALT MARSH RESTORATION
  2. 1994 SHEET 2 / 15 SUNSET COVE SALT MARSH RESTORATION | History
  3. SHEET 3 / 15 SUNSET COVE SALT MARSH RESTORATION | Project Goals GOALS • Restore 3 to 5 acres of salt marsh and 7 to 9 acres of coastal upland • Increase storm resiliency and wave attenuation with a +8.5 NAVD berm • Provide an opportunity for education and community involvement • Increase the health of Jamaica Bay TOTAL BUDGET: Phase 1 - $7 million DOI-NFWF Grant and DEC Mitigation funding Phase 2 - $500,000 NY Rising PROJECT SIZE: 12 ac
  4. WETLAND CATEGORIES HIGH MARSH NATIONAL WETLANDS INVENTORY INTERMEDIATE MARSH SUNSET COVE SHEET 4 / 15 0’ 10’ 20’ N SUNSET COVE SALT MARSH RESTORATION | Regulated Wetlands
  5. WETLAND CATEGORIES HIGH MARSH NATIONAL WETLANDS INVENTORY INTERMEDIATE MARSH SUNSET COVE 0’ 10’ 20’ N SHEET 5 / 15 SUNSET COVE SALT MARSH RESTORATION | National Wetland Inventory
  6. DEBRIS ALONG NORTHERN SHORELINE PAVING AT PROPOSED TIDAL CHANNEL MOUTH SHEET 6 / 15 SUNSET COVE SALT MARSH RESTORATION | Existing Conditions
  7. SITE BOUNDARY EXISTING BULKHEAD JAMAICA BAY SHORELINE DEBRIS NPS PROPERTY LINE VARIOUS DEBRIS PILES SITE ENTRANCE SPARTINA TO BE PROTECTED PANICUM TO BE PROTECTED 0’ 80’ 160’ N SHEET 7 / 15 SUNSET COVE SALT MARSH RESTORATION | Site Analysis
  8. LEGEND HAZARDOUS SOIL REMOVAL SOIL BORING CONTAMINATED SOIL REMOVAL NPS PROPERTY LINE SHEET 8 / 15 0’ 80’ 160’ N SUNSET COVE SALT MARSH RESTORATION | Soil Removal
  9. FRESHWATER WETLAND BERM WITH PEDESTRIAN PATH GRASSLAND LOW MARSH UPLAND HIGH MARSH SECONDARY CHANNEL SHORELINE AREA PARK ENTRANCE TIDAL CHANNEL MOUTH OVERLOOK OVERLOOK WITH BENCH SHEET 9 / 15 SUNSET COVE SALT MARSH RESTORATION | Schematic Plan 0’ 80’ 160’ N
  10. SHEET 10 / 32 0’ 10’ 20’ N SUNSET COVE SALT MARSH RESTORATION | Site Section 2 SECTION B SCALE: HORIZONTAL 1" = 20', VERTICAL 1" = 4' PLAN SCALE: 1" = 20' MM/DD/YY DEFAULTXX
  11. 0’ 10’ 20’ N SHEET 11 / 32 SUNSET COVE SALT MARSH RESTORATION | Site Section 2 SECTION B SCALE: HORIZONTAL 1" = 20', VERTICAL 1" = 4' PLAN SCALE: 1" = 20' MM/DD/YY DEFAULTXX
  12. LOW MARSH / S. alternaflora HIGH MARSH / J. gerardii HIGH MARSH / S. patens HIGH MARSH / D. spicata HIGH MARSH / S. subulatum UPLAND / P. virgatum UPLAND / B. tinctoria UPLAND / L. japonica UPLAND / C. gravii UPLAND / P. quinquefolia SUNSET COVE SALT MARSH RESTORATION | Plant Palette SHEET 12 / 15
  13. Soundview Salt Marsh Restoration SHEET 13 / 15 SUNSET COVE SALT MARSH | Inspiration