Virtual information models - Roads

288 views

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
288
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Virtual information models - Roads

  1. 1.
  2. 2. VIM = Virtual Interactive Models<br />Processes are facilitated through a interactive 3D visual workflow everyday. <br />Information and data is transformed into a responsive, intuitive format. <br />It takes 80% less time to understand and comprehend a scenario.<br />This power interfaces across users, stakeholders and professions.<br />
  3. 3. VIM = Virtual Interactive Models<br />In-built Features<br /><ul><li>Shadows
  4. 4. Wireframe view
  5. 5. Walk, drive, fly 1st & 3rd person
  6. 6. Measure
  7. 7. Easy/fast video
  8. 8. Endless Print Screens (perspective and ortho)</li></ul>1. 80% reduction in process time<br />> 300% cost RoI<br />> 500% for brand<br />> 500% for risk<br />2. VIM is ‘always live’. It keeps up.<br />Updates in minutes.<br />3. Created/owned by UC :<br />technology, service and workflow<br />
  9. 9. VIM Roads<br /><ul><li>Experience across large, complex road projects.
  10. 10. Working across phases from concept optioneering through to design then construction and operations.
  11. 11. Sophisticated built-in tools.
  12. 12. Smart traffic system.
  13. 13. High quality visuals.
  14. 14. Preferred supplier and panel member across transport agencies in Qld, Vic, SA and NSW.</li></li></ul><li>Conceptual Changes80% Reduction in Time and Effort<br />Concepts developed in context with continuous visual feedback. <br />Some benefits :<br /><ul><li>Limited inputs/data required for early outputs
  15. 15. Iterate toward a solution
  16. 16. Faster (instant) feedback
  17. 17. Easier to innovate
  18. 18. Clarity for all stakeholders
  19. 19. Continual demonstrations
  20. 20. Minimises project risk</li></ul>Sunshine Coast Busway<br />
  21. 21. Example: VIM Concept ModelWest Link Tunnel - Melbourne<br />Conceptual Tunnel<br /><ul><li>Created in 3 days
  22. 22. Input Data: spline alignment + heights
  23. 23. Continual visual process
  24. 24. Delivered remotely
  25. 25. Output: 50 HD images, Video, virtual model
  26. 26. Saved $$$
  27. 27. Fit for purpose</li></li></ul><li>UC created a functioning concept model of WestLink for the Department of Transport - Victoria in three days.<br />
  28. 28. Example: VIM Concept ModelWindsor Bridge – Showing the community different options<br />Option 1<br />Existing<br />Option 2<br />Workflow<br />10 minute live demonstration in boardroom format.<br />Comprehension of all situational issues immediately<br />Demonstration of option differences interactively<br />Immediate response to queries<br />Verifiable and measurable <br />Issues<br /><ul><li>Sensitive Heritage Issues
  29. 29. Constrained Budget
  30. 30. 6 options
  31. 31. Congestion
  32. 32. Visual impact
  33. 33. Usability
  34. 34. Community impact</li></ul>Windsor Bridge Benefits <br /><ul><li> Built collaboration and trust (between heritage & client).
  35. 35. Transformed anxiety into confidence.</li></ul>Delivering Value: <br />Faster Progress. Reduced process costs. Reduced meetings. <br />
  36. 36. Example: VIM Concept ModelGlenelg Tram Overpass - Adelaide<br />Existing<br />Proposed Design<br />View project from any conceivable angle – instantly. <br />
  37. 37. Signaling & Streetscape Integration<br />
  38. 38. Construction ReviewPlan & Review Construction Sequencing <br />Use 3D workflow to develop, test and demonstrate construction sequences.<br />Saves time and prevents errors.<br />Used for:<br /><ul><li>Methodology
  39. 39. Innovation
  40. 40. Testing
  41. 41. Demonstration
  42. 42. Health and Safety
  43. 43. Instructions and Induction
  44. 44. Relations
  45. 45. Audit Trails</li></ul>Watch Video Here<br />
  46. 46. Vehicle Traffic System<br />The technology includes high quality traffic movements, speeds, acceleration, green-time, cornering, queuing and merging. The system provides a quality visual simulation and representation of traffic movement .<br />Watch Video Here<br />
  47. 47. Vehicle Traffic System Breakdown Analysis<br />Break down a vehicle within the traffic system. Watch the traffic bank up and have an impact.<br />Simply press ‘backspace’ on any selected vehicle to cause smoke<br />Watch Demo Video Here<br />
  48. 48. Road Safety Audit<br />This tool provides vivid 3D real-time feedback for auditing and independent verification of stopping sight distance for single vehicle-to-object scenarios. This is the distance, measured along the carriageway, over which visibility occurs between a driver and an object.<br />- Watch Video Here<br />
  49. 49. OptioneeringSunshine Coast Busway<br />Option 1<br />Every view, measurement and experience is available for decision making with local design integration<br />The simulation demonstrates iterations with options <br />Traffic, terrain and behaviours update automatically with the options.<br />Makes processes faster, clearer and easier<br />Option 2<br />
  50. 50. OptioneeringBaxter Interchange, Victoria<br />Visual Impacts - the UC Solution allows total transparency of design analysis from any point.<br />This is particularly useful when engaging the surrounding community.<br />
  51. 51. OptioneeringBaxter Interchange<br />
  52. 52. Design ReviewAir Train & Airport Link, Brisbane<br />Easy to understand subtle differences in the design <br />Solutions and reasons become obvious to viewers<br /><ul><li>Fast to understand
  53. 53. Make changes on the fly
  54. 54. same day turnarounds for minor changes, 1 week for major</li></ul>Makes decision making easy and obvious and fast!<br />
  55. 55. How we do it?Our Technology<br /><ul><li>5 years R&D
  56. 56. Full production system integrated with specialist technology.
  57. 57. To enable ‘always live’
  58. 58. The solution = a technology enabled visualisation service.
  59. 59. Skilled managers, programmers, technical artists, video, 3D modellers, audio, hardware, software</li></li></ul><li>ReviewWorking Across Divisions<br />Powerful in ‘rapid change’ processes, across disciplines.<br />Uses same data as CAD, Navis Works, Project Wise etc.<br />method<br /><ul><li>Assimilate and merge data
  60. 60. keeps up with design
  61. 61. Updated daily / weekly
  62. 62. distributed to teams remotely
  63. 63. Allows user experiences (drive car, walk, catch train) in 1st/3rd person early in process
  64. 64. Watch demonstration video
  65. 65. Works remote in context</li></li></ul><li>Clipping Plane ViewSouth Road Superway<br /><ul><li>The technology allows auto (default) or manual clipping plane control.
  66. 66. This view allows for a more in depth analysis for any particular project.
  67. 67. Real-time cameras have a far and near clipping plane perpendicular to the line of sight. </li></li></ul><li>VIM AlignmentsVictorian Transport Plan<br /><ul><li>Basic visual of alignment
  68. 68. Promote benefits
  69. 69. Same model used for detail analysis
  70. 70. Same model used across projects:
  71. 71. WestLink, Regional Rail, Truck Action Plan, CBD planning (DPCD, CoM)
  72. 72. Link to UC Website Video</li></li></ul><li>Signal PlacementSouth Road, South Australia<br />Place any asset or object, animated or not, into the scene to test position and sightlines.<br />In-built or custom libraries of assets.<br />Simple transform tool to:<br /><ul><li>Move
  73. 73. Scale
  74. 74. Rotate</li></li></ul><li>VIM For Forums<br />Supporting Community Consultation Process<br />Create excitement, reassurance and credibility by consulting visualy.<br />Benefits:<br /><ul><li>Easy understanding through universal medium
  75. 75. Reduces anxiety and confusion
  76. 76. Less forums and events required
  77. 77. Easy to do, mobile solution
  78. 78. Always satisfies</li></li></ul><li>VIM for Media South Road Superway<br />Visual Quality means extensive use in media (TV, web and print)<br />Leverage your reputation by releasing from concepts and designs into video anytime.<br />Video is captured from visual interactive models directly.<br /><ul><li>More reviews with visual process
  79. 79. Easier to be on-message
  80. 80. Instant images</li></li></ul><li>VIM for Funding & Bids<br />VIM successful across sectors for winning private and public funds.<br />Easier to win funding with compelling interactive 3D visual of project concept or detail<br /><ul><li>Submit as virtual model
  81. 81. Major presentations and pitches
  82. 82. Project appears shovel ready
  83. 83. Adds rigour and professionalism</li></li></ul><li>VIM Launches<br />Present your solutions on big screens and real-time. Nothing is more awe-inspiring and compelling.<br />Get gasps from the audience when you move about freely in high quality visual scene.<br />Use the same model as for Design Review, concepts etc<br />“I was ready to award you the project after seeing that presentation” decision panel member, $5bn project.<br />Launch of winning $5bn project that used VIM for Design Review, bid presentation and launch<br />
  84. 84. Functional Design Briefs<br />Give clear instructions to project teams and third parties.<br />Provides:<br /><ul><li>100% clarity
  85. 85. No ambiguity
  86. 86. Leveraged data
  87. 87. Saves time
  88. 88. avoids confusion
  89. 89. Leverages CAD data
  90. 90. Use model for other processes (eg communications).</li></ul>Cost of vague briefs = confusion, lost time, lost productivity, reworking, failure, reputation.<br />
  91. 91. VIM For Operators<br />Develop and demonstrate the operational processes of systems through the real-time process.<br />Test the chronological and sequential links between events.<br /><ul><li>Demonstrate how the system will work.
  92. 92. Get sign-off and buy-in.
  93. 93. Create video material
  94. 94. Fast process through visual feedback
  95. 95. Promotes innovation and lateral thinking</li></li></ul><li>Intelligent Behaviour<br />Vehicles and Characters<br />Behaving, goal-driven agents (vehicles and characters) provide feedback on use and experience of design.<br />Internal A.I has<br /><ul><li>Complex traffic system
  96. 96. Pedestrian system with avoidance, goals and scripts</li></ul>Can import true simulation package information directly for ‘playback’ (VISSIM, Legion, Paramicsetc)<br />
  97. 97. Project Life Cycle<br />Adapting and keeping up with design changes <br />From the beginning<br />To the end product<br />

×