SlideShare a Scribd company logo
Service Repair Manual
Models
340F Excavator
Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR SGH
Configuration: 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
340F Excavator Machine Systems
Media Number -UENR6797-01 Publication Date -01/09/2015 Date Updated -21/12/2016
i05393341
Swing Drive - Disassemble
SMCS - 5459-015
S/N - DKF1-UP
S/N - RBC1-UP
S/N - SGH1-UP
S/N - ZBJ1-UP
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7573 Link Bracket 2
B 5P-5197 Retaining Ring Pliers As 1
Start By:
a. Remove the swing drive.
1. Position the swing drive onto suitable cribbing. The weight of the swing drive is
approximately 281 kg (620 lb).
2. Put an alignment mark on the cover and the housing of the swing drive for assembly
purposes.
1/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 1 g02115775
3. Attach Tooling (A) and a suitable lifting device to cover (2). The weight of cover (2) is
approximately 23 kg (51 lb). Remove bolts (1) and cover (2).
Illustration 2 g02115813
4. Remove sun gear (3) and spacer (4).
5. Use two people in order to remove carrier assembly (5). The weight of carrier assembly (5)
is approximately 23 kg (50 lb).
Illustration 3 g02115814
2/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Drive spring pin (10) into planetary shaft (6) with a suitable hammer and a suitable punch.
7. Remove planetary shaft (6), thrust washer (7), thrust washer (11), planetary gear (9), and
bearing assembly (8) from the carrier assembly.
8. Remove spring pin (10) from planetary shaft (6) with a suitable hammer and a suitable
punch.
9. Repeat Step 6 through Step 8 in order to remove the other three planetary gears from the
carrier assembly.
Illustration 4 g02115853
10. Remove retaining ring (12) and sun gear (14) from the carrier.
11. Remove retaining ring (13) from sun gear (14).
Illustration 5 g02115915
3/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 6 g02115916
12. Remove spacer (16).
13. Remove retaining ring (15) that holds carrier assembly (17) in position.
14. Use a suitable piece of steel bar stock between the planetary gears in carrier assembly (17).
Make sure that the steel bar stock is centered in carrier assembly (17). Attach a suitable
lifting device to the steel bar stock. Slowly lift carrier assembly (17) from the swing drive
housing. The weight of carrier assembly (17) is approximately 39 kg (86 lb).
Illustration 7 g02115917
15. Drive spring pin (22) into planetary shaft (19) with a suitable hammer and a suitable punch.
16. Remove planetary shaft (19), thrust washer (18), thrust washer (23), planetary gear (21), and
bearing assemblies (20) from the carrier assembly.
17. Remove spring pin (22) from planetary shaft (19) with a suitable hammer and a suitable
punch.
18. Repeat Step 15 through Step 17 in order to remove the other three planetary gears from the
carrier assembly.
4/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 8 g02115919
19. Attach Tooling (A) and a suitable lifting device to ring gear (24). The weight of ring gear
(24) is approximately 39 kg (86 lb). Remove ring gear (24).
Illustration 9 g02116593
20. Use Tooling (B) in order to remove retaining ring (25).
Illustration 10 g03409949
5/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 11 g03409942
21. Attach Tooling (A) and a suitable lifting device to swing drive housing (26). Position swing
drive housing (26) in a suitable press. The combined weight of swing drive housing (26),
the pinion shaft, and the bearing cage is approximately 136 kg (300 lb).
22. Position suitable cribbing directly under the pinion shaft in order to prevent the pinion shaft
from falling when pressed out.
23. Remove pinion shaft (28) and spacer (27) from swing drive housing (26).
6/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 12 g03410004
24. Put an alignment mark on cage (30) and swing drive housing (26) for assembly purposes.
25. Remove bolts (29) that secure cage (30) to the swing drive housing. Remove cage (30), O-
ring seal (31), and bearing (33).
26. Remove lip seals (28) from cage (30).
Illustration 13 g03410014
27. Remove bearing (34) from swing drive housing (26).
7/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR SGH
Configuration: 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
340F Excavator Machine Systems
Media Number -UENR6797-01 Publication Date -01/09/2015 Date Updated -21/12/2016
i06272523
Swing Drive - Disassemble
SMCS - 5459-015
S/N - EAR1-UP
S/N - SGH1-UP
S/N - YBF1-UP
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 439-3938 Link Bracket 2
Start By:
a. Remove the swing drive.
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the
component should be thoroughly cleaned. This will prevent dirt from entering the internal
mechanism.
NOTICE
Keep all parts clean from contaminants.
Contamination of the hydraulic system with foreign material will
reduce the service life of the hydraulic system components.
1/7
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
To prevent contaminants from entering the hydraulic system, always
plug or cap the lines, fittings, or hoses as they are disconnected. Cover
any disassembled components and clean them properly before
assembly.
Clean the hydraulic system properly after any major component
exchange or especially after a component failure, to remove any
contamination.
1. Position the swing drive onto suitable cribbing. The weight of the swing drive is
approximately 514 kg (1133 lb).
2. Put an alignment mark on the cover and the housing of the swing drive for assembly
purposes.
Illustration 1 g02115775
3. Attach Tooling (A) and a suitable lifting device to cover (2). The weight of cover (2) is
approximately 23 kg (51 lb). Remove bolts (1) and cover (2).
Illustration 2 g03879823
4. Remove sun gear (3) and spacer (4).
2/7
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Use two people to remove carrier assembly (5). The weight of carrier assembly (5) is
approximately 23 kg (50 lb).
Illustration 3 g03879897
6. Remove retaining ring (6).
7. Remove planetary shaft (10), thrust washer (7), thrust washer (11), planetary gear (8), and
bearing assembly (9) from the carrier assembly.
8. Repeat Step 4 through Step 7 to remove the other two planetary gears from the carrier
assembly.
Illustration 4 g03879903
9. Remove retaining ring (12) and sun gear (14) from the carrier.
10. Remove retaining ring (13) from sun gear (14).
3/7
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 5 g02115915
Illustration 6 g03879905
11. Remove spacer (16).
12. Remove retaining ring (15) that holds carrier assembly (17) in position.
13. Use a suitable piece of steel bar stock between the planetary gears in carrier assembly (17).
Make sure that the steel bar stock is centered in carrier assembly (17). Attach a suitable
lifting device to the steel bar stock. Slowly lift carrier assembly (17) from the swing drive
housing. The weight of carrier assembly (17) is approximately 70 kg (154 lb).
Illustration 7 g03879907
4/7
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Drive spring pin (22) into planetary shaft (19) with a suitable hammer and a suitable punch.
15. Remove planetary shaft (19), thrust washers (18), planetary gear (21), and bearing
assemblies (20) from the carrier assembly.
16. Remove spring pin (22) from planetary shaft (19) with a suitable hammer and a suitable
punch.
17. Repeat Step 14 through Step 16 to remove the other three planetary gears from the carrier
assembly.
Illustration 8 g03879916
Illustration 9 g03879914
18. Attach Tooling (A) and a suitable lifting device to ring gear (23). The weight of ring gear
(23) is approximately 60 kg (132 lb).
19. Remove bolts (24) and ring gear (23).
5/7
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 10 g02116593
20. Remove retaining ring (25).
Illustration 11 g03409949
Illustration 12 g03879933
21. Attach Tooling (A) and a suitable lifting device to swing drive housing (26). Position swing
drive housing (26) in a suitable press. The combined weight of swing drive housing (26),
the pinion shaft, and the bearing cage is approximately 292 kg (644 lb).
22. Position suitable cribbing directly under the pinion shaft to prevent the pinion shaft from
falling when pressed out.
6/7
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Remove pinion shaft (28) and spacer (27) from swing drive housing (26).
Illustration 13 g03879949
24. Put an alignment mark on cage (30) and swing drive housing (26) for assembly purposes.
25. Remove bolts (29) that secure cage (30) to the swing drive housing. Remove cage (30), O-
ring seal (31), and bearing (33).
26. Remove lip seals (32) from cage (30).
Illustration 14 g03410014
27. Remove bearing (34) from swing drive housing (26).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Dec 11 11:03:04 UTC+0800 2020
7/7
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR SGH
Configuration: 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
340F Excavator Machine Systems
Media Number -UENR6797-01 Publication Date -01/09/2015 Date Updated -21/12/2016
i03873519
Swing Drive - Assemble
SMCS - 5459-016
S/N - DKF1-UP
S/N - RBC1-UP
S/N - SGH1-UP
S/N - ZBJ1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7573 Link Bracket 2
B 5P-5197 Retaining Ring Pliers As 1
C 5P-3931 Anti-Seize Compound -
D 5P-0960 Grease Cartridge -
E 1U-8846 Gasket Sealant -
1/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 1 g02116597
Illustration 2 g02117257
1. Install lip seals (33) in cage (27), as shown. Apply Tooling (D) to the lips of lip seals (33).
Install O-ring seal (32).
Illustration 3 g02117583
Note: Do not damage the lip seals when cage (27) is installed over pinion shaft (31).
2. Apply Tooling (C) to the inside diameter and the outside diameter of bearing (30).
3. Lower the temperature of pinion shaft (31). Carefully install cage (27) over pinion shaft
(31). Use a suitable press in order to install roller bearing (30) on pinion shaft (31). Install
spacer (29).
2/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 4 g02117588
4. Attach Tooling (A) and a suitable lifting device to swing drive housing (28). The weight of
swing drive housing (28) is approximately 86 kg (190 lb). Position swing drive housing (28)
in a suitable press.
5. Position pinion shaft (31), cage (27), roller bearing (30), and spacer (29) as a unit in swing
drive housing (28). Use the suitable press in order to install pinion shaft (31), cage (27),
roller bearing (30), and spacer (29) as a unit. Make sure that the alignment marks that were
made on cage (27) and on swing drive housing (28) are in alignment.
6. Install bolts (26).
Illustration 5 g02117834
7. Reposition swing drive housing (28) with pinion shaft (31) upside-down. The combined
weight of swing drive housing (28), pinion shaft (31), and the cage is approximately 136 kg
(300 lb). Position the unit in a suitable press. Support the unit on the end of pinion shaft
(31).
8. Apply Tooling (C) to the inside diameter and the outside diameter of roller bearing (34).
Use a suitable sleeve and a suitable press in order to install roller bearing (34). Install roller
bearing (34).
3/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 6 g02116593
9. Use Tooling (B) to install retaining ring (25).
Illustration 7 g02115919
10. Attach Tooling (A) and a suitable lifting device to ring gear (24). Apply Tooling (E) to the
mating surface of ring gear (24) and the swing drive housing. Install ring gear (24).
Illustration 8 g02115917
Note: Make sure that the spring pin hole in planetary shaft (19) is aligned with the spring
pin hole in the carrier.
4/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Install bearing assemblies (20), planetary gear (21), thrust washer (18), thrust washer (23),
planetary shaft (19), and spring pin (22) into the carrier. Install spring pin (22) until spring
pin (22) is even with the outside surface of the carrier. Align the split in spring pin (22) to
the top or the bottom.
Illustration 9 g02117533
12. Make a stake mark on each side of the spring pin hole in the carrier, as shown. This will
prevent the spring pin from falling out of the spring pin hole. Make a stake mark at
Dimension (X). Dimension (X) is 1.5 mm (0.06 inch).
13. Repeat Step 11 through Step 12 in order to install the other three planetary gears in the
carrier assembly.
Illustration 10 g02115916
Illustration 11 g02115915
5/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Use a suitable piece of steel bar stock between the planetary gears in carrier assembly (17).
Make sure that the steel bar stock is centered in carrier assembly (17). Attach a suitable
lifting device to the suitable steel bar stock. The weight of carrier assembly (17) is
approximately 39 kg (86 lb). Carefully, lower carrier assembly (17) into position in the ring
gear.
15. Install retaining ring (15) that secures carrier assembly (17) in position.
16. Install spacer (16).
Illustration 12 g02115853
17. Install retaining ring (13) in sun gear (14).
18. Position sun gear (14) in the carrier and install retaining ring (12).
Illustration 13 g02115814
19. Install bearing assembly (8), planetary gear (9), thrust washer (7), thrust washer (11),
planetary shaft (6), and spring pin (10) in the carrier. Install spring pin (10) until spring pin
(10) is even with the outside surface of the carrier. Align the split in spring pin (10) to the
top or the bottom.
6/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 14 g02117533
20. Make a stake mark on each side of the spring pin hole in the carrier, as shown. This will
prevent the spring pin from falling out of the spring pin hole. Make a stake mark at
Dimension (X). Dimension (X) is 1.5 mm (0.06 inch).
21. Repeat Step 19 through Step 20 in order to install the other three planetary gears in the
carrier assembly.
Illustration 15 g02115813
22. Use two people in order to install carrier assembly (5). The weight of carrier assembly (5) is
approximately 23 kg (50 lb).
23. Install spacer (4) and sun gear (3).
Illustration 16 g02115775
7/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Apply Tooling (E) on the mating surfaces of the ring gear and cover (2). Attach Tooling (A)
and a suitable lifting device to cover (2). The weight of cover (2) is approximately 23 kg
(51 lb). Install cover (2).
25. Install bolts (1). Tighten bolts (1) to a torque of 270 ± 40 N·m (200 ± 30 lb ft).
End By:
a. Install the swing drive.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Dec 11 11:04:01 UTC+0800 2020
8/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 340F EXCAVATOR SGH
Configuration: 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine
Disassembly and Assembly
340F Excavator Machine Systems
Media Number -UENR6797-01 Publication Date -01/09/2015 Date Updated -21/12/2016
i06273870
Swing Drive - Assemble
SMCS - 5459-016
S/N - EAR1-UP
S/N - SGH1-UP
S/N - YBF1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 439-3938 Link Bracket 2
B - Loctite C5A Copper Anti-Seize -
C 452-6006 Grease -
D - Loctite 5188 -
1/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
Illustration 1 g02116597
Illustration 2 g02117257
1. Install lip seals (33) in cage (27), as shown. Apply Tooling (C) to the lips of lip seals (33).
Install O-ring seal (32).
Illustration 3 g02117583
Note: Do not damage the lip seals when cage (27) is installed over pinion shaft (31).
2. Apply Tooling (B) to the inside diameter and the outside diameter of bearing (30).
3. Lower the temperature of pinion shaft (31). Carefully install cage (27) over pinion shaft
(31). Use a suitable press to install roller bearing (30) on pinion shaft (31). Install spacer
(29).
2/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
Illustration 4 g02117588
4. Attach Tooling (A) and a suitable lifting device to swing drive housing (28). The weight of
swing drive housing (28) is approximately 148 kg (326 lb). Position swing drive housing
(28) in a suitable press.
5. Position pinion shaft (31), cage (27), roller bearing (30), and spacer (29) as a unit in swing
drive housing (28). Use the suitable press to install pinion shaft (31), cage (27), roller
bearing (30), and spacer (29) as a unit. Make sure that the alignment marks that were made
on cage (27) and swing drive housing (28) during the disassembly.
6. Install bolts (26).
Illustration 5 g02117834
7. Reposition swing drive housing (28) with pinion shaft (31) upside-down. The combined
weight of swing drive housing (28), pinion shaft (31), and the cage is approximately 292 kg
(644 lb). Position the unit in a suitable press. Support the unit on the end of pinion shaft
(31).
8. Apply Tooling (B) to the inside diameter and the outside diameter of roller bearing (34).
Use a suitable sleeve and a suitable press to install roller bearing (34). Install roller bearing
(34).
3/8
340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991...
2020/12/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...

More Related Content

More from dujdkksdmm

HITACHI ZAXIS 470LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 470LC-5G HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 470LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 470LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 870LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LC-5B HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 870LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 870LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LC-5G HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 870LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 850-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 850-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 850-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 850-3 EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 670LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LC-5G HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 670LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 670LCH-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LCH-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 670LCH-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LCH-3 EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 650LC-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 650LC-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 650LC-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 650LC-3 EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 470LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 470LC-5B HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 470LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 470LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 670LCR-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LCR-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 670LCR-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LCR-3 EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 670LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LC-5B HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 670LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 870LCH-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LCH-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 870LCH-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LCH-3 EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 870H-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870H-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 870H-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870H-3 EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 850LC-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 850LC-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 850LC-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 850LC-3 EXCAVATOR Operator manual.pdf
dujdkksdmm
 
HITACHI ZAXIS 330-3 Class Hydraulic EXCAVATOR Operator manual SN052046 and up...
HITACHI ZAXIS 330-3 Class Hydraulic EXCAVATOR Operator manual SN052046 and up...HITACHI ZAXIS 330-3 Class Hydraulic EXCAVATOR Operator manual SN052046 and up...
HITACHI ZAXIS 330-3 Class Hydraulic EXCAVATOR Operator manual SN052046 and up...
dujdkksdmm
 
HITACHI ZAXIS 270-3 Class Hydraulic EXCAVATOR Operator manual SN021321 and up...
HITACHI ZAXIS 270-3 Class Hydraulic EXCAVATOR Operator manual SN021321 and up...HITACHI ZAXIS 270-3 Class Hydraulic EXCAVATOR Operator manual SN021321 and up...
HITACHI ZAXIS 270-3 Class Hydraulic EXCAVATOR Operator manual SN021321 and up...
dujdkksdmm
 
HITACHI ZAXIS 200-3 Class Hydraulic EXCAVATOR Operator manual SN202803 and up...
HITACHI ZAXIS 200-3 Class Hydraulic EXCAVATOR Operator manual SN202803 and up...HITACHI ZAXIS 200-3 Class Hydraulic EXCAVATOR Operator manual SN202803 and up...
HITACHI ZAXIS 200-3 Class Hydraulic EXCAVATOR Operator manual SN202803 and up...
dujdkksdmm
 
HITACHI ZAXIS 180-3 Class Hydraulic EXCAVATOR Operator manual SN 010372 and u...
HITACHI ZAXIS 180-3 Class Hydraulic EXCAVATOR Operator manual SN 010372 and u...HITACHI ZAXIS 180-3 Class Hydraulic EXCAVATOR Operator manual SN 010372 and u...
HITACHI ZAXIS 180-3 Class Hydraulic EXCAVATOR Operator manual SN 010372 and u...
dujdkksdmm
 
HITACHI ZAXIS 120-3 Class Hydraulic EXCAVATOR Operator manual SN080001 and up...
HITACHI ZAXIS 120-3 Class Hydraulic EXCAVATOR Operator manual SN080001 and up...HITACHI ZAXIS 120-3 Class Hydraulic EXCAVATOR Operator manual SN080001 and up...
HITACHI ZAXIS 120-3 Class Hydraulic EXCAVATOR Operator manual SN080001 and up...
dujdkksdmm
 
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...
dujdkksdmm
 
Caterpillar Cat 390F Excavator (Prefix FEH) Service Repair Manual (FEH00001 a...
Caterpillar Cat 390F Excavator (Prefix FEH) Service Repair Manual (FEH00001 a...Caterpillar Cat 390F Excavator (Prefix FEH) Service Repair Manual (FEH00001 a...
Caterpillar Cat 390F Excavator (Prefix FEH) Service Repair Manual (FEH00001 a...
dujdkksdmm
 

More from dujdkksdmm (20)

HITACHI ZAXIS 470LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 470LC-5G HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 470LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 470LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 870LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LC-5B HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 870LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 870LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LC-5G HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 870LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 850-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 850-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 850-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 850-3 EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 670LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LC-5G HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 670LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LC-5G HYDRAULIC EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 670LCH-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LCH-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 670LCH-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LCH-3 EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 650LC-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 650LC-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 650LC-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 650LC-3 EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 470LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 470LC-5B HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 470LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 470LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 670LCR-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LCR-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 670LCR-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LCR-3 EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 670LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LC-5B HYDRAULIC EXCAVATOR Operator manual.pdfHITACHI ZAXIS 670LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 670LC-5B HYDRAULIC EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 870LCH-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LCH-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 870LCH-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870LCH-3 EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 870H-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870H-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 870H-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 870H-3 EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 850LC-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 850LC-3 EXCAVATOR Operator manual.pdfHITACHI ZAXIS 850LC-3 EXCAVATOR Operator manual.pdf
HITACHI ZAXIS 850LC-3 EXCAVATOR Operator manual.pdf
 
HITACHI ZAXIS 330-3 Class Hydraulic EXCAVATOR Operator manual SN052046 and up...
HITACHI ZAXIS 330-3 Class Hydraulic EXCAVATOR Operator manual SN052046 and up...HITACHI ZAXIS 330-3 Class Hydraulic EXCAVATOR Operator manual SN052046 and up...
HITACHI ZAXIS 330-3 Class Hydraulic EXCAVATOR Operator manual SN052046 and up...
 
HITACHI ZAXIS 270-3 Class Hydraulic EXCAVATOR Operator manual SN021321 and up...
HITACHI ZAXIS 270-3 Class Hydraulic EXCAVATOR Operator manual SN021321 and up...HITACHI ZAXIS 270-3 Class Hydraulic EXCAVATOR Operator manual SN021321 and up...
HITACHI ZAXIS 270-3 Class Hydraulic EXCAVATOR Operator manual SN021321 and up...
 
HITACHI ZAXIS 200-3 Class Hydraulic EXCAVATOR Operator manual SN202803 and up...
HITACHI ZAXIS 200-3 Class Hydraulic EXCAVATOR Operator manual SN202803 and up...HITACHI ZAXIS 200-3 Class Hydraulic EXCAVATOR Operator manual SN202803 and up...
HITACHI ZAXIS 200-3 Class Hydraulic EXCAVATOR Operator manual SN202803 and up...
 
HITACHI ZAXIS 180-3 Class Hydraulic EXCAVATOR Operator manual SN 010372 and u...
HITACHI ZAXIS 180-3 Class Hydraulic EXCAVATOR Operator manual SN 010372 and u...HITACHI ZAXIS 180-3 Class Hydraulic EXCAVATOR Operator manual SN 010372 and u...
HITACHI ZAXIS 180-3 Class Hydraulic EXCAVATOR Operator manual SN 010372 and u...
 
HITACHI ZAXIS 120-3 Class Hydraulic EXCAVATOR Operator manual SN080001 and up...
HITACHI ZAXIS 120-3 Class Hydraulic EXCAVATOR Operator manual SN080001 and up...HITACHI ZAXIS 120-3 Class Hydraulic EXCAVATOR Operator manual SN080001 and up...
HITACHI ZAXIS 120-3 Class Hydraulic EXCAVATOR Operator manual SN080001 and up...
 
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...
 
Caterpillar Cat 390F Excavator (Prefix FEH) Service Repair Manual (FEH00001 a...
Caterpillar Cat 390F Excavator (Prefix FEH) Service Repair Manual (FEH00001 a...Caterpillar Cat 390F Excavator (Prefix FEH) Service Repair Manual (FEH00001 a...
Caterpillar Cat 390F Excavator (Prefix FEH) Service Repair Manual (FEH00001 a...
 

Recently uploaded

Unlimited Short Call Girls Thane ✅ 9004268417 FULL CASH PAYMENT
Unlimited Short Call Girls Thane ✅ 9004268417 FULL CASH PAYMENTUnlimited Short Call Girls Thane ✅ 9004268417 FULL CASH PAYMENT
Unlimited Short Call Girls Thane ✅ 9004268417 FULL CASH PAYMENT
siqbal9337
 
7 QC Tools ppt for presentation for training purpose
7 QC Tools ppt for presentation for training purpose7 QC Tools ppt for presentation for training purpose
7 QC Tools ppt for presentation for training purpose
rakhidixit8
 
Call Girls Pune 7023059433 Vip Escorts Service in Pune
Call Girls Pune 7023059433 Vip Escorts Service in PuneCall Girls Pune 7023059433 Vip Escorts Service in Pune
Call Girls Pune 7023059433 Vip Escorts Service in Pune
rajni kaurn06
 
Automotive power train system- A final report
Automotive power train system- A final reportAutomotive power train system- A final report
Automotive power train system- A final report
KartikThakkar24
 
欧洲杯下注-欧洲杯下注下注app-欧洲杯下注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯下注-欧洲杯下注下注app-欧洲杯下注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯下注-欧洲杯下注下注app-欧洲杯下注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯下注-欧洲杯下注下注app-欧洲杯下注盘口app|【​网址​🎉ac22.net🎉​】
asjpkomrxo
 
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdfToyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
ssuser5e3aa3
 
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
pycfbo
 
Unlimited Short Call Girls Delhi ✅ 9711199012 FULL CASH PAYMENT
Unlimited Short Call Girls Delhi ✅ 9711199012 FULL CASH PAYMENTUnlimited Short Call Girls Delhi ✅ 9711199012 FULL CASH PAYMENT
Unlimited Short Call Girls Delhi ✅ 9711199012 FULL CASH PAYMENT
siqbal9337
 
Infineon_AURIX_HSM Revealed_Training_Slides.pdf
Infineon_AURIX_HSM Revealed_Training_Slides.pdfInfineon_AURIX_HSM Revealed_Training_Slides.pdf
Infineon_AURIX_HSM Revealed_Training_Slides.pdf
maicuongdt21
 
Cargador frontal volvo L350F, para el trabajo en cantera en carga de rocas
Cargador frontal volvo L350F, para el trabajo en cantera en carga de rocasCargador frontal volvo L350F, para el trabajo en cantera en carga de rocas
Cargador frontal volvo L350F, para el trabajo en cantera en carga de rocas
Eloy Soto Gomez
 
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
pycfbo
 
一比一原版(ucb毕业证书)白金汉大学毕业证如何办理
一比一原版(ucb毕业证书)白金汉大学毕业证如何办理一比一原版(ucb毕业证书)白金汉大学毕业证如何办理
一比一原版(ucb毕业证书)白金汉大学毕业证如何办理
lfn5dlg2q
 
Cyclone Remal: Assessing Impact and Recovery Efforts
Cyclone Remal: Assessing Impact and Recovery EffortsCyclone Remal: Assessing Impact and Recovery Efforts
Cyclone Remal: Assessing Impact and Recovery Efforts
TycoonSuccess
 
Khushmeet Khushi Resume of manufacturing industry
Khushmeet Khushi Resume of manufacturing industry Khushmeet Khushi Resume of manufacturing industry
Khushmeet Khushi Resume of manufacturing industry
Khushmeet Khushi
 
Unlimited Short Call Girls Noida ✅ 9711199171 FULL CASH PAYMENT
Unlimited Short Call Girls Noida ✅ 9711199171 FULL CASH PAYMENTUnlimited Short Call Girls Noida ✅ 9711199171 FULL CASH PAYMENT
Unlimited Short Call Girls Noida ✅ 9711199171 FULL CASH PAYMENT
siqbal9337
 
Call Girls Hyderabad ☎️ +91-7426014248 😍 Hyderabad Call Girl Beauty Girls Hyd...
Call Girls Hyderabad ☎️ +91-7426014248 😍 Hyderabad Call Girl Beauty Girls Hyd...Call Girls Hyderabad ☎️ +91-7426014248 😍 Hyderabad Call Girl Beauty Girls Hyd...
Call Girls Hyderabad ☎️ +91-7426014248 😍 Hyderabad Call Girl Beauty Girls Hyd...
anilsa9823
 
hays salary report for 2024: check out your salaries here
hays salary report for 2024: check out your salaries herehays salary report for 2024: check out your salaries here
hays salary report for 2024: check out your salaries here
johnconnor370852
 
240613_Semiochemicals semiochemicals market size.pdf
240613_Semiochemicals semiochemicals market size.pdf240613_Semiochemicals semiochemicals market size.pdf
240613_Semiochemicals semiochemicals market size.pdf
Madhura TBRC
 
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENTUnlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
siqbal9337
 
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling PerformanceTop-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Motor Haus
 

Recently uploaded (20)

Unlimited Short Call Girls Thane ✅ 9004268417 FULL CASH PAYMENT
Unlimited Short Call Girls Thane ✅ 9004268417 FULL CASH PAYMENTUnlimited Short Call Girls Thane ✅ 9004268417 FULL CASH PAYMENT
Unlimited Short Call Girls Thane ✅ 9004268417 FULL CASH PAYMENT
 
7 QC Tools ppt for presentation for training purpose
7 QC Tools ppt for presentation for training purpose7 QC Tools ppt for presentation for training purpose
7 QC Tools ppt for presentation for training purpose
 
Call Girls Pune 7023059433 Vip Escorts Service in Pune
Call Girls Pune 7023059433 Vip Escorts Service in PuneCall Girls Pune 7023059433 Vip Escorts Service in Pune
Call Girls Pune 7023059433 Vip Escorts Service in Pune
 
Automotive power train system- A final report
Automotive power train system- A final reportAutomotive power train system- A final report
Automotive power train system- A final report
 
欧洲杯下注-欧洲杯下注下注app-欧洲杯下注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯下注-欧洲杯下注下注app-欧洲杯下注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯下注-欧洲杯下注下注app-欧洲杯下注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯下注-欧洲杯下注下注app-欧洲杯下注盘口app|【​网址​🎉ac22.net🎉​】
 
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdfToyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
 
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
一比一原版科廷大学毕业证(Curtin毕业证书)学历如何办理
 
Unlimited Short Call Girls Delhi ✅ 9711199012 FULL CASH PAYMENT
Unlimited Short Call Girls Delhi ✅ 9711199012 FULL CASH PAYMENTUnlimited Short Call Girls Delhi ✅ 9711199012 FULL CASH PAYMENT
Unlimited Short Call Girls Delhi ✅ 9711199012 FULL CASH PAYMENT
 
Infineon_AURIX_HSM Revealed_Training_Slides.pdf
Infineon_AURIX_HSM Revealed_Training_Slides.pdfInfineon_AURIX_HSM Revealed_Training_Slides.pdf
Infineon_AURIX_HSM Revealed_Training_Slides.pdf
 
Cargador frontal volvo L350F, para el trabajo en cantera en carga de rocas
Cargador frontal volvo L350F, para el trabajo en cantera en carga de rocasCargador frontal volvo L350F, para el trabajo en cantera en carga de rocas
Cargador frontal volvo L350F, para el trabajo en cantera en carga de rocas
 
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
 
一比一原版(ucb毕业证书)白金汉大学毕业证如何办理
一比一原版(ucb毕业证书)白金汉大学毕业证如何办理一比一原版(ucb毕业证书)白金汉大学毕业证如何办理
一比一原版(ucb毕业证书)白金汉大学毕业证如何办理
 
Cyclone Remal: Assessing Impact and Recovery Efforts
Cyclone Remal: Assessing Impact and Recovery EffortsCyclone Remal: Assessing Impact and Recovery Efforts
Cyclone Remal: Assessing Impact and Recovery Efforts
 
Khushmeet Khushi Resume of manufacturing industry
Khushmeet Khushi Resume of manufacturing industry Khushmeet Khushi Resume of manufacturing industry
Khushmeet Khushi Resume of manufacturing industry
 
Unlimited Short Call Girls Noida ✅ 9711199171 FULL CASH PAYMENT
Unlimited Short Call Girls Noida ✅ 9711199171 FULL CASH PAYMENTUnlimited Short Call Girls Noida ✅ 9711199171 FULL CASH PAYMENT
Unlimited Short Call Girls Noida ✅ 9711199171 FULL CASH PAYMENT
 
Call Girls Hyderabad ☎️ +91-7426014248 😍 Hyderabad Call Girl Beauty Girls Hyd...
Call Girls Hyderabad ☎️ +91-7426014248 😍 Hyderabad Call Girl Beauty Girls Hyd...Call Girls Hyderabad ☎️ +91-7426014248 😍 Hyderabad Call Girl Beauty Girls Hyd...
Call Girls Hyderabad ☎️ +91-7426014248 😍 Hyderabad Call Girl Beauty Girls Hyd...
 
hays salary report for 2024: check out your salaries here
hays salary report for 2024: check out your salaries herehays salary report for 2024: check out your salaries here
hays salary report for 2024: check out your salaries here
 
240613_Semiochemicals semiochemicals market size.pdf
240613_Semiochemicals semiochemicals market size.pdf240613_Semiochemicals semiochemicals market size.pdf
240613_Semiochemicals semiochemicals market size.pdf
 
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENTUnlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
 
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling PerformanceTop-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
 

Caterpillar Cat 340F Excavator (Prefix SGH) Service Repair Manual (SGH00001 and up).pdf

  • 2. Shutdown SIS Previous Screen Product: EXCAVATOR Model: 340F EXCAVATOR SGH Configuration: 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine Disassembly and Assembly 340F Excavator Machine Systems Media Number -UENR6797-01 Publication Date -01/09/2015 Date Updated -21/12/2016 i05393341 Swing Drive - Disassemble SMCS - 5459-015 S/N - DKF1-UP S/N - RBC1-UP S/N - SGH1-UP S/N - ZBJ1-UP Disassembly Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 138-7573 Link Bracket 2 B 5P-5197 Retaining Ring Pliers As 1 Start By: a. Remove the swing drive. 1. Position the swing drive onto suitable cribbing. The weight of the swing drive is approximately 281 kg (620 lb). 2. Put an alignment mark on the cover and the housing of the swing drive for assembly purposes. 1/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 3. Illustration 1 g02115775 3. Attach Tooling (A) and a suitable lifting device to cover (2). The weight of cover (2) is approximately 23 kg (51 lb). Remove bolts (1) and cover (2). Illustration 2 g02115813 4. Remove sun gear (3) and spacer (4). 5. Use two people in order to remove carrier assembly (5). The weight of carrier assembly (5) is approximately 23 kg (50 lb). Illustration 3 g02115814 2/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 4. 6. Drive spring pin (10) into planetary shaft (6) with a suitable hammer and a suitable punch. 7. Remove planetary shaft (6), thrust washer (7), thrust washer (11), planetary gear (9), and bearing assembly (8) from the carrier assembly. 8. Remove spring pin (10) from planetary shaft (6) with a suitable hammer and a suitable punch. 9. Repeat Step 6 through Step 8 in order to remove the other three planetary gears from the carrier assembly. Illustration 4 g02115853 10. Remove retaining ring (12) and sun gear (14) from the carrier. 11. Remove retaining ring (13) from sun gear (14). Illustration 5 g02115915 3/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 5. Illustration 6 g02115916 12. Remove spacer (16). 13. Remove retaining ring (15) that holds carrier assembly (17) in position. 14. Use a suitable piece of steel bar stock between the planetary gears in carrier assembly (17). Make sure that the steel bar stock is centered in carrier assembly (17). Attach a suitable lifting device to the steel bar stock. Slowly lift carrier assembly (17) from the swing drive housing. The weight of carrier assembly (17) is approximately 39 kg (86 lb). Illustration 7 g02115917 15. Drive spring pin (22) into planetary shaft (19) with a suitable hammer and a suitable punch. 16. Remove planetary shaft (19), thrust washer (18), thrust washer (23), planetary gear (21), and bearing assemblies (20) from the carrier assembly. 17. Remove spring pin (22) from planetary shaft (19) with a suitable hammer and a suitable punch. 18. Repeat Step 15 through Step 17 in order to remove the other three planetary gears from the carrier assembly. 4/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 6. Illustration 8 g02115919 19. Attach Tooling (A) and a suitable lifting device to ring gear (24). The weight of ring gear (24) is approximately 39 kg (86 lb). Remove ring gear (24). Illustration 9 g02116593 20. Use Tooling (B) in order to remove retaining ring (25). Illustration 10 g03409949 5/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 7. Illustration 11 g03409942 21. Attach Tooling (A) and a suitable lifting device to swing drive housing (26). Position swing drive housing (26) in a suitable press. The combined weight of swing drive housing (26), the pinion shaft, and the bearing cage is approximately 136 kg (300 lb). 22. Position suitable cribbing directly under the pinion shaft in order to prevent the pinion shaft from falling when pressed out. 23. Remove pinion shaft (28) and spacer (27) from swing drive housing (26). 6/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 8. Illustration 12 g03410004 24. Put an alignment mark on cage (30) and swing drive housing (26) for assembly purposes. 25. Remove bolts (29) that secure cage (30) to the swing drive housing. Remove cage (30), O- ring seal (31), and bearing (33). 26. Remove lip seals (28) from cage (30). Illustration 13 g03410014 27. Remove bearing (34) from swing drive housing (26). 7/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 9. Shutdown SIS Previous Screen Product: EXCAVATOR Model: 340F EXCAVATOR SGH Configuration: 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine Disassembly and Assembly 340F Excavator Machine Systems Media Number -UENR6797-01 Publication Date -01/09/2015 Date Updated -21/12/2016 i06272523 Swing Drive - Disassemble SMCS - 5459-015 S/N - EAR1-UP S/N - SGH1-UP S/N - YBF1-UP Disassembly Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 439-3938 Link Bracket 2 Start By: a. Remove the swing drive. Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will prevent dirt from entering the internal mechanism. NOTICE Keep all parts clean from contaminants. Contamination of the hydraulic system with foreign material will reduce the service life of the hydraulic system components. 1/7 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 10. To prevent contaminants from entering the hydraulic system, always plug or cap the lines, fittings, or hoses as they are disconnected. Cover any disassembled components and clean them properly before assembly. Clean the hydraulic system properly after any major component exchange or especially after a component failure, to remove any contamination. 1. Position the swing drive onto suitable cribbing. The weight of the swing drive is approximately 514 kg (1133 lb). 2. Put an alignment mark on the cover and the housing of the swing drive for assembly purposes. Illustration 1 g02115775 3. Attach Tooling (A) and a suitable lifting device to cover (2). The weight of cover (2) is approximately 23 kg (51 lb). Remove bolts (1) and cover (2). Illustration 2 g03879823 4. Remove sun gear (3) and spacer (4). 2/7 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 11. 5. Use two people to remove carrier assembly (5). The weight of carrier assembly (5) is approximately 23 kg (50 lb). Illustration 3 g03879897 6. Remove retaining ring (6). 7. Remove planetary shaft (10), thrust washer (7), thrust washer (11), planetary gear (8), and bearing assembly (9) from the carrier assembly. 8. Repeat Step 4 through Step 7 to remove the other two planetary gears from the carrier assembly. Illustration 4 g03879903 9. Remove retaining ring (12) and sun gear (14) from the carrier. 10. Remove retaining ring (13) from sun gear (14). 3/7 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 12. Illustration 5 g02115915 Illustration 6 g03879905 11. Remove spacer (16). 12. Remove retaining ring (15) that holds carrier assembly (17) in position. 13. Use a suitable piece of steel bar stock between the planetary gears in carrier assembly (17). Make sure that the steel bar stock is centered in carrier assembly (17). Attach a suitable lifting device to the steel bar stock. Slowly lift carrier assembly (17) from the swing drive housing. The weight of carrier assembly (17) is approximately 70 kg (154 lb). Illustration 7 g03879907 4/7 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 13. 14. Drive spring pin (22) into planetary shaft (19) with a suitable hammer and a suitable punch. 15. Remove planetary shaft (19), thrust washers (18), planetary gear (21), and bearing assemblies (20) from the carrier assembly. 16. Remove spring pin (22) from planetary shaft (19) with a suitable hammer and a suitable punch. 17. Repeat Step 14 through Step 16 to remove the other three planetary gears from the carrier assembly. Illustration 8 g03879916 Illustration 9 g03879914 18. Attach Tooling (A) and a suitable lifting device to ring gear (23). The weight of ring gear (23) is approximately 60 kg (132 lb). 19. Remove bolts (24) and ring gear (23). 5/7 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 14. Illustration 10 g02116593 20. Remove retaining ring (25). Illustration 11 g03409949 Illustration 12 g03879933 21. Attach Tooling (A) and a suitable lifting device to swing drive housing (26). Position swing drive housing (26) in a suitable press. The combined weight of swing drive housing (26), the pinion shaft, and the bearing cage is approximately 292 kg (644 lb). 22. Position suitable cribbing directly under the pinion shaft to prevent the pinion shaft from falling when pressed out. 6/7 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 15. 23. Remove pinion shaft (28) and spacer (27) from swing drive housing (26). Illustration 13 g03879949 24. Put an alignment mark on cage (30) and swing drive housing (26) for assembly purposes. 25. Remove bolts (29) that secure cage (30) to the swing drive housing. Remove cage (30), O- ring seal (31), and bearing (33). 26. Remove lip seals (32) from cage (30). Illustration 14 g03410014 27. Remove bearing (34) from swing drive housing (26). Copyright 1993 - 2020 Caterpillar Inc. All Rights Reserved. Private Network For SIS Licensees. Fri Dec 11 11:03:04 UTC+0800 2020 7/7 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 16. Shutdown SIS Previous Screen Product: EXCAVATOR Model: 340F EXCAVATOR SGH Configuration: 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine Disassembly and Assembly 340F Excavator Machine Systems Media Number -UENR6797-01 Publication Date -01/09/2015 Date Updated -21/12/2016 i03873519 Swing Drive - Assemble SMCS - 5459-016 S/N - DKF1-UP S/N - RBC1-UP S/N - SGH1-UP S/N - ZBJ1-UP Assembly Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 138-7573 Link Bracket 2 B 5P-5197 Retaining Ring Pliers As 1 C 5P-3931 Anti-Seize Compound - D 5P-0960 Grease Cartridge - E 1U-8846 Gasket Sealant - 1/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 17. Illustration 1 g02116597 Illustration 2 g02117257 1. Install lip seals (33) in cage (27), as shown. Apply Tooling (D) to the lips of lip seals (33). Install O-ring seal (32). Illustration 3 g02117583 Note: Do not damage the lip seals when cage (27) is installed over pinion shaft (31). 2. Apply Tooling (C) to the inside diameter and the outside diameter of bearing (30). 3. Lower the temperature of pinion shaft (31). Carefully install cage (27) over pinion shaft (31). Use a suitable press in order to install roller bearing (30) on pinion shaft (31). Install spacer (29). 2/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 18. Illustration 4 g02117588 4. Attach Tooling (A) and a suitable lifting device to swing drive housing (28). The weight of swing drive housing (28) is approximately 86 kg (190 lb). Position swing drive housing (28) in a suitable press. 5. Position pinion shaft (31), cage (27), roller bearing (30), and spacer (29) as a unit in swing drive housing (28). Use the suitable press in order to install pinion shaft (31), cage (27), roller bearing (30), and spacer (29) as a unit. Make sure that the alignment marks that were made on cage (27) and on swing drive housing (28) are in alignment. 6. Install bolts (26). Illustration 5 g02117834 7. Reposition swing drive housing (28) with pinion shaft (31) upside-down. The combined weight of swing drive housing (28), pinion shaft (31), and the cage is approximately 136 kg (300 lb). Position the unit in a suitable press. Support the unit on the end of pinion shaft (31). 8. Apply Tooling (C) to the inside diameter and the outside diameter of roller bearing (34). Use a suitable sleeve and a suitable press in order to install roller bearing (34). Install roller bearing (34). 3/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 19. Illustration 6 g02116593 9. Use Tooling (B) to install retaining ring (25). Illustration 7 g02115919 10. Attach Tooling (A) and a suitable lifting device to ring gear (24). Apply Tooling (E) to the mating surface of ring gear (24) and the swing drive housing. Install ring gear (24). Illustration 8 g02115917 Note: Make sure that the spring pin hole in planetary shaft (19) is aligned with the spring pin hole in the carrier. 4/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 20. 11. Install bearing assemblies (20), planetary gear (21), thrust washer (18), thrust washer (23), planetary shaft (19), and spring pin (22) into the carrier. Install spring pin (22) until spring pin (22) is even with the outside surface of the carrier. Align the split in spring pin (22) to the top or the bottom. Illustration 9 g02117533 12. Make a stake mark on each side of the spring pin hole in the carrier, as shown. This will prevent the spring pin from falling out of the spring pin hole. Make a stake mark at Dimension (X). Dimension (X) is 1.5 mm (0.06 inch). 13. Repeat Step 11 through Step 12 in order to install the other three planetary gears in the carrier assembly. Illustration 10 g02115916 Illustration 11 g02115915 5/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 21. 14. Use a suitable piece of steel bar stock between the planetary gears in carrier assembly (17). Make sure that the steel bar stock is centered in carrier assembly (17). Attach a suitable lifting device to the suitable steel bar stock. The weight of carrier assembly (17) is approximately 39 kg (86 lb). Carefully, lower carrier assembly (17) into position in the ring gear. 15. Install retaining ring (15) that secures carrier assembly (17) in position. 16. Install spacer (16). Illustration 12 g02115853 17. Install retaining ring (13) in sun gear (14). 18. Position sun gear (14) in the carrier and install retaining ring (12). Illustration 13 g02115814 19. Install bearing assembly (8), planetary gear (9), thrust washer (7), thrust washer (11), planetary shaft (6), and spring pin (10) in the carrier. Install spring pin (10) until spring pin (10) is even with the outside surface of the carrier. Align the split in spring pin (10) to the top or the bottom. 6/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 22. Illustration 14 g02117533 20. Make a stake mark on each side of the spring pin hole in the carrier, as shown. This will prevent the spring pin from falling out of the spring pin hole. Make a stake mark at Dimension (X). Dimension (X) is 1.5 mm (0.06 inch). 21. Repeat Step 19 through Step 20 in order to install the other three planetary gears in the carrier assembly. Illustration 15 g02115813 22. Use two people in order to install carrier assembly (5). The weight of carrier assembly (5) is approximately 23 kg (50 lb). 23. Install spacer (4) and sun gear (3). Illustration 16 g02115775 7/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 23. 24. Apply Tooling (E) on the mating surfaces of the ring gear and cover (2). Attach Tooling (A) and a suitable lifting device to cover (2). The weight of cover (2) is approximately 23 kg (51 lb). Install cover (2). 25. Install bolts (1). Tighten bolts (1) to a torque of 270 ± 40 N·m (200 ± 30 lb ft). End By: a. Install the swing drive. Copyright 1993 - 2020 Caterpillar Inc. All Rights Reserved. Private Network For SIS Licensees. Fri Dec 11 11:04:01 UTC+0800 2020 8/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 24. Shutdown SIS Previous Screen Product: EXCAVATOR Model: 340F EXCAVATOR SGH Configuration: 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine Disassembly and Assembly 340F Excavator Machine Systems Media Number -UENR6797-01 Publication Date -01/09/2015 Date Updated -21/12/2016 i06273870 Swing Drive - Assemble SMCS - 5459-016 S/N - EAR1-UP S/N - SGH1-UP S/N - YBF1-UP Assembly Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 439-3938 Link Bracket 2 B - Loctite C5A Copper Anti-Seize - C 452-6006 Grease - D - Loctite 5188 - 1/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 25. Thank you very much for your reading. Please Click Here. Then Get COMPLETE MANUAL. NO WAITING NOTE: If there is no response to click on the link above, please download the PDF document first and then click on it.
  • 26. Illustration 1 g02116597 Illustration 2 g02117257 1. Install lip seals (33) in cage (27), as shown. Apply Tooling (C) to the lips of lip seals (33). Install O-ring seal (32). Illustration 3 g02117583 Note: Do not damage the lip seals when cage (27) is installed over pinion shaft (31). 2. Apply Tooling (B) to the inside diameter and the outside diameter of bearing (30). 3. Lower the temperature of pinion shaft (31). Carefully install cage (27) over pinion shaft (31). Use a suitable press to install roller bearing (30) on pinion shaft (31). Install spacer (29). 2/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
  • 27. Illustration 4 g02117588 4. Attach Tooling (A) and a suitable lifting device to swing drive housing (28). The weight of swing drive housing (28) is approximately 148 kg (326 lb). Position swing drive housing (28) in a suitable press. 5. Position pinion shaft (31), cage (27), roller bearing (30), and spacer (29) as a unit in swing drive housing (28). Use the suitable press to install pinion shaft (31), cage (27), roller bearing (30), and spacer (29) as a unit. Make sure that the alignment marks that were made on cage (27) and swing drive housing (28) during the disassembly. 6. Install bolts (26). Illustration 5 g02117834 7. Reposition swing drive housing (28) with pinion shaft (31) upside-down. The combined weight of swing drive housing (28), pinion shaft (31), and the cage is approximately 292 kg (644 lb). Position the unit in a suitable press. Support the unit on the end of pinion shaft (31). 8. Apply Tooling (B) to the inside diameter and the outside diameter of roller bearing (34). Use a suitable sleeve and a suitable press to install roller bearing (34). Install roller bearing (34). 3/8 340F Excavator SGH00001-UP (MACHINE) POWERED BY C9.3 Engine(M007991... 2020/12/11 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...