Kalorama Community Meeting (July 17, 2014)

  1. 1.   Kalorama  Park  Community  Mee2ng   July  17,  2014   DRAINAGE,  EROSION  &   LANDSCAPING  IMPROVEMENTS   PROJECT  
  2. 2. Agenda       q Introduc3ons   q Rules  of  the  Road   q Completed  Tasks   q Design  Concepts   q Project  Timeline   q Next  Steps   q Contact  Informa3on   q Ques3ons  and  Answers  
  3. 3. Completed  Tasks   Site  Surveys:   •  Topographic  survey  completed  in   late  June  of  2014     •  Lightning  protec3on  (in  progress)     •  Ver3cal  mulching  (in  progress)       Preliminary  Design:   •  Drainage  Improvements   •  Stormwater  Management   •  Landscaping  Improvements      
  4. 4. Site  Plan   Remove  soil   contaminated  with   construc3on  debris   Modify  exis3ng  inlet  &   add  drainage  flume   New  SWM  micro-­‐bioreten3on   facility   Berm  soVening   Remove  exis3ng  pavement   &  install  porous  paving   Relocate  benches   Ver3cal  mulching  &   lightning  protec3on  
  5. 5. Porous  Paving  
  6. 6. Modify  Inlet  &  Add  Drainage  Flume   Before   AVer  
  7. 7. Removal  of  Contaminated  Soils   Removal  of   contaminated  soil  and   replacement  with  new   soil  based  upon  the   June  6,  2012  Volkert   report  and   geotechnical  findings  
  8. 8. Micro-­‐Bioreten2on  Facility  
  9. 9. Bench  Reloca2on  &  Landscape  Addi2on   Reloca3on  of  benches  and  addi3on  of   low  maintenance  plan3ngs  to   discourage  heavy  foot  traffic  through   non-­‐hardscaped  areas  
  10. 10. Ver2cal  Mulching  &  Lightning  Protec2on  
  11. 11. Berm  SoNening   Before   AVer  
  12. 12. Project  Timeline   Site  Surveys           May  -­‐  June  2014   Preliminary  Design  June  -­‐   July  2014   Final  Design     July  -­‐  August  2014   Permi[ng     September  2014   Construc3on     October  2014  -­‐  March  2015  
  13. 13. Eleva&ng  the  Quality  of  Life  in  the  District   Next  Steps   •  DGS/DPR  and  Engineer  will  come  back  at  100%  and  summarize  design  with   community.   •  DGS/DPR  to  procure  a  General  Contractor  to  construc3on  and  address  the   design/construc3on  documents.     •  DGS/DPR  will  provide  periodic  updates  to  the  community  during  the   construc3on  phase  of  the  process.      
  14. 14. Ques2ons  &  Answers   Thank  you  for  your  3me.   Eleva&ng  the  Quality  of  Life  in  the  District   Like  us!     @  Department  of  General  Services  (DGS)   Follow  us!   @  DCDGS  
  15. 15. Contact  Informa2on     Department  of  General  Services  (DGS)     Kenny  Diggs,  Assoc.  Director  of  Government  Affairs  &  Communica3ons   Kenneth.Diggs@dc.gov     Shahrokh  Ghahramani,  Project  Manager   Shahrokh.Ghahramani@dc.gov       Department  of  Parks  &  Recrea2on  (DPR)     Brent  Sisco,  Landscape  Architect   Brent.Sisco@dc.gov          
  16. 16. Kalorama  Park  

×