Waco District Experience
Project 0-6748:
Narrow Pavement Widening
Don Miller, P.E. – Waco Design
John Jasek, P.E. – Direct...
Waco District
‘Mixed Climate’
30 – 35 inches rain
(when not in drought)
Hot in summer
Cold in winter
Some sulfate soils
He...
FM 56 Bosque County
FM 56 Before Widening
FM 56 Before Widening
FM 56 Before Widening
FM 56 During Construction
FM 56 During Construction
FM 56 During Construction
FM 56 During Construction
FM 56 During Construction
FM 56 During Construction
After level-up
After Seal Coat
FM 56 Finished Product
FM 56 Finished Product
Have Experienced Problems with pavement failures
FM 309 Hill County
FM 309 Finished Product
FM 309 Finished Product
FM 309 Experiencing joint cracking due to drought
FM 309 Experiencing joint cracking due to drought
Questions ???
Narrow Pavement Widening - Waco District
Narrow Pavement Widening - Waco District
Narrow Pavement Widening - Waco District
Narrow Pavement Widening - Waco District
Narrow Pavement Widening - Waco District
Upcoming SlideShare
Loading in …5
×

Narrow Pavement Widening - Waco District

366 views

Published on

This presentation highlights highway pavement widening practices in the Waco District. Prepared by Don Miller and John Jasek. Please remember to cite this research if the information you find here is used.

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
366
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Narrow Pavement Widening - Waco District

  1. 1. Waco District Experience Project 0-6748: Narrow Pavement Widening Don Miller, P.E. – Waco Design John Jasek, P.E. – Director Construction
  2. 2. Waco District ‘Mixed Climate’ 30 – 35 inches rain (when not in drought) Hot in summer Cold in winter Some sulfate soils Heavy clays Heavy trucks
  3. 3. FM 56 Bosque County
  4. 4. FM 56 Before Widening
  5. 5. FM 56 Before Widening
  6. 6. FM 56 Before Widening
  7. 7. FM 56 During Construction
  8. 8. FM 56 During Construction
  9. 9. FM 56 During Construction
  10. 10. FM 56 During Construction
  11. 11. FM 56 During Construction
  12. 12. FM 56 During Construction
  13. 13. After level-up
  14. 14. After Seal Coat
  15. 15. FM 56 Finished Product
  16. 16. FM 56 Finished Product
  17. 17. Have Experienced Problems with pavement failures
  18. 18. FM 309 Hill County
  19. 19. FM 309 Finished Product
  20. 20. FM 309 Finished Product
  21. 21. FM 309 Experiencing joint cracking due to drought
  22. 22. FM 309 Experiencing joint cracking due to drought
  23. 23. Questions ???

×