Future Service Station EnergyFuture Service Station Energy-- FeasibilityFeasibilityBP Case Study – Average Daily kWp Power...
Upcoming SlideShare
Loading in …5
×

Summary & green habitat bp case study

421 views

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
421
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Summary & green habitat bp case study

  1. 1. Future Service Station EnergyFuture Service Station Energy-- FeasibilityFeasibilityBP Case Study – Average Daily kWp Power ConsumptionThe daily average Peak power usage is ± 40 kWp.The daily average Peak power usage is ± 40 kWp.Our System is designed to generate 40 kWp after losses.Our System is designed to generate 40 kWp after losses.Using 260 Watt panels, the quantity needed is 170 Panels with Panels area being 354 mUsing 260 Watt panels, the quantity needed is 170 Panels with Panels area being 354 m²²The cost being approx. R600 000 with R25 000 per month savings.The cost being approx. R600 000 with R25 000 per month savings.Please note that the financial figures are based on the case study, and may vary due to power usage being different for everPlease note that the financial figures are based on the case study, and may vary due to power usage being different for every sy station. To betation. To beable to attain a quotation, please contact us for a feasibility study and a energy audit.able to attain a quotation, please contact us for a feasibility study and a energy audit.www.greenhabitat.co.zawww.greenhabitat.co.za

×