Capitol Expressway Light Rail Project         Pedestrian Improvements               Project Update                District...
Project Phasing     • The Capitol Expressway Light Rail Project is       phased with pedestrian and bus improvements      ...
Project Phasing    Pedestrian Improvements (prior to light rail)     •   Continuous pathway on both sides of expressway   ...
Project Phasing    Bus Improvements (prior to light rail)    •    Bus stops at Story Road and Ocala Avenue    •    Eastrid...
Overall Schedule    • Construction for pedestrian               May 2011 to Summer 2012    • Property acquisition for bus ...
Pedestrian Improvements6                             Capitol Expressway LR Project Phase I A
Capitol Expressway Extension     Pedestrian and Bus Improvements                                   Capitol Avenue to Story...
Capitol Expressway Extension     Pedestrian and Bus Improvements                                Between Story Road and Oca...
Capitol Expressway Extension     Pedestrian and Bus Improvements                                              Ocala Avenue...
Capitol Expressway Extension      Pedestrian and Bus Improvements                                    Cunningham Avenue to ...
Capitol Expressway Extension      Pedestrian and Bus Improvements                              Tully Road to Eastridge Tra...
Capitol Expressway Extension      Pedestrian and Bus Improvements                           Eastridge Transit Center to Qu...
Construction Photos      Excavation and grading        along levee slope13                             Capitol Expressway ...
Construction Photos                                    Grading for sidewalk near                                       Cun...
Construction Photos     Pathway north of Tully Road15                                 Capitol Expressway LR Project Phase ...
Construction Photos         Storm Drain Relocation          along Capitol Avenue                                     Formi...
Upcoming SlideShare
Loading in …5
×

Capitol Expressway Light Rail Project – Pedestrian Improvements

1,300 views

Published on

Published in: Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,300
On SlideShare
0
From Embeds
0
Number of Embeds
72
Actions
Shares
0
Downloads
4
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Capitol Expressway Light Rail Project – Pedestrian Improvements

  1. 1. Capitol Expressway Light Rail Project Pedestrian Improvements Project Update District 5 United January 25, 20121
  2. 2. Project Phasing • The Capitol Expressway Light Rail Project is phased with pedestrian and bus improvements prior to Light Rail o Pedestrian Improvements (Phase 1A) o Bus Improvements (Phase 1B) o Light Rail (Phase 2)2 Capitol Expressway Light Rail Project
  3. 3. Project Phasing Pedestrian Improvements (prior to light rail) • Continuous pathway on both sides of expressway • Street lighting and pedestrian lighting along new sidewalk • Landscape buffer between sidewalk and roadway • HOV lanes to remain (will be removed with light rail) • Construction is underway with completion in June 2012 • City to maintain street lights and landscape3 Capitol Expressway Light Rail Project
  4. 4. Project Phasing Bus Improvements (prior to light rail) • Bus stops at Story Road and Ocala Avenue • Eastridge Transit Center: Expanded and reconfigured transit center • Property acquisition began in May 2011 • Design underway and scheduled for completion in early 2012 • Construction anticipated for fall 2012 (pending approval of STIP allocation) Light Rail • Preparing Federal Environmental Document for public comment anticipated for early 20124 Capitol Expressway Light Rail Project
  5. 5. Overall Schedule • Construction for pedestrian May 2011 to Summer 2012 • Property acquisition for bus May 2011 to early 2012 • Federal EIS for public review Early 2012 • Design for bus improvements current to early 2012 • Federal EIS approved Late 2012 • Construction of bus improvements Fall 2012 to end 2014 (pending CTC allocation approval) • Light rail final design and construction to be determined5 Capitol Expressway Light Rail Project
  6. 6. Pedestrian Improvements6 Capitol Expressway LR Project Phase I A
  7. 7. Capitol Expressway Extension Pedestrian and Bus Improvements Capitol Avenue to Story Road Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)7 Capitol Expressway Light Rail Project
  8. 8. Capitol Expressway Extension Pedestrian and Bus Improvements Between Story Road and Ocala Avenue Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)8 Capitol Expressway Light Rail Project
  9. 9. Capitol Expressway Extension Pedestrian and Bus Improvements Ocala Avenue Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)9 Capitol Expressway Light Rail Project
  10. 10. Capitol Expressway Extension Pedestrian and Bus Improvements Cunningham Avenue to Tully Road Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)10 Capitol Expressway Light Rail Project
  11. 11. Capitol Expressway Extension Pedestrian and Bus Improvements Tully Road to Eastridge Transit Center Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)11 Capitol Expressway Light Rail Project
  12. 12. Capitol Expressway Extension Pedestrian and Bus Improvements Eastridge Transit Center to Quimby Road Legend New Sidewalk: Pedestrian Improvements (Phase 1A) New Sidewalk: Bus Improvements (Phase 1B) Existing Sidewalk: to be reconstructed with Bus Improvements Existing Sidewalk to remain Eastridge Transit Center: Reconstructed with Bus Improvements New Landscape Area (Phase 1A) New Tree (Phase 1A)12 Capitol Expressway Light Rail Project
  13. 13. Construction Photos Excavation and grading along levee slope13 Capitol Expressway LR Project Phase I A
  14. 14. Construction Photos Grading for sidewalk near Cunningham Park Conduit for lighting and bus stop14 Capitol Expressway LR Project Phase I A
  15. 15. Construction Photos Pathway north of Tully Road15 Capitol Expressway LR Project Phase I A
  16. 16. Construction Photos Storm Drain Relocation along Capitol Avenue Forming new curb and gutter south of Story Road16 Capitol Expressway LR Project Phase I A

×