The Kawabegawa dam project in Kumamoto prefecture, Japan was originally planned in 1966 but has faced significant opposition and delays. While some villagers agreed to relocate due to government pressure, farmers later appealed and won a lawsuit against the government in 2003 for lack of information about project costs and benefits. Construction is 70% complete but the dam gate has not started due to concerns about the project's impact on the environment and livelihoods. Local groups continue to campaign against the dam, seeing it as an example of wasteful public spending.
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
Kawabegawa Dam Project Opposition
1. By Yu Terashima
Project Description
The Kawabegawa dam project was officially planned in 1966. The dam is situated
in Kuma county, Kumamoto prefecture which is in the southwest of Japan. At the
beginning, an opposition movement had broken out at Itsuki village, where will be
submerged by the dam, however, it accepted the plan under governmental pressure.
The Villagers started to move to a neighborhood or a substituted new village.
However, the completion of the project is far behind the construction schedule the
government promised in return for the village's agreement with the project.
The government provided only information about the project's supposed benefits,
but not about the damage to the environment and the ecology system. As the dam
issue became large, people got to know the negative aspects of the project: the
damage to creatures to creatures and failure of benefit. Farmers' and
fishermen's voice of anti-dam also encouraged the campaign against the project.
Because of a refuse of compensation by fishermen and some land owners on the
project site, the government started a procedure to compulsory purchase of the
land ownership and the fisheries rights, which is called “Kyosei Shuyo” in Japanese,
in 2002.
Because of the lack of providing genuine information of their charges and the
government's wrong expectation of agriculture, farmers who demanded the
revocation of the irrigation project using water from the dam appealed against the
government in 1998 and won the suit completely in 2003. As a result, some
changes to the project plan are needed, and the government suspended the
procedure of compulsory purchase from October, 2003 until the time of completion
of new irrigation plan in 2004.
70 % of the project has completed already, but the construction of the dam gate
has not started yet. Most of the submergence villagers in Itsuki village have
finished to move out. Only two families live in the center of the site against the
project.
*Purpose: flood control, irrigation, hydroelectric power generation (16,500kw)
*Reservoir water: 133 million km3
*Feature of the gate: height 107.5m, width: 274m, an arch dam
*Submergence area: 391 hectares
2. *Transfer residents: 528 households in Itsuki and
Sagara village finished to move except 2 households in the central Itsuki village.
Main concerns of the project:
1) The failure of aims of project
-flood control: possibility of flood by the construction of dam; need of afforestation
for flood control; existence of an alternative plan by citizens
-Irrigation: “No need for the water from dam."
More than half of the farmers who are supposed to benefit opposed to the project
and filed a suit for its illegality against the government in 1998. Farmers won the
suit perfectly in May, 2003.
-Hydroelectric power generation: too little amount of electric power
2)Negative impact to fishery
3)Destruction of rich natural environment
4)Lack of participation of the residents and disclosure of information
5)Unnecessary submergence, destruction of livelihood in the traditional village
6)Indebtedness in the future
Remarkable aspects:
Building of a wide networking and cooperation among people supposed to be
■
affected: local inhabitants, farmers, fishermen, NGOs, groups from other areas
suffering from the same problems, specialists, including those who are supposed to
be beneficiaries.
A number of fishermen stand against the project worrying about a deterioration
■
of quality and a decrease of a catch of Ayu. The Cooperative Association of Kuma
River Fishermen of 2000 membership continues to refuse the compensation in
exchange for extinction and damages of eternal fishery in the river Kawabegawa,
with the objection by more than half of the members.
3. Anti-Kawabegawa dam movement is getting to be known as a symbol of the
■
useless public works and waste of budget or taxes.
Use of internet as a tool of campaign and an independent media -An NGO holds
■
a mailing list. More than 600 members throughout Japan join the mailing list and
exchange information and discuss the strategy.
Application of law system - suit against the government by supposed benefit
■
farmers - Administrative litigation and farmers' win in 2003
role of local government - Kumamoto prefecture, the local government, used to
■
promote the project and urge submergence people in Itsuki village to agree to the
project after the plan released by the central government, but it is changing its
view for the project quite recently. The prefecture is taking a new role of an
adjustment between local residents and the central government by holding a
residents discussion meeting (open forum) as a place to fulfill accountability of the
prefecture as well as participating in a decision work of the new irrigation plan
positively. Also the local government decided to decommition ARASE dam located
in the lower stream of the river Kawabegawa, because of strong voices of
fishermen at the dam site. This is the first case of decommition of dam in Japan.
CONTACT
Citizens for Saving
the River Kawabe
2-3-57 Hodakubo Kumamoto-citiy 862-0926 JAPAN
TEL : +81-96-349-8090
FAX : +81-96-349-8320
Email : kawabegawa@aminet.or.jp
Web : http://kawabegawa.jp