Maurits Perold, Chief Executive Officer, Green Habitat - Mustek

650 views

Published on

With the expected Eskom increases over the next five years, retail petroleum service stations are facing reduced profitability and some even closure as profits are continually eroded by rising operating costs. Electricity is one of the costs that can be managed and self generated.

This conference aims to examine best practices in energy efficiency and unpack the options and complexities of generating electricity from renewable energy specifically for retail fuel sites.

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
650
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Maurits Perold, Chief Executive Officer, Green Habitat - Mustek

  1. 1. Presentation of CapabilitiesFuture Service Station Energy
  2. 2. IndexIntroductionStrategic PartnersProjects Overview / Eskom RebateFuture Service Station EnergyFuture Service Station Energy – Feasibility
  3. 3. Introduction to Green Habitat“Clients team with us knowing they willhave access to our exceptional technicaland advisory skills at any stage of theirproject, from feasibility studies throughthe construction and assetmanagement, and on the businessadvisory and knowledge transfer.”Maurits Perold C.E.O Green HabitatGreen Habitat Consulting was officially established in 2008 and is owner managed ensuring efficiencyand superb services .The Shareholders are from a diverse and experienced Green Industry, offeringoutstanding knowledge and knowhow skills.Green Habitat Consulting specialises in the sustainability of Green Energy, Energy Optimization andEnergy Saving. Technology advanced solutions are offered for on and off-grid applications, making useof the latest and best technologies available in the Green Environment.The services offered are designed to help clients to improve the efficiency in resource utilization, topromote the dimensions of environmental sustainability and the total cost of ownership.A sustainablebusiness depends on the ability to create value in the ever-changing environment
  4. 4. Strategic PartnersMustek combines the best of local assembly capabilities with the multinational product portfolio byaffording its customers a choice of the renowned Mecer brand of computing equipment and abroad range of top-tier ICT brands which address every level of the technology stack.Musteks position in the South African market has been built on an unwavering commitment tocustomer satisfaction, the development of some of the most sought-after relationships in theinternational ICT market, adherence to the most stringent international quality standards andbenchmarks, and a staffing policy that sees it retaining staff that are trained and accredited to thehighest possible level.
  5. 5. Projects Overview30 kWp Grid – Tied Solar System
  6. 6. Projects Overview30kWp Grid –Tied Solar System
  7. 7. Projects Overview30kWp Grid –Tied Solar System
  8. 8. Projects Overview30kWp Grid –Tied Solar System
  9. 9. Projects Overview30kWp Grid –Tied Solar System
  10. 10. Projects Overview30kWp Grid –Tied Solar System
  11. 11. Projects Overview30kWp Grid –Tied Solar System Eskom Rebate
  12. 12. Projects Overview30kWp Grid –Tied Solar System Eskom Rebate
  13. 13. Projects Overview30kWp Grid –Tied Solar System Eskom RebateR 114 005R 16 286 R 16 286 R 16 286R 0R 20 000R 40 000R 60 000R 80 000R 100 000R 120 000InitialPayment…Performance PaymentYear 1Performance PaymentYear 2Performance PaymentYear 3Annualpayments(inmnR)Year
  14. 14. Projects Overview220kWp Grid – Tied Solar System
  15. 15. Projects Overview220kWp Grid –Tied Solar System
  16. 16. Projects Overview220kWp Grid –Tied Solar System
  17. 17. Projects Overview220kWp Grid –Tied Solar System
  18. 18. Projects Overview220kWp Grid –Tied Solar System
  19. 19. Projects Overview220kWp Grid –Tied Solar System
  20. 20. Projects Overview220kWp Grid –Tied Solar System
  21. 21. Future Service Station Energy
  22. 22. Future Service Station Energy
  23. 23. Future Service Station Energy
  24. 24. Future Service Station Energy
  25. 25. Future Service Station Energy
  26. 26. Future Service Station Energy- FeasibilityAccount # 7320063768Daily kWh AverageConsumptionR per kWhDate Days Amt 1 Total Bill AmountBill / Total kWhBill / Amt 1kWhkWh kWh- -26 October 2012 29 27 086 27 086 R 22 871,34 934,00 0,8444 -26 November 2012 31 31 147 31 147 R 26 300,14 1 004,73 0,8444 -26 December 2012 30 29 344 29 344 R 24 778,14 978,14 0,8444 -26 January 2013 31 30 517 30 517 R 25 768,31 984,41 0,8444 -26 February 2013 30 31 834 31 834 R 26 880,87 1 061,15 0,8444 -26 March 2013 29 29 899 29 899 R 25 247,02 1 031,02 0,8444 -26 April 2013 30 31 957 31 957 R 26 984,70 1 065,24 0,8444 -BP Randhart – Electricity Bills October 2012 – April 2013
  27. 27. Future Service Station Energy- Feasibility• Daily average Peak power usage ± 40 kWp• System designed to generate 40 kWp after losses• Using 260 Watt panels quantity needed 170 Panels• Panels area 354 m²BP Randhart – Average Daily kWp Power ConsumptionMP1
  28. 28. Slide 27MP1 Maurits Perold; 2013-05-07
  29. 29. Future Service Station Energy- FeasibilitySolar DesignMP1
  30. 30. Slide 28MP1 Maurits Perold; 2013-05-07
  31. 31. Future Service Station Energy- FeasibilitySolar DesignMP1
  32. 32. Slide 29MP1 Maurits Perold; 2013-05-07
  33. 33. Future Service Station Energy- FeasibilitySolar DesignMP1
  34. 34. Slide 30MP1 Maurits Perold; 2013-05-07
  35. 35. Future Service Station Energy- FeasibilitySolar DesignMP1
  36. 36. Slide 31MP1 Maurits Perold; 2013-05-07
  37. 37. Future Service Station Energy- FeasibilitySolar DesignMP1
  38. 38. Slide 32MP1 Maurits Perold; 2013-05-07
  39. 39. Future Service Station Energy- FeasibilitySolar DesignMP1
  40. 40. Slide 33MP1 Maurits Perold; 2013-05-07
  41. 41. Future Service Station Energy- FeasibilitySolar DesignCanopy 184 Panels391 sqmBuilding / Shop 162 Panels325 sqmCar Wash 16 Panels31,57 sqmGround Mount 44 Panels84,7sqmMP1
  42. 42. Slide 34MP1 Maurits Perold; 2013-05-07
  43. 43. Questions?

×