Manufacturing models and metrics costs

D
D
D. Palani Kumar / Kamaraj College of Engineering & TechnologyD. Palani Kumar / Kamaraj College of Engineering & Technology

Clearly indicated the necessary formulas in Manufacturing models and metrics costs

Manufacturing models and metrics costs

1 of 14
Download to read offline
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book
Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
Ch 3 Manufacturing Models
and Metrics
Learning Objectives:
By the end of the lecture the student should be able to:
Apply mathematical models of production
performance problems.
Explain the concepts of fixed and variable
manufacturing costs
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book
Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
Production Concepts and
Mathematical Models
Production rate Rp
Production capacity PC
Utilization U
Availability A
Manufacturing lead time MLT
Work-in-progress WIP
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book
Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
Operation Cycle Time
Typical cycle time for a production operation:
Tc = To + Th + Tth
where Tc = cycle time, To = processing time for the
operation, Th = handling time (e.g., loading and
unloading the production machine), and Tth = tool
handling time (e.g., time to change tools)
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book
Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
Production Rate
Batch production: batch time Tb = Tsu + QTc
Average production time per work unit Tp = Tb/Q
Production rate Rp = 1/Tp
Job shop production:
For Q = 1, Tp = Tsu + Tc
For quantity high production:
Rp = Rc = 60/Tp since Tsu/Q → 0
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book
Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
Production Capacity
Plant capacity for facility in which parts are made in
one operation (no = 1):
PCw = n Sw Hs Rp
where PCw = weekly plant capacity, units/wk
Plant capacity for facility in which parts require
multiple operations (no > 1):
PCw =
where no = number of operations in the routing
o
psw
n
RHnS
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book
Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover.
Utilization and Availability
Utilization: U =
where Q = quantity actually produced, and PC = plant
capacity
Availability: A =
where MTBF = mean time between failures, and
MTTR = mean time to repair
PC
Q
MTBF
MTTRMTBF −
Ad

Recommended

More Related Content

What's hot

L5 measurement of screw thread
L5 measurement of screw threadL5 measurement of screw thread
L5 measurement of screw threadtaruian
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPmanimaran m
 
Computer Integrated Manufacturing
Computer Integrated Manufacturing Computer Integrated Manufacturing
Computer Integrated Manufacturing Somashekar S.M
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation Prabhu Bose
 
travel chart for plant layout
travel chart for plant layouttravel chart for plant layout
travel chart for plant layoutYash Patel
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems Nityanand Yadav
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow AnalysisKEERTHIVASAN RAVI
 
Industrial engineering and management
Industrial engineering and managementIndustrial engineering and management
Industrial engineering and managementShaikh Zubair
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE NotesAbhay Gore
 
Ch9 computer integrated manufacturing
Ch9 computer integrated manufacturingCh9 computer integrated manufacturing
Ch9 computer integrated manufacturingviswa375
 
Introduction to Geometric Dimensioning and Tolerancing (GD&T)
Introduction to Geometric Dimensioning and Tolerancing (GD&T)Introduction to Geometric Dimensioning and Tolerancing (GD&T)
Introduction to Geometric Dimensioning and Tolerancing (GD&T)Kapil Mukund
 
Introduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptxIntroduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptxChirag Patel
 
Aiar. unit ii. transfer lines
Aiar. unit ii. transfer linesAiar. unit ii. transfer lines
Aiar. unit ii. transfer linesKunal mane
 
Chip formation and types
Chip formation and typesChip formation and types
Chip formation and typesKANNANS94
 
Product Data Management
Product Data ManagementProduct Data Management
Product Data ManagementArchita Singh
 

What's hot (20)

L5 measurement of screw thread
L5 measurement of screw threadL5 measurement of screw thread
L5 measurement of screw thread
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPP
 
Unit 2.1 cim
Unit 2.1 cimUnit 2.1 cim
Unit 2.1 cim
 
Computer Integrated Manufacturing
Computer Integrated Manufacturing Computer Integrated Manufacturing
Computer Integrated Manufacturing
 
Process Planning & Cost Estimation
Process Planning & Cost Estimation Process Planning & Cost Estimation
Process Planning & Cost Estimation
 
Introduction to CIM
Introduction to CIMIntroduction to CIM
Introduction to CIM
 
travel chart for plant layout
travel chart for plant layouttravel chart for plant layout
travel chart for plant layout
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
 
Reliability engineering ppt-Internship
Reliability engineering ppt-InternshipReliability engineering ppt-Internship
Reliability engineering ppt-Internship
 
Industrial engineering and management
Industrial engineering and managementIndustrial engineering and management
Industrial engineering and management
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
Ch9 computer integrated manufacturing
Ch9 computer integrated manufacturingCh9 computer integrated manufacturing
Ch9 computer integrated manufacturing
 
Introduction to Geometric Dimensioning and Tolerancing (GD&T)
Introduction to Geometric Dimensioning and Tolerancing (GD&T)Introduction to Geometric Dimensioning and Tolerancing (GD&T)
Introduction to Geometric Dimensioning and Tolerancing (GD&T)
 
Tpm
TpmTpm
Tpm
 
Introduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptxIntroduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptx
 
Aiar. unit ii. transfer lines
Aiar. unit ii. transfer linesAiar. unit ii. transfer lines
Aiar. unit ii. transfer lines
 
Chip formation and types
Chip formation and typesChip formation and types
Chip formation and types
 
Product Data Management
Product Data ManagementProduct Data Management
Product Data Management
 
cad workstation
cad workstationcad workstation
cad workstation
 

Similar to Manufacturing models and metrics costs

Manufacturing Models and Metrics.pptx
Manufacturing Models and Metrics.pptxManufacturing Models and Metrics.pptx
Manufacturing Models and Metrics.pptxMasAyuHassan1
 
Single-Station Manufacturing Cells
Single-Station Manufacturing CellsSingle-Station Manufacturing Cells
Single-Station Manufacturing CellsVADLAJAGADEESHWARAAC
 
Introduction CIM
Introduction CIMIntroduction CIM
Introduction CIMNafis Ahmad
 
Automated Production Lines.ppt
Automated Production Lines.pptAutomated Production Lines.ppt
Automated Production Lines.pptAbhishekChavan77
 
MT 308 Industrial Automation.ppt
MT 308 Industrial Automation.pptMT 308 Industrial Automation.ppt
MT 308 Industrial Automation.pptMohammedAlobaidy16
 
Automated-Assembly-Systems.ppt
Automated-Assembly-Systems.pptAutomated-Assembly-Systems.ppt
Automated-Assembly-Systems.pptAbhishekChavan77
 
Module 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Module 1 Lecture 1 Introduction To Automation In Production Systems.pptModule 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Module 1 Lecture 1 Introduction To Automation In Production Systems.pptKhalil Alhatab
 
4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...
4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...
4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...RuthviCool1
 
3. industrial control system
3. industrial control system3. industrial control system
3. industrial control systemMahros Darsin
 
2. automation & control technology
2. automation & control technology2. automation & control technology
2. automation & control technologyMahros Darsin
 
Ch 5 Industrial Control Systems.ppt
Ch 5  Industrial Control Systems.pptCh 5  Industrial Control Systems.ppt
Ch 5 Industrial Control Systems.pptKhalil Alhatab
 

Similar to Manufacturing models and metrics costs (20)

Manufacturing Models and Metrics.pptx
Manufacturing Models and Metrics.pptxManufacturing Models and Metrics.pptx
Manufacturing Models and Metrics.pptx
 
Single-Station Manufacturing Cells
Single-Station Manufacturing CellsSingle-Station Manufacturing Cells
Single-Station Manufacturing Cells
 
Introduction CIM
Introduction CIMIntroduction CIM
Introduction CIM
 
Production System-1.ppt
Production System-1.pptProduction System-1.ppt
Production System-1.ppt
 
67034 ch01
67034 ch0167034 ch01
67034 ch01
 
Automated Production Lines.ppt
Automated Production Lines.pptAutomated Production Lines.ppt
Automated Production Lines.ppt
 
Production System-II.ppt
Production System-II.pptProduction System-II.ppt
Production System-II.ppt
 
MT 308 Industrial Automation.ppt
MT 308 Industrial Automation.pptMT 308 Industrial Automation.ppt
MT 308 Industrial Automation.ppt
 
Manual Assembly Lines1
Manual Assembly Lines1Manual Assembly Lines1
Manual Assembly Lines1
 
Automated-Assembly-Systems.ppt
Automated-Assembly-Systems.pptAutomated-Assembly-Systems.ppt
Automated-Assembly-Systems.ppt
 
automation method.ppt
automation method.pptautomation method.ppt
automation method.ppt
 
Automated Assembly Systems
Automated Assembly SystemsAutomated Assembly Systems
Automated Assembly Systems
 
overview of mfg
overview of mfgoverview of mfg
overview of mfg
 
Module 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Module 1 Lecture 1 Introduction To Automation In Production Systems.pptModule 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Module 1 Lecture 1 Introduction To Automation In Production Systems.ppt
 
4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...
4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...
4-Automated material handling systems , AGV Transfer mechanism , Buffer stora...
 
3. industrial control system
3. industrial control system3. industrial control system
3. industrial control system
 
2. automation & control technology
2. automation & control technology2. automation & control technology
2. automation & control technology
 
Chapter 1.pdf
Chapter 1.pdfChapter 1.pdf
Chapter 1.pdf
 
Ch 5 Industrial Control Systems.ppt
Ch 5  Industrial Control Systems.pptCh 5  Industrial Control Systems.ppt
Ch 5 Industrial Control Systems.ppt
 
67042 ch09
67042 ch0967042 ch09
67042 ch09
 

More from D. Palani Kumar / Kamaraj College of Engineering & Technology

More from D. Palani Kumar / Kamaraj College of Engineering & Technology (20)

Disaster Management
Disaster ManagementDisaster Management
Disaster Management
 
Industrial Safety mechanical
Industrial Safety mechanicalIndustrial Safety mechanical
Industrial Safety mechanical
 
Process Planning and Cost Estimation
Process Planning and Cost EstimationProcess Planning and Cost Estimation
Process Planning and Cost Estimation
 
Industrial Safety mech.PPT
Industrial Safety mech.PPTIndustrial Safety mech.PPT
Industrial Safety mech.PPT
 
Unit - I .ppt
Unit - I .pptUnit - I .ppt
Unit - I .ppt
 
UNIT – IV.pptx
UNIT – IV.pptxUNIT – IV.pptx
UNIT – IV.pptx
 
BALLISTIC PARTICLE MANUFACTURING (BPM).pdf
BALLISTIC PARTICLE MANUFACTURING (BPM).pdfBALLISTIC PARTICLE MANUFACTURING (BPM).pdf
BALLISTIC PARTICLE MANUFACTURING (BPM).pdf
 
Additive_Manufacturing_Macro-and-Micro.pdf
Additive_Manufacturing_Macro-and-Micro.pdfAdditive_Manufacturing_Macro-and-Micro.pdf
Additive_Manufacturing_Macro-and-Micro.pdf
 
Laser Engineered Net Shaping.pdf
Laser Engineered Net Shaping.pdfLaser Engineered Net Shaping.pdf
Laser Engineered Net Shaping.pdf
 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
Line balancing
Line balancingLine balancing
Line balancing
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Scope of CIM
Scope of CIMScope of CIM
Scope of CIM
 
Geometric Modelling approaches
Geometric Modelling approachesGeometric Modelling approaches
Geometric Modelling approaches
 
Solid modelling
Solid modellingSolid modelling
Solid modelling
 
CAPP
CAPPCAPP
CAPP
 
PPC
PPCPPC
PPC
 
Benefits of GT
Benefits of GTBenefits of GT
Benefits of GT
 
Components of CIM Systems
Components of CIM SystemsComponents of CIM Systems
Components of CIM Systems
 

Recently uploaded

Final Year Project - Automated web based form filling using OCR.pptx
Final Year Project - Automated web based form filling using OCR.pptxFinal Year Project - Automated web based form filling using OCR.pptx
Final Year Project - Automated web based form filling using OCR.pptxswarajkakade83
 
Earthquake Precursor Detection: Technological challenges and opportunities
Earthquake Precursor Detection:  Technological challenges and opportunitiesEarthquake Precursor Detection:  Technological challenges and opportunities
Earthquake Precursor Detection: Technological challenges and opportunitiesManojKumar5547
 
20CE501PE – INDUSTRIAL WASTE MANAGEMENT.ppt
20CE501PE – INDUSTRIAL WASTE MANAGEMENT.ppt20CE501PE – INDUSTRIAL WASTE MANAGEMENT.ppt
20CE501PE – INDUSTRIAL WASTE MANAGEMENT.pptMohanumar S
 
my goal is place in mnc's companies and got good salary
my goal is place in mnc's companies and got good salarymy goal is place in mnc's companies and got good salary
my goal is place in mnc's companies and got good salarymonoarul2004
 
PetroDara I TransGlobe Energy Training Certificate I 2017
PetroDara I TransGlobe Energy Training Certificate I 2017PetroDara I TransGlobe Energy Training Certificate I 2017
PetroDara I TransGlobe Energy Training Certificate I 2017Abdelrahman Al-Gammal
 
Critical Literature Review Final -MW.pdf
Critical Literature Review Final -MW.pdfCritical Literature Review Final -MW.pdf
Critical Literature Review Final -MW.pdfMollyWinterbottom
 
Pre-assessment & Data Sheet presentation template - 2023.pptx
Pre-assessment & Data Sheet presentation template - 2023.pptxPre-assessment & Data Sheet presentation template - 2023.pptx
Pre-assessment & Data Sheet presentation template - 2023.pptxssuserc79a6f
 
DRONE PRINCIPLES BASIC PRINCIPLE OF FLIGHT
DRONE PRINCIPLES BASIC PRINCIPLE OF FLIGHTDRONE PRINCIPLES BASIC PRINCIPLE OF FLIGHT
DRONE PRINCIPLES BASIC PRINCIPLE OF FLIGHTimman gwu
 
BRINDHA G AD21012 SELF INTRODUCTION.pdf
BRINDHA G  AD21012 SELF INTRODUCTION.pdfBRINDHA G  AD21012 SELF INTRODUCTION.pdf
BRINDHA G AD21012 SELF INTRODUCTION.pdfbrindhaaids12
 
Better Builder Magazine, Issue 48 / Winter 2023
Better Builder Magazine, Issue 48 / Winter 2023Better Builder Magazine, Issue 48 / Winter 2023
Better Builder Magazine, Issue 48 / Winter 2023Better Builder Magazine
 
STATE EXAMS 4000 ONE LINERS TOTHEPOINTBYDHYANPAL.pdf
STATE EXAMS 4000 ONE LINERS TOTHEPOINTBYDHYANPAL.pdfSTATE EXAMS 4000 ONE LINERS TOTHEPOINTBYDHYANPAL.pdf
STATE EXAMS 4000 ONE LINERS TOTHEPOINTBYDHYANPAL.pdfpraveenkumar620098
 
Hydraulics Introduction& Hydrostatics.pdf
Hydraulics  Introduction&   Hydrostatics.pdfHydraulics  Introduction&   Hydrostatics.pdf
Hydraulics Introduction& Hydrostatics.pdfGetacher Teshome
 
ELH – 3.1: ADVANCED DIGITAL COMMUNICATION UNIT – I Digital modulation techniq...
ELH – 3.1: ADVANCED DIGITAL COMMUNICATION UNIT – I Digital modulation techniq...ELH – 3.1: ADVANCED DIGITAL COMMUNICATION UNIT – I Digital modulation techniq...
ELH – 3.1: ADVANCED DIGITAL COMMUNICATION UNIT – I Digital modulation techniq...Kuvempu University
 
Presentation of Helmet Detection Using Machine Learning.pptx
Presentation of Helmet Detection Using Machine Learning.pptxPresentation of Helmet Detection Using Machine Learning.pptx
Presentation of Helmet Detection Using Machine Learning.pptxasmitaTele2
 
Into the World of AI GDSC YCCE PPTX.pptx
Into the World of AI GDSC YCCE PPTX.pptxInto the World of AI GDSC YCCE PPTX.pptx
Into the World of AI GDSC YCCE PPTX.pptxGDSCYCCE
 
Petrogulf Misr I PICO International Training Certificate I 2016
Petrogulf Misr I PICO International Training Certificate I 2016Petrogulf Misr I PICO International Training Certificate I 2016
Petrogulf Misr I PICO International Training Certificate I 2016Abdelrahman Al-Gammal
 
Fundamentals of Data Structure_Unit I.pptx
Fundamentals of Data Structure_Unit I.pptxFundamentals of Data Structure_Unit I.pptx
Fundamentals of Data Structure_Unit I.pptxDr. Madhuri Jawale
 
BCS302-Module 3 -DDCO-Computer structure-VTU 2022 scheme-BCS302.pdf
BCS302-Module 3 -DDCO-Computer structure-VTU 2022 scheme-BCS302.pdfBCS302-Module 3 -DDCO-Computer structure-VTU 2022 scheme-BCS302.pdf
BCS302-Module 3 -DDCO-Computer structure-VTU 2022 scheme-BCS302.pdfciyamala kushbu
 

Recently uploaded (20)

Final Year Project - Automated web based form filling using OCR.pptx
Final Year Project - Automated web based form filling using OCR.pptxFinal Year Project - Automated web based form filling using OCR.pptx
Final Year Project - Automated web based form filling using OCR.pptx
 
Earthquake Precursor Detection: Technological challenges and opportunities
Earthquake Precursor Detection:  Technological challenges and opportunitiesEarthquake Precursor Detection:  Technological challenges and opportunities
Earthquake Precursor Detection: Technological challenges and opportunities
 
20CE501PE – INDUSTRIAL WASTE MANAGEMENT.ppt
20CE501PE – INDUSTRIAL WASTE MANAGEMENT.ppt20CE501PE – INDUSTRIAL WASTE MANAGEMENT.ppt
20CE501PE – INDUSTRIAL WASTE MANAGEMENT.ppt
 
my goal is place in mnc's companies and got good salary
my goal is place in mnc's companies and got good salarymy goal is place in mnc's companies and got good salary
my goal is place in mnc's companies and got good salary
 
PetroDara I TransGlobe Energy Training Certificate I 2017
PetroDara I TransGlobe Energy Training Certificate I 2017PetroDara I TransGlobe Energy Training Certificate I 2017
PetroDara I TransGlobe Energy Training Certificate I 2017
 
Critical Literature Review Final -MW.pdf
Critical Literature Review Final -MW.pdfCritical Literature Review Final -MW.pdf
Critical Literature Review Final -MW.pdf
 
Pre-assessment & Data Sheet presentation template - 2023.pptx
Pre-assessment & Data Sheet presentation template - 2023.pptxPre-assessment & Data Sheet presentation template - 2023.pptx
Pre-assessment & Data Sheet presentation template - 2023.pptx
 
DRONE PRINCIPLES BASIC PRINCIPLE OF FLIGHT
DRONE PRINCIPLES BASIC PRINCIPLE OF FLIGHTDRONE PRINCIPLES BASIC PRINCIPLE OF FLIGHT
DRONE PRINCIPLES BASIC PRINCIPLE OF FLIGHT
 
BRINDHA G AD21012 SELF INTRODUCTION.pdf
BRINDHA G  AD21012 SELF INTRODUCTION.pdfBRINDHA G  AD21012 SELF INTRODUCTION.pdf
BRINDHA G AD21012 SELF INTRODUCTION.pdf
 
Better Builder Magazine, Issue 48 / Winter 2023
Better Builder Magazine, Issue 48 / Winter 2023Better Builder Magazine, Issue 48 / Winter 2023
Better Builder Magazine, Issue 48 / Winter 2023
 
STATE EXAMS 4000 ONE LINERS TOTHEPOINTBYDHYANPAL.pdf
STATE EXAMS 4000 ONE LINERS TOTHEPOINTBYDHYANPAL.pdfSTATE EXAMS 4000 ONE LINERS TOTHEPOINTBYDHYANPAL.pdf
STATE EXAMS 4000 ONE LINERS TOTHEPOINTBYDHYANPAL.pdf
 
Hydraulics Introduction& Hydrostatics.pdf
Hydraulics  Introduction&   Hydrostatics.pdfHydraulics  Introduction&   Hydrostatics.pdf
Hydraulics Introduction& Hydrostatics.pdf
 
ELH – 3.1: ADVANCED DIGITAL COMMUNICATION UNIT – I Digital modulation techniq...
ELH – 3.1: ADVANCED DIGITAL COMMUNICATION UNIT – I Digital modulation techniq...ELH – 3.1: ADVANCED DIGITAL COMMUNICATION UNIT – I Digital modulation techniq...
ELH – 3.1: ADVANCED DIGITAL COMMUNICATION UNIT – I Digital modulation techniq...
 
Presentation of Helmet Detection Using Machine Learning.pptx
Presentation of Helmet Detection Using Machine Learning.pptxPresentation of Helmet Detection Using Machine Learning.pptx
Presentation of Helmet Detection Using Machine Learning.pptx
 
Into the World of AI GDSC YCCE PPTX.pptx
Into the World of AI GDSC YCCE PPTX.pptxInto the World of AI GDSC YCCE PPTX.pptx
Into the World of AI GDSC YCCE PPTX.pptx
 
Petrogulf Misr I PICO International Training Certificate I 2016
Petrogulf Misr I PICO International Training Certificate I 2016Petrogulf Misr I PICO International Training Certificate I 2016
Petrogulf Misr I PICO International Training Certificate I 2016
 
Fundamentals of Data Structure_Unit I.pptx
Fundamentals of Data Structure_Unit I.pptxFundamentals of Data Structure_Unit I.pptx
Fundamentals of Data Structure_Unit I.pptx
 
Solar PPT.pdf
Solar PPT.pdfSolar PPT.pdf
Solar PPT.pdf
 
IGBT.ppt
IGBT.pptIGBT.ppt
IGBT.ppt
 
BCS302-Module 3 -DDCO-Computer structure-VTU 2022 scheme-BCS302.pdf
BCS302-Module 3 -DDCO-Computer structure-VTU 2022 scheme-BCS302.pdfBCS302-Module 3 -DDCO-Computer structure-VTU 2022 scheme-BCS302.pdf
BCS302-Module 3 -DDCO-Computer structure-VTU 2022 scheme-BCS302.pdf
 

Manufacturing models and metrics costs

  • 1. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Ch 3 Manufacturing Models and Metrics Learning Objectives: By the end of the lecture the student should be able to: Apply mathematical models of production performance problems. Explain the concepts of fixed and variable manufacturing costs
  • 2. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Production Concepts and Mathematical Models Production rate Rp Production capacity PC Utilization U Availability A Manufacturing lead time MLT Work-in-progress WIP
  • 3. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Operation Cycle Time Typical cycle time for a production operation: Tc = To + Th + Tth where Tc = cycle time, To = processing time for the operation, Th = handling time (e.g., loading and unloading the production machine), and Tth = tool handling time (e.g., time to change tools)
  • 4. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Production Rate Batch production: batch time Tb = Tsu + QTc Average production time per work unit Tp = Tb/Q Production rate Rp = 1/Tp Job shop production: For Q = 1, Tp = Tsu + Tc For quantity high production: Rp = Rc = 60/Tp since Tsu/Q → 0
  • 5. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Production Capacity Plant capacity for facility in which parts are made in one operation (no = 1): PCw = n Sw Hs Rp where PCw = weekly plant capacity, units/wk Plant capacity for facility in which parts require multiple operations (no > 1): PCw = where no = number of operations in the routing o psw n RHnS
  • 6. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Utilization and Availability Utilization: U = where Q = quantity actually produced, and PC = plant capacity Availability: A = where MTBF = mean time between failures, and MTTR = mean time to repair PC Q MTBF MTTRMTBF −
  • 7. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Availability - MTBF and MTTR Defined
  • 8. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Manufacturing Lead Time (Batch) MLT = no (Tsu + QTc + Tno) where MLT = manufacturing lead time, no = number of operations, Tsu = setup time, Q = batch quantity, Tc cycle time per part, and Tno = non-operation time
  • 9. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Work-In-Process WIP = where WIP = work-in-process, pc; A = availability, U = utilization, PC = plant capacity, pc/wk; MLT = manufacturing lead time, hr; Sw = shifts per week, Hsh = hours per shift, hr/shift ( )( ) w sh AU PC MLT S H
  • 10. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Costs of Manufacturing Operations Two major categories of manufacturing costs: 1. Fixed costs - remain constant for any output level 2. Variable costs - vary in proportion to production output level Adding fixed and variable costs TC = FC + VC(Q) where TC = total costs, FC = fixed costs (e.g., building, equipment, taxes), VC = variable costs (e.g., labor, materials, utilities), Q = output level.
  • 11. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Fixed and Variable Costs
  • 12. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Manufacturing Costs Alternative classification of manufacturing costs: 1. Direct labor - wages and benefits paid to workers 2. Materials - costs of raw materials 3. Overhead - all of the other expenses associated with running the manufacturing firm Factory overhead Corporate overhead
  • 13. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Typical Manufacturing Costs
  • 14. ©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist. No portion of this material may be reproduced, in any form or by any means, without permission in writing from the publisher. For the exclusive use of adopters of the book Automation, Production Systems, and Computer-Integrated Manufacturing, Third Edition, by Mikell P. Groover. Overhead Rates Factory overhead rate: FOHR = Corporate overhead rate: COHR = where DLC = direct labor costs DLC FOHC DLC COHC