Consolidated

489 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
489
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Consolidated

  1. 1. Able Data – Reference SitesVizion Apartments, Milton KeynesSummary TV & Satellite System for 405 ApartmentsContact Rob Barker, Electrical Services, BAM Construction. 01727 894 203 Centrum Business Park, Building 4, St Albans, Herts. AL1 2RDLocation Part of the Abbey gate Sainsbury’s development, Milton KeynesContract £350KSystems Fracarro IRS EquipmentTimescales March 2007 - November 2008Contractor BAMProject Able Data were contracted to build an IRS system for the new Abbey gateDescription Sainsbury’s development in Milton Keynes. Over the large development, it was decided to build a separate aerial rig and head end on each main block, subdividing the project into smaller independent units. Each flat was provided with its own TV and Data patch cabinet to allow flexible re-configuration of the services. One of the challenges was to build temporary TV/Sat head ends to accommodate new tenants moving whilst the main development continued.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  2. 2. Able Data – Reference SitesWest Herts CollegeSummary Cabling of new college campusContact Rob Barker BAM Construction Centrium Business Park, Building 4 St Albans, Herts. AL1 2RD Tel: 020 8879 1188Location WatfordContract £500KSystems SYSTIMAX GigaSPEED X10D, Prism CabinetsStart & Finish Jan 2010 – April 2010Contractor BAMProject West Herts College has embarked on a long-term property strategy toDescription modernise its facilities and transform campus life. As part of their plans they have built a new flagship Watford campus offering state-of- the-art facilities in an inspiring environment. Able Data were contracted to install a high performance campus wide structured cabling system. Over three months Able Data installed 7,000 SYSTIMAX Cat6a UTP outlets.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  3. 3. Able Data – Reference SitesVeolia Three Valleys WaterSummary Cabling of buildingContact Bob Davis, Senior ICT Consultant Mace Atelier House, 64 Pratt Street London NW1 0LF Tel: 020 7554 8000Location Hatfield Business Park, HatfieldContract £200KSystems Molex PowerCat 6 UTP Cat6Start & Finish Nov 2008 – Jan 2009Consultant MaceContractor ComoProject Veolia Water (formally Three Valleys Water) consolidated theirDescription offices into the new HUB building in Hatfield, a building to house 750 office staff. Able Data were contracted by Como to install a 3,000 outlet Cat6 data cabling system. Run over four floors, outlets were terminated in a grid of 8-way consolidation points installed under the false floor. Desk outlets were connected to the consolidation points through solid patch lead connections. The project was completed over a period of two months.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  4. 4. Able Data – Reference SitesSouth Thames CollegeSummary Cat6 Cable installation in to a refurbished part of the College Development.Contact Rob Barker BAM Construction Centrium Business Park, Building 4 St Albans, Herts. AL1 2RD Tel: 020 8879 1188Location Wandsworth LondonContract £85KSystems Brand-Rex Cat6 & OM3 Fibre BackboneInstalledStart & April 2010 to Oct 2010FinishConsultant NoneMain BAMContractorProject Able Data installed 1200 Brand-Rex Cat6 Outlets and 288 Fibre Links.Description This was an extremely difficult installation due to the Building Restraints and the age of the Building An important scheduling consideration was the requirement to fit around the School Terms.Picture Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  5. 5. Able Data – Reference SitesMisysSummary Cabling & moves into new headquarters buildingContact Phil Davies, IT Manager. Misys One Kingdom Street, Paddington. W2 6BL Tel: 020 8879 1188Location Paddington, LondonContract £300KSystems Brand-Rex Cat6 & OM3, Cooper B-Line CabinetsStart & Finish Feb – Aug 2008Consultant April ManagementContractor Mastercraft DesignProject Misys were consolidating four regional offices into one newDescription headquarters building. The new offices required 3,000 Brand Rex LSOH Cat6 outlets installed over three floors, each floor being cabled from two patch rooms. Able Data connected the patch rooms through diversely routed OM3 fibre and voice backbones. In the main computer room, Able Data installed Cooper B-Line cabinets, fitted with the Unite Hawki-2 intelligent power monitor and control products. Able Data also managed the movement of 500 users into the new building. Scheduled over five weekends, this included providing an asset register of all of their computer equipment and a full moves service into the new offices, including connection and test of all of the desktop equipment.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  6. 6. Able Data – Reference SitesHBG – Crawley SchoolsSummary Installation of Data/Voice & TV cabling in three Schools.Contact Mr Steve Rooke HBG Construction Merit House, Edgware Road, Colindale, NW9 5AF. Tel: 020 8200 7070Location Crawley, West SussexContract £300KSystems Data: 6,000 Brand-Rex Cat5e Outlets plus OM3 fibre. TV: 1,000 TV outlets. Fracarro K-series head end through Webro CT167/CT100 cables.Start & Finish Feb 2004 – Aug 2005Consultant N/AContractor HBG ConstructionProject HBG have built three new secondary schools in West Sussex, Oriel,Description Ifield and Thomas Bennett. As part of this project, they contracted Able Data to design and install a data cabling and TV distribution system. The data cabling systems are based on the Brand Rex Millenium Cat5e system. In each school, Able Data installed 2,000 RJ45 outlets in class rooms, staff rooms and other locations. These outlets were run back to a number of local patch cabinets, which were in turn connected back to the main computer room via OM3 fibre. The TV distribution system includes 300 class room TV outlets per school. Within each school, these are fed from a single central head end, which is in turn fed from a single set of TV and radio aerials. The head end equipment includes a high quality Fracarro K-series processing system, which as well as providing high quality TV terrestrial analogue and digital channels, presents FM and DAB radio to all outlets. The school can also broadcast channels from their own video sources, such as DVD players, tapes or cameras.Picture Oriel School Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  7. 7. Able Data – Reference SitesFidelity Oakhill Data CentreSummary New Data Centre at the Fidelity HQContact John Brogan, Project Manager Fidelity International Oakhill House, 130 Tonbridge Rd Hildenborough, Kent, TN11 9DZ Tel: 01732 361 144Location Tonbridge, KentContract £2.5MSystems Systimax Cat 6, LazrSPEED 300 OM3, iPatch, CPI Patch FramesInstalled Jul – Oct 2009Project Fidelity International is a world-wide leading investment provider. AsDescription part of their UK data centre consolidation strategy, Fidelity required a new Data Centre facility at its HQ facility at Tonbridge. Spread over two underground data halls and two office floors, the project required the installation of 30,000 Cat6 copper links and 11,000 OM3 duplex fibre links to 300 Rittal cabinets and used more than 700km of cable. All links connect to a patch field of 80 x CPI patch frames, each monitored with the iPatch Intelligent patch system. The Data Centre was cabled overhead on three levels of CPI ladder racking. One of the biggest challenges faced by Able Data was to deliver the required high quality of cabling. To work out the optimum cable routing schemes, Able Data built an offsite mock up of a row of patch frames and the associated cables. To speed up installation whilst minimising unsightly cable slack, Able Data single end pre-terminated all copper and fibre links. The entire installation was completed over a 14 week period. As well as building and configuring a 40,000 port iPatch system to manage patching and monitor network devices, Able Data implemented additional bespoke functionality tailored to Fidelity’s requirements, including auto server provisioning.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  8. 8. Able Data – Reference SitesFidelity InvestmentsSummary Cabling of Fidelity’s Date CentresContact Dexter Baird Oakhill House, 130 Tonbridge Road Hildenborough, Kent TN11 9DZ Tel: 01732 777627Location Acton Colt Data Centre, London Global Switch 2 Data Centre, LondonContract £650K (Total)Systems SYSTIMAX GigaSPEED XL Cat6 SYSTIMAX LazrSPEED OM2, OM3Start & Jan 2003 – May 2003Finish Nov 2005 – Dec 2005 Jul 2006Project In three separate projects, Able Data have cabled Fidelity’s LondonDescription based Data centres. In the first project Able Data supplied and installed thirty data cabinets and the required cabling infrastructure. The initial installation of 4,000 copper links was completed within four weeks. All RJ45 patch panels are of the Avaya Fleximax variety, where standard outlet modules are clipped into the panel. The second and third projects were similar, but on a larger scale. The third project at Global Switch involved 10,000 links, installed over a period of one month, made possible by the use of off site pre- termination, As part of the initial project, Able Installed also 1,000 10Gbit OM2 fibre links, terminated onto SC connector outlets. The later projects used LC connectors.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  9. 9. Able Data – Reference SitesDebenhamsSummary Data Cabling for new and refurbished Department StoresContact Peter Craven, Project Manager. Bedford Road, Park Street, Taunton, Somerset, TA1 4DB Tel: 01823 364 303Location Various retail sites including Hemel Hempstead, Thanet, Woking, Portsmouth & Slough.Contract £150KSystems SYSTIMAX PowerSUM Cat5e & Excel CabinetsStart & November 2004 (Thanet)Finish March 2005 (Portsmouth, Woking, Sough) April 2005 (Hemel Hempstead)Consultant N/AContractor VariousProject Debenhams has an ongoing program of opening new stores. In eachDescription they install a structured cabling system to serve the shop floor tills and pay points as well as the general offices. It is Debenhams policy to use SYSTIMAX PowerSUM cabling throughout. By the nature of shop premises, most of the cabling work is in the ceiling void, requiring the extensive use of platforms. Each store floor will normally have its own cabling cabinet. These cabinets are joined to the master cabinet via either fibre or copper interlinks, depending on the distances involved. Part of this project involved the fast track conversion of three Alders stores to Debenhams in March 2005. This involved the use of three separate cabling teams working on the different sites.Pictures Able Data Installations Plc Tel: 01442 219580 www.ablecable.co.uk
  10. 10. Able Data – Reference SitesChurch CommissionersSummary Installation of Data & Voice Cabling over 6 floorsContact Martyn Chadaway CBI, ‘The Gherkin’, 30 St Mary Axe, London, EC3A 8AD.Location The Corporation of Church House, Church House, Great Smith Street, London. SW1P 3AZ.Contract £180KSystems Tyco Amp Cat6 STP & Quantum Cat5e UTPTimescales September 2006 – March 2007Consultant CBIProject The Corporation of The Church House was founded in 1888 as the ChurchDescription of Englands permanent tribute to Queen Victorias Golden Jubilee. The Church House, a grade II listed building, is the headquarters of the Archbishops Council and all its Boards and Councils as well as of the Church of England Pensions Board and the National Society. It is the meeting-place, twice each year, of the General Synod of the Church of England. Church House also contains a Conference Centre that provides accommodation and facilities for a vast variety of events from AGMs, conferences, dinners and receptions to exhibitions. Able Data were contracted to install 1500 outlets over 6 floors and the conference centre. The key challenge of delivering this project was the complexity of the cable routes. The building is listed and most of the original features of the conference centre, meeting & conference rooms on the Ground and Lower Ground floors could not be changed or put in any risk of being damaged.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  11. 11. Able Data – Reference SitesBucks New University (BNU)Summary Installation of Data & Voice Cabling over 13 FloorsContact Andy MacFarlane BAM Construction Centrium, Griffiths Way St Albans, Herts. AL1 2RDLocation High WycombeContract £150KSystems Excel Cat6Installed Apr 2009 – Dec 2009Contractor BAMProject Buckinghamshire New University’s camp has undergone an extensiveDescription £60m programme of rebuilding in 2009. A new, high-tech learning resources centre, known as the Gateway, forms the focal point of the University’s technology-led learning experience. Able Data were contracted by BAM to install an 1,800 Excel Cat6 UTP cabling system, spread over the six patch rooms on the six floors of the new Gateway building extension. Able Data also installed an Blown Fibre (OM3) & a voice link backbone cabling infrastructure between each patch room and the main computer room on the 4th floor.Picture Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  12. 12. Able Data – Reference SitesAshmolean MuseumSummary Cabling of Major New Building ExtensionContact Dr Jonathan Moffett Ashmolean Museum, Beaumont Street, Oxford OX1 2PHContract £200KSystems Molex Cat6Installed Dec 2008 - Oct 2009Builder BAMProject The Ashmolean Museum, dating from the 17th century, is the oldest public museum in the UK. Award-winning architect Rick Mather created a new building that has doubled the Ashmolean’s gallery space and state-of-the-art facilities. In November 2009, the £61M redevelopment opened to the public. Able Data installed a structured cabling system, consisting of nearly a thousand outlets, spread over 6 floors of the new building extension. Each of the 13 remote patch cabinet locations had a fibre & copper backbone linking to the Basement computer room. As well as the provision of the computer cabinets at each location Able Data supplied & installed an APC UPS & 3Comm Switch. The biggest challenge was the complexity and range of cable routes. Whilst some outlets are located in low floor boxes, others for high gallery points (overhead projectors etc) are at more than eight metres high. Another challenge was fitting cabling around a complex building program; many outlets could not be terminated or tested until after the exhibition cabinets had been installed.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  13. 13. Able Data – Reference SitesAshburton CourtSummary Hampshire County Council Office HQ & Data CentreContact Bob Davis, Senior ICT Consultant Mace Atelier House, 64 Pratt Street London NW1 0LF Tel: 020 7554 8000Location Winchester City CentreContract £850KSystems Nexans Lanmark-6 10G F/UTP, Nexans LANsense System, Excel Cat6Installed Sep 2007 – May 2009Consultant MaceContractor BAMProject In 2009 Hamshire County Council (HCC) completed a major officeDescription refurbishment of its HQ building at Ashburton Court. The conversion of this 1960’s council office building to a naturally ventilated, low energy facility included a heat recovery from the internal Data Centre as a source of heat to service the office areas. Able Data were contracted by BAM to install a data cabling system providing 4,000 Cat6 outlets to the new offices and meeting rooms. Able Data also won the contract to build the new Data Centre facility, completed over eight weeks in Spring 2009. With 70 Prism server cabinets, 5,000 copper links and 2,000 fibre links, this new data centre has become HCC’s primary Data Centre. The facility incorporates leading edge Data Centre technologies to maximise space and power usage and to enable remote operation. Functionality installed by Able Data included a Nexans 10G Ca6a copper cabling system, a Nexans Intelligent Infrastructure Management (IIM) system, Nexans remotely control Intelligent PDU’s and a Data Centre wide Austin Hughes KVM system.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
  14. 14. Able Data – Reference SitesAPAXSummary Molex Cat 6 – OM3Contact Stephen Grabiner 020 7872 6300Location 33 Jermyn Street London SW1Y 6DNContract 130kSystems MolexStart & 6 Month ProjectFinishConsultant CBIContractor ISGProjectDescription Able Data Installations installed a Molex Cat 6 & OM3 Fibre Optic cabling systems over 6 floors of the new London headquarters Building of Apax and Partners in Jermym Street. Apax Partners is a global private equity group that invests in five industry sectors. Founded more than 30 years ago, the firm uses its sector expertise, deep local presence and broad global platform to create value for its stakeholders. The history of Apax is Interwoven with the development of the private equity assest class on both sides of the Atlantic.Pictures Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk

×